TemperanceRiverBr_Plans_2-6-15.pdf
PDF 6 MB Posted
- Attached to
- Temperance River Bridge Replacement Federal contract opportunity
- Solicitation number
- AG-63A9-S-15-0005
About this file
Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| TempRvrBr_Amendment_3-13-15.pdf | ||
| AG-63A9-S-15-005_Amendment_0002.pdf | ||
| AG-63A9-S-15-0005c.pdf | ||
| TemperanceTechProposalForms.pdf | ||
| TemperanceSupplementalSpecs_020415.pdf | ||
| Temperance_Wage_Decision.pdf | ||
| TempRvrBr_SchofItems_Feb032015.pdf | ||
| AG-63A9-S-15-0005b.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1 of 26
Sheet 2 of 26
Sheet 3 of 26
Sheet 4 of 26
Sheet 5 of 26
Sheet 6 of 26
Sheet 7 of 26
Sheet 8 of 26
Sheet 9 of 26
Sheet 10 of 26
Sheet 11 of 26
Sheet 12 of 26
Sheet 13 of 26
7'-7"
EL 97 6
I
I i'-.
I ('f) I
I
N I
EL. 84.1 I
CL AB_U_T_. - CL BRIDGE
FOOTING OUTLINE~ /"
91-11" / '\. 91-11" r-------~~~--------r-------~~~------~ / 91-811 91-811
91-2~"
~----- - ---------- ~ .-6N "' _I
_ ___ _y
---- _L___~-~ _ ___ ,____..._,_ __,. ;..- Ln
I
N
I
I I "" I
I
N I
,...=6N "' -I
101-31" 2
11 1-0" 11 1-0"
PLAN VIEW
SCALE:~" = 11
Old plan datum = new d t 151 a urn+ .
EL. 95.55
CL BRIDGE
TOP OF FOOTING\
I
I I I
\ BOTTOM OF FOOTING
ELEVATION VIEW
SCALE: X" = 1 I
I ' I ' -..
I I I I
I
I I
I I
7'-7"
I I I I
"" I
I I I I I 0 I I
I i'-.
I
I I I
('f)
I
N
U.S. DEPARTMENT OF AGRICULTURE
FORES: m:ERVICE
:f~RN9.'-r;,'0
REGION NINE
1 Pto,ecc Name
• Temperance River Bridge Replacement
Superior National Forest Tofte Ranger District i Dosignor
I Art Johnston ! R9 East Zone Structural Engineer
~ASTABUTMENT, EXISTING
Dnown PmjedNo.
A.Johnston i a-.. DnowVog Sheel No.
l M.Knutson CAOAAtMNo.
Dale
I 212512oog I Ploner Scl!o Sheet 14 of 16
Sheet 14 of 26 jormes Rectangle jormes Typewritten Text
7'-4"
EL. 97.60
1-
I
> I N / ' I
N /
Cry /
I
I I I ..- I I I
I en 0 I
I I ~ ' I
I ' I I I
I
I b I I b I
I I I
N N EL. 84.35 _l_ I
---CL BRIDGE
CLABUT.
FOOTING OUTLINE~ "'
91-0" 91-011
81-6" 81-611
81-3~" 81-3~"
.I 91-7~"
101-4 11 101-411
PLAN VIEW
SCALE: X" = 11
EL. 95.40
I
CL BRIDGE
TOP OF FOOTING\
I
I I
_l
BOTTOM OF FOOTING
ELEVATION VIEW
SCALE: X" = 11
7'-4"
I
I I
Cry I
I I I I I b
I I ~ I I I
I I
1-b I
N
;u.S. DEPARTMENT OF AGRICUL TURE
FORES:~:ERVICE
I Prqe<:~Nomo I
REGION NINE
Temperance River Bridge Replacement
Superior National Forest Tofte Ranger District
I Designer
Art Johnston R9 East Zona Structural Engineer
!wEST ABUTMENT EXISTING I
Dnown Proied No.
I A.Johnston
' ChecOed Drawv'IQ Sheet No
M.Knutson CAONeriveNo.
