SF-30-AMD 02.doc

DOC document 61 KB Posted

Attached to
Prefabricated Metal Warehouse Federal contract opportunity
Solicitation number
AG-7512-S-09-0014
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

About this file

SF-30 Amd 02

View the file

Other files for this federal contract opportunity

Other files attached to Prefabricated Metal Warehouse, newest first.
File Type Posted
SF-30-AMD 04.doc DOC document
SF-30-AMD 03.doc DOC document
SF-30-AMD 01.doc DOC document
Atch 8 -Amd 01 Geotechnical Report- Lost Lodge.pdf PDF
Atch 3_Drawings Warehouse-Lost Lodge-1.pdf PDF
Atch 4_Drawings Warehouse-Lost Lodge-2.pdf PDF
Atch 7_Drawings Warehouse-Lost Lodge-5.pdf PDF
Atch 6_Drawings Warehouse-Lost Lodge-4.pdf PDF
Atch 2 WD General Decision 3-6-2009.doc DOC document
Atch 5 Drawings Warehouse-Lost Lodge-3.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE

PAGE

OF

PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1
2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
02
4/1/2009
6. ISSUED BY
CODE

7. ADMINISTERED BY (If other than Item 6 )CODE

USDA Forest Service

Maria E. Borodko

3463 Las Palomas Road

Alamogordo, NM 88310-6992 Same

(()
9A. AMENDMENT OF SOLICITATION NO.
x
AG-7512-S-09-0014

9B. DATED (SEE ITEM 11)

ALL OFFERORS

3/23/2009

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE

FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FORMCHECKBOX

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

FORMCHECKBOX

is extended, FORMCHECKBOX is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATA SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and data specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

Job Code: Budget Object Code:

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS; IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(()
A.

THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B.

THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C.

THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

section F-1

D.

OTHER Specify type of modification and authority)

E. IMPORTANT: Contractor is ( x ) is not, ( ) required to sign this AMENDMENT and return 1 copy with his proposal.

) is required to sign this document and return __1__ copies to the issuing office.

THE PURPOSE OF THIS AMENDMENT IS TO REVISE PAGE 16 OF 46 OF SF-1442 REQUEST FOR QUOTE.

A. SF-1442, CORRECTION TO PAGE 16 OF 46, FAR CLAUSE 52.211-10 TO READ …COMPETION OF WORK WITHIN 100 DAYS.

REPLACEMENT PAGE ATTACHED BELOW. CHANGES INDICATED BY VERTICLE BLACK LINE IN THE RIGHT HAND MARGIN.

B. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED

(Signature of person authorized to sign)

BY _____________________________________________

(Signature of Contracting Officer)

NSN 7540-01-152-8070

30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE

Computer Generated Prescribed by GSA

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

AG-7512-S-09-0014

Sacramento Ranger District

Pre-Fabricated Metal Bldg.

Revised Amd 02-4/1/2009 PAGE 16 of 46 52.246-12 Inspection of Construction (AUG 1996)

SECTION F--DELIVERIES OR PERFORMANCE

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address (es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.242-14 Suspension of Work (APR 1984)

FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 14 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 100. The time stated for completion shall include final cleanup of the premises.

SECTION G--CONTRACT ADMINISTRATION DATA

GOVERNMENT-FURNISHED PROPERTY

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.

{For this Solicitation, there are NO clauses in this Section}

SECTION H--SPECIAL CONTRACT REQUIREMENTS

FAR 52.236-4 Physical Data (APR 1984) Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. (a) The indications of physical conditions on the drawings and in the specifications are the result of SITE INVESTIAGTION MADE WITH A BACKHOE TEST PIT.

{For this Solicitation, there are NO clauses in this Section}

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES