AG-6395-S-17-0011.pdf
PDF 432 KB Posted
- Attached to
- Built-Up Roof Replacement, High-Security Greenhouse Federal contract opportunity
- Solicitation number
- AG-6395-S-17-0011
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Answers_to_RFIs.docx | DOCX document | |
| HSG_Roof_Files _As-Builts.pdf | ||
| Amendment_1.pdf | ||
| Answers_to_RFIs.docx | DOCX document | |
| Atch_1 _General_Decision_Number_MD58.pdf | ||
| Atch_2 _FY_2015_Sustainable_Buildings_Plan_USDA_121015.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
830776
USDA APHIS MRPBS
ASD Procurement Branch
Butler Square, 5th Floor
100 N 6TH STREET
APHIS-MRPBS-ASD-6395
MINNEAPOLIS MN 55403
See block 7
JAMES ROLOFF 612-336-3223
1x 11/10/2016
AG-6395-S-17-0011
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Tax ID Number:
DUNS Number:
Design-build project to replace asphalt built-up roof with thermoplastic polyolefin
(TPO) membrane roofing on High-Security Greenhouse building
This solicitation is set aside for service-disabled veteran-owned small business concerns. Offers are solicited only from service-disabled veteran-owned small business concerns. Offers received from concerns that are not service-disabled veteran-owned small business concerns shall not be considered.
A pre-proposal conference/site visit is scheduled for Nov 22, 2016, at 10 a.m. EST.
See page 35 for further information.
See Section M on the last page of this solicitation for evaluation factors for award.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 120 calendar days and complete it within ________________ ________________ calendar days after receiving
12/13/2016
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
, CST
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA APHIS MRPBS
ASD Procurement Branch
Butler Square, 5th Floor
100 N 6TH STREET
APHIS-MRPBS-ASD-6395
MINNEAPOLIS MN 55403
JAMES G. ROLOFF
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
Solicitation No. AG-6395-S-17-0011
Section C – Description/Specifications/Statement of Work
C.1 Particulars:
1.1 Title: High Security Greenhouse Building Built Up Roof Replacement
1.2 Location: USDA, APHIS, PPQ, National Plant Germplasm Quarantine Center (NPGQC), BARC- East, Building 580, Beltsville, MD 20705
1.3 Project Background: The NPGQC opened in 1979 to safeguard agricultural resources from the risks associated with the entry, establishment, or spread of exotic plant diseases from foreign germplasm to be introduced into the United States. Additional expansion projects at NPGQC in the 1980s and 1990s added facilities for the Plant Protection Quarantine (PPQ), Plant Health Program (PHP), National Botanist’s and Beltsville Plant Inspection Station, and the PPQ Center for Plant Health Science and Technology (CPHST) Beltsville Laboratory. The most recently completed NPGQC expansion added an additional facility for the foreign plant germplasm testing program and included the specially constructed BSL-3 Enhanced Laboratory and Greenhouse. The NPGQC also provides world leadership and excellence to ensure the plant germplasm designated for release into the U.S. Germplasm Resource System is free of exotic plant pathogens and supports the preservation of global plant genetics resources.
The facility has a specialized BSL3-Ag High Security Greenhouse Building that is used to maintain prohibited plant material while they are being tested at NPGQC. The original asphalt built-up roof is over 20 years old and is approximately 4,318 square feet. The roof structure has several penetrations for specialized roof exhaust fans and associated wiring and controls. The structures are sealed throughout to prevent the movement of vectors and plant pathogens from escaping into the surrounding environment. The roof has developed water leaks into the quarantine area compromising the integrity of the containment area. This project involves the replacement of the asphalt built-up roof with a fully adhered Thermoplastic Polyolefin (TPO) membrane roofing system.