Oalo
2/2512009 I Plone• Scale Sheet 15 ol 16
I
I I
Sheet 15 of 26 jormes Rectangle jormes
SOUTH NORTH
- 9" 21-911 121-9" 31-6" 21-011
6" 6" 6" ~~ -~ L =---f-
1 =
Cl BRIDGE ...------r f-- t---- -·- ----#---- - ----- - ----1- -----1----
1 I/ l L I 1\.
b
I
N I en t 1
'9 - l- 1-- -- -- ~ -~- (j)-N ------~----------~-----
I i : ~ ~ l . I I
I ln b
I b
I
N
~ - t--- ~" --- -' ---~OOTINGOUTUNE --.. ¥ I
I
L # 20·-o·- ----"-- - ---- -.r--~~ . • 231-3" .
PLAN VIEW
SCALE: /4" = 11
N! CL PlkR b I u.S. DEPARTMENT OF AGRICULTURE -I
EL. 95.55
T
FORESm.:ERVICE
I b
CL BRIDGE I ~
"" I I
I REGION NINE I
Pt"'j8CtName
Temperance River Bridge 1 I 1 1 I
1f en l12 1f b Replacement
I I b i Co Superior National Forest
I to Tofte Ranger District
TOP OF FOOTING- . I Oes9W I 1\ I Art Johnston
I I 1-
R9 East Zone Structural Engineer
I
"" I cry I
I I
N I Dra<NingTitle
EL. 84.35
N PIER, EXISTING
I
~BOTTOM OF FOOTING
I
I I Dmwn ' ProtoctNo.
A.Johnston i Chocked Orawrng Sheet No 1 ' M.Knutson
CADAretWeNo I I
ELEVATION VIEW Dale I '
SCALE: X" = 11 I 212512009
I PIOtter Scale Shcot 16 or 16
Sheet 16 of 26 jormes Typewritten Text jormes Rectangle jormes Sticky Note Unmarked set by jormes jormes Sticky Note Unmarked set by jormes jormes
Sheet 17 of 26
Sheet 18 of 26
Sheet 19 of 26
Sheet 20 of 26
Sheet 21 of 26
617-60
STANDARD
REG STATE PROJECT
SHEET NO.
U.S. CUSTOMARY STANDARD
SHEET
NUMBER
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FEDERAL LANDS HIGHWAY
STATE
NO.
TOTAL
SHEETS
PROJECT
F
S ta n D r a w
\s t6
.d g n
U
S C u s to m a r y
S e p
:4
A
M
STANDARD APPROVED FOR USE 3/1990
REVISED: 4/1994 6/2005
STEEL-BACKED TIMBER GUARDRAIL
TYPE A & TYPE B
Sheet 22 of 26
STANDARD APPROVED FOR USE 1/1990
DRAFT: 12/2013
REVISED: 4/1994 6/2005
617-61
A
M
D e c e m b e r
U
S C c m y fi le s p w p r o d u c ti o n d m s S ta n d a r d .D
R A
F T .d g n
STATE PROJECT
NUMBER
SHEETREG STATE PROJECT
NO.
SHEET
SHEETS
TOTAL
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
TYPE SBT-FAT
TERMINAL SECTION
STEEL-BACKED TIMBER GUARDRAIL
9" 3" 3"
(mph) (ft)
3.5
5.0
6.5
8.0
30 and less
" thickness32
"4 1" x 18
9"3"3"
(See Note 2
)30' Fl are L ength (min
S e e N o te m in
S e e N o te m in
10'-0" (typ.)
" x 1'-9" bolt with4
" dia. holes (typ.)16
" dia. holes (typ.)16
2'-3"
"4
2'-0"
12"6" c o v e r m in
2'-3"
9"
3"3"
" thick steel bearing plates2
See Standard 617-60, Steel-Backed Timber Guardrail, Extend the fill widening a minimum of 5 feet behind the
" dia. carriage bolt with8
NOTE:
NO SCALE
4.
3.
2.
1.
Flare Rates table.
the road at the maximum rate indicated on the Guardrail the clear zone, it should be flared as far as practical from zone. If the terminal section cannot be located outside guardrail so that the terminal section is outside the clear length and rate required. As directed by the CO, flare the
The guardrail flare shown in the plan view is the minimum guardrail, unless otherwise directed by the CO.
