View the file

Other files for this federal contract opportunity

Other files attached to Built-Up Roof Replacement, High-Security Greenhouse, newest first.
File Type Posted
Answers_to_RFIs.docx DOCX document
HSG_Roof_Files _As-Builts.pdf PDF
Amendment_1.pdf PDF
Atch_1 _General_Decision_Number_MD58.pdf PDF
AG-6395-S-17-0011.pdf PDF
Atch_2 _FY_2015_Sustainable_Buildings_Plan_USDA_121015.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation AG-6395-S-17-0011

1. Is there an existing set of as-built drawings and will we have access?

1. Yes, as-built drawings are available at the facility for viewing and may be borrowed. Digital copies are being made up and can be supplied but may take a few extra days. These will be posted to FBO.

1. Is there a staging area?

1. Yes. Staging area was shown to all present at the walk through and is located adjacent to the building.

1. What are the working hours?

1. Monday through Friday 0730-1630. Arrangements can be made for weekend access for work if necessary and with early notification to the Facility Manager.

1. For drawings, will an architect be needed?

1. No, shop drawings will suffice.

1. What building codes are to be followed for this project? This information will be posted soon.

1. Is there a metal sub roof?

1. Yes. This was verified at the site visit and on the as built drawings.

1. Is there a slope on the deck or in the insulation?

1. According to the as-built drawings, there is a ¼” /foot (one quarter inch/foot) roof deck slope.

1. What is the period of performance?

1. PoP is 120 calendar days after notice to proceed.

1. Please advise if there are any biohazard concerns related to sealing the building in ways which may be non-standard to typical NRCA detailing of TPO roofs?

1. No. There are no special concerns.

1. Given the concern for the movement of vectors and pathogens, will any kind of special containment of the building be required when the existing roof is demolished and prior to the new roof being installed?

1. No.

1. Is a special bio-hazard consultant required on the team to develop the proposed demolition and removal procedures that need to be submitted per Sec. 3.0?

1. No.

1. Is the roof currently vented? If it is, will the existing venting system remain or is it to be replaced?

1. The roof is not vented.

1. Section 3.0 indicates “the end result is to match the flat seam metal panels and flashing” on the other existing buildings. Please clarify.

1. This sentence was a typographical error and shall be ignored.