1.4 Project Description: USDA requires architectural-engineering design and construction services to replace the asphalt built-up roofing on the High Security Greenhouse building. The Project consists of demolition of selected existing building elements, including removal of the existing asphalt built-up roof, down to the roof deck and the existing roof accessories (including flashing, caulking, sealant), the provision and installation of new fully adhered TPO membrane roofing system with new flashing, sealant. The work also includes provision for Shop Drawings: For roofing system. Include plans, elevations, sections, details, and attachments to other work; base flashings and membrane terminations; sloped and tapered insulation, including slopes; roof plan showing orientation of deck and orientation of membrane roofing and fastening spacings and patterns for mechanically fastened membrane roofing; insulation fastening patterns for corner, perimeter, and field-of-roof locations.
The design shall comply with all federal, state, local building codes and the polycarbonate manufacturer’s installation requirements. The contractor shall develop design layout drawings, specifications, and construction cost estimates for review and approval prior to issuance of the Notice to Proceed.
1.5 Project Data
• USDA Facilities Design Standards http://www.afm.ars.usda.gov/ppweb/PDF/242-01M.pdf http://www.afm.ars.usda.gov/ppweb/PDF/242-01M.pdf
• APHIS Environmental Protection Program:
http://inside.aphis.usda.gov/mrpbs/publications/ep_manual/downloads/environmental_protection_pro gram.pdf
• Preferred Biobased Products found at http://www.biopreferred.gov/ProposedCategories.aspx
• Recommended Recycled-Content Construction Material found at http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm#construct
• USDA Green Purchasing Affirmative Procurement Program:
http://greening.usda.gov/gpapp08.pdf
• Designated Green Products for Federal Procurement www.lbl.gov/Workplace/CFO/pro/DesignatedGreenProducts.xls
• USDA Sustainable Buildings Implementation Plan—See Section J, page 26.
2.0 PROJECT CONTACTS:
2.1 Contracting Officer (CO)
James Roloff USDA, APHIS, AAMD Procurement Branch Butler Square, Suite 510C 100 N. 6th Street Minneapolis, MN 55403 Tel. No.: 612-336-3223 Email: James.G.Roloff@aphis.usda.gov
2.2 Contracting Officer’s Representative (COR)
Chester Carroll
USDA, APHIS, PPQ, RMS
Bldg. 580, BARC-EAST Beltsville, Maryland, 20705 Tel. No.: 301-313-9251 Email: chester.carroll@aphis.usda.gov
2.3 Engineer Project Manager (EPM)
Toni Mitchell
USDA, APHIS, AAMD, ESB
4700 River Road, Unit 115 Riverdale, MD 20737 - 1238 Tel. No.: (301) 851-2630 E-mail: toni.t.mitchell@aphis.usda.gov
2.4 Program Project Manager (PPM):
http://inside.aphis.usda.gov/mrpbs/publications/ep_manual/downloads/environmental_protection_program.pdf http://inside.aphis.usda.gov/mrpbs/publications/ep_manual/downloads/environmental_protection_program.pdf http://www.biopreferred.gov/ProposedCategories.aspx http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm%23construct http://greening.usda.gov/gpapp08.pdf http://www.lbl.gov/Workplace/CFO/pro/DesignatedGreenProducts.xls mailto:James.G.Roloff@aphis.usda.gov mailto:chester.carroll@aphis.usda.gov mailto:toni.t.mitchell@aphis.usda.gov
Paul Perry NPGQC Facility Manager
USDA, APHIS, PPQ, RMS
BARC-EAST Bldg# 580 Powder Mill Road Beltsville, Maryland 20705 Tel. No.: 301-313-9250 E-mail: paul.a.perry@aphis.usda.gov
2.5 PPQ National Facility Manager:
Wendell Leonard National Facility Manager
USDA, APHIS, PPQ
4700 River Road, Unit 130 Riverdale, Maryland 20737 Tel. No.: 301-851-2648 E-mail: wendell.l.leonard@aphis.usda.gov
2.6 USDA Safety, Health and Environmental Specialists:
Gerald Houvener Industrial Hygienist Program Manager
USDA, APHIS, MRPBS, EMSSD, SHEPB
4700 River Road, Unit 124 Riverdale, MD 20737-1238 Tel. No.: (301) 436-3150 Email: Gerald.Houvener@aphis.usda.gov
Daniel Z. Weissman Environmental Program Manager
USDA, APHIS, EMSSD, SHEPB
4700 River Road, Unit 124 Riverdale, MD 20737-1238 Tel. No.: (301) 436-3114 Email: Daniel.Z.Weissman@aphis.usda.gov
3.0 PROJECT SCOPE
The Contractor shall evaluate the requirement of replacing the existing roofing and siding system for sustainability purposes and environmental concerns. The Contractor shall provide options for a more environmentally friendly, energy efficient roof and siding system(s) for the building options along with cost estimates shall be submitted to USDA for review, evaluation and direction. The Contractor shall keep in mind that the end result is to match the flat seam metal panels and flashing that are on the existing High Security Greenhouse and Support Buildings. Once a system is agreed upon, the Contractor shall provide shop drawings for the new system for USDA’s review and approval.