Type B, non-blocked-out guardrail, no blocks are included.
terminal section, except on the concrete anchor. For the
On the Type A, blocked-out guardrail, include the blocks in hardware details.
Type SBTA and SBTB, for timber, structural steel, and
ANGLED STEEL SPLICE PLATE
STEEL BEARING PLATE
APPROACH & DEPARTURE FLARE WITH FLARED ANCHOR TERMINAL (FAT)
CONCRETE ANCHOR
GUARDRAIL FLARE RATE TABLE
PLAN
ELEVATION
DETAIL A SECTION A-A
Design Speed Shy line offset
13:1
16:1
21:1
26:1
7:1
8:1
11:1
14:1 shy line (a:b)
Flare rate inside shy line (a:b)
Flare rate outside bolt slots (typ.)
Steel plate
4°
PostCL hex nut and washer (typ.)
Ground line
V a r ie s
A
A
Type SBT-FAT terminal section
Pay limits for
(See Note 3)
Steel-backed timber guardrail
Shy line (See Note 4)
Block, Type A only hex nut and plate washer
(See table)
Flare rate= a:bb a
Begin Terminal flare (See Note 2)
Edge of pavement
Angled steel splice plate
Ground line
Steel splice plate
Standard post section
Ground line for terminal section
Concrete anchor
See Detail A o ff s e t
S h y l in e o r f la tt e r for offset distance typical section
See roadway
Hinge line of foreslope
Sheet 23 of 26
617-67617-67617-67617-67617-67
NUMBER
U.S. DEPARTMENT OF TRANSPORTATION
TOTAL
SHEETS
PROJECT
f tp
/1
.1
.1
.2 /s td p la n /s t6
.d g n
U
S C u s to m a r y
M a y
:0
P
M
STANDARD APPROVED FOR USE --/----
REVISED:
DRAFT: 3/2008
STEEL-BACKED TIMBER GUARDRAIL
TL-2 TRANSITION TO STRAIGHT
OR CURVED-END STRUCTURE
Sheet 1 of 3
Sheet 24 of 26
NUMBER
U.S. DEPARTMENT OF TRANSPORTATION
TOTAL
SHEETS
PROJECT
f tp
/1
.1
.1
.2 /s td p la n /s t6
.d
S C u s to m a r y
M a y
:0
P
M
STANDARD APPROVED FOR USE --/----
REVISED:
DRAFT: 3/2008
STEEL-BACKED TIMBER GUARDRAIL
TL-2 TRANSITION TO STRAIGHT
OR CURVED-END STRUCTURE
Sheet 2 of 3
617-67
Sheet 25 of 26
NUMBER
U.S. DEPARTMENT OF TRANSPORTATION
TOTAL
SHEETS
PROJECT
f tp
/1
.1
.1
.2 /s td p la n /s t6
.d
S C u s to m a r y
M a y
:0
P
M
STANDARD APPROVED FOR USE --/----
REVISED:
DRAFT: 3/2008
STEEL-BACKED TIMBER GUARDRAIL
TL-2 TRANSITION TO STRAIGHT
OR CURVED-END STRUCTURE
Sheet 3 of 3
617-67Sheet 26 of 26
| TemperanceRiverBr_ApprRailSheets_ver2015.pdf |
| FLH Standard Drawings |
| (M)617-60: Steel-backed Timber Guardrail, Type A and Type B |
| Metric |
| Architectural |
| Traditional |
| WFLHD |
| US Customary |
| Architectural |
| Traditional |
| WFLHD |
| 617-61: Steel-backed Timber Guardrail Terminal Section Type SBT-FAT |
| Metric |
| CFLHD |
| EFLHD |
| WFLHD |
| US Customary |
| CFLHD |
| EFLHD |
| WFLHD |
| (M)617-62: Steel-backed Timber Guardrail Terminal Section, Type SBT-BAT |
| Metric |
| Architectural |
| Traditional |
| WFLHD |
| US Customary |
| Architectural |
| Traditional |
| WFLHD |
| 617-63: Steel-backed Timber Guardrail Around Circular Curves 22 m [70'] Radius and Below |
| Metric |
| CFLHD |
| Sheet 2 of 2 |
| EFLHD |
| Sheet 2 of 2 |
| WFLHD |
| Sheet 2 of 2 |
| US Customary |
| CFLHD |
| Sheet 2 of 2 |
| EFLHD |
| Sheet 2 of 2 |
| WFLHD |
| Sheet 2 of 2 |
| (M)617-64: Steel-backed Timber Guardrail Test Level 2 Connection to Stone Masonry Guardwall |
| Metric |
| Architectural |
| Sheet 2 of 3 |
| Sheet 3 of 3 |
| Traditional |
| Sheet 2 of 3 |
| Sheet 3 of 3 |
| WFLHD |
| Sheet 2 of 3 |
| Sheet 3 of 3 |
| US Customary |
| Architectural |
| Sheet 2 of 3 |
| Sheet 3 of 3 |
| Traditional |
| Sheet 2 of 3 |
| Sheet 3 of 3 |
| WFLHD |
| Sheet 2 of 3 |
| Sheet 3 of 3 |
| (M)617-65: Steel-backed Timber Guardrail Test Level 3 Connection to Stone Masonry Guardwall |
| Metric |
| Architectural |
| Sheet 2 of 2 |
| Traditional |
| Sheet 2 of 2 |
| WFLHD |
| Sheet 2 of 2 |
| US Customary |
| Architectural |
| Sheet 2 of 2 |
| Traditional |
| Sheet 2 of 2 |
| WFLHD |
| Sheet 2 of 2 |
| (M)617-66: Steel-backed Timber Guardrail Connection to Curved Back Structure |
| Metric |
| Architectural |
| Sheet 2 of 3 |
| Sheet 3 of 3 |
| Traditional |
| Sheet 2 of 3 |
| Sheet 3 of 3 |
| WFLHD |
| Sheet 2 of 3 |
| Sheet 3 of 3 |
| US Customary |
| Architectural |
| Sheet 2 of 3 |
| Sheet 3 of 3 |
| Traditional |
| Sheet 2 of 3 |
| Sheet 3 of 3 |
| WFLHD |
| Sheet 2 of 3 |
| Sheet 3 of 3 |
| (M)617-67: Steel-backed Timber Guardrail Test Level 2 Transition to Straight or Curved End Structure |
| Metric |
| Architectural |
| Sheet 2 of 3 |
| Sheet 3 of 3 |
| Traditional |
| Sheet 2 of 3 |
| Sheet 3 of 3 |
| WFLHD |
| Sheet 2 of 3 |
| Sheet 3 of 3 |
| US Customary |
| Architectural |
| Sheet 2 of 3 |
| Sheet 3 of 3 |
| Traditional |
| Sheet 2 of 3 |
| Sheet 3 of 3 |
| WFLHD |
| Sheet 2 of 3 |
| Sheet 3 of 3 |
| (M)617-68: Steel-backed Timber Guardrail Connection to Tubular Steel-backed Timber Bridge Rail |
| Metric |
| Architectural |
| Traditional |
| WFLHD |
| US Customary |
| Architectural |
| Traditional |
| WFLHD |
| 617-69: TL-2 End Terminal for Steel-Backed Timber Guardrail |
| Metric |
| CFLHD |
| EFLHD |
| WFLHD |
| US Customary |
| CFLHD |
| EFLHD |
| WFLHD |
| 617-60t: |
| 617-60a: |
| 617-60w: |
| Region-c: |
| State-c: |
| Project-c: |
| 617-61c: |
| Sheets-c: |
| Region-e: |
| State-e: |
| Project-e: |
| 617-61e: |
| State-w1: |
| Project-w1: |
| 617-61w: |
| State-w2: |
| Project-w2: |
| NPS: |
| Region: |
| State: |
| Project: |
| 617-67t1: |
| Sheets: |
| 617-67a1: |
| State1: |
| Project1: |
| 617-67w1: |
| State2: |
| Project2: |
| 617-67t2: |
| 617-67a2: |
| 617-67w2: |
| 617-67t3: |
| 617-67a3: |
| 617-67w3: |
File details come from the government source that posted it. Updated .