The Contractor shall also submit a Demolition Plan containing the proposed demolition and removal procedures for approval by the Program Project Manager (PPM) and Contracting Officer’s Representative (COR) prior to commencement of any demolition work. Demolition shall be performed in such a manner as to eliminate hazards to persons and property; to minimize interference with the use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of mailto:paul.a.perry@aphis.usda.gov mailto:wendell.l.leonard@aphis.usda.gov mailto:Gerald.Houvener@aphis.usda.gov mailto:Daniel.Z.Weissman@aphis.usda.gov structures. The Contractor shall provide safeguards, including warning signs, barricades, temporary fences, warning lights, and other similar items that are required for protection of all personnel during demolition and removal operations. Debris including the lead-coated siding/roof panels, accessories and similar materials shall become property of the Contractor and shall be disposed of, off the Beltsville Agriculture Research Center (BARC) property.
The Contractor shall furnish and install a TPO Roofing System to meet the following:
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING
PART 1 GENERAL
1.1 SUMMARY
A. Section Includes:
1. Adhered TPO membrane roofing system.
2. Wood blocking.
3. Roof insulation.
1.2 DEFINITIONS
A. TPO: Thermoplastic polyolefin.
B. Roofing Terminology: See ASTM D 1079 and glossary in NRCA's "The NRCA Roofing and Waterproofing Manual" for definitions of terms related to roofing work in this Section.
1.3 PERFORMANCE REQUIREMENTS
A. General Performance: Installed membrane roofing and base flashings shall withstand specified uplift pressures, thermally induced movement, and exposure to weather without failure due to defective manufacture, fabrication, installation, or other defects in construction.
Membrane roofing and base flashings shall remain watertight.
B. Material Compatibility: Provide roofing materials that are compatible with one another under conditions of service and application required, as demonstrated by membrane roofing manufacturer based on testing and field experience.
C. Roofing System Design: Provide membrane roofing system that is identical to systems that have been successfully tested by a qualified testing and inspecting agency to resist uplift pressure calculated according to ASCE/SEI 7.
D. FM Approvals Listing: Provide membrane roofing, base flashings, and component materials that comply with requirements in FM Approvals 4450 and FM Approvals 4470 as part of a membrane roofing system, and that are listed in FM Approvals' "RoofNav" for Class 1 or noncombustible construction, as applicable.
Identify materials with FM Approvals markings.
1. Fire/Windstorm Classification: Class 1A-90.
1.4 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Shop Drawings: For roofing system. Include plans, elevations, sections, details, and attachments to other work.
1. Base flashings and membrane terminations.
2. Sloped and tapered insulation, including slopes.
3. Roof plan showing orientation of deck and orientation of membrane roofing and fastening spacings and patterns for mechanically fastened membrane roofing.
4. Insulation fastening patterns for corner, perimeter, and field-of-roof locations.
C. Samples for Verification: For the following products:
1. Sheet roofing, of color specified.
2. Roof insulation.
3. Walkway pads or rolls.
D. Qualification Data: For qualified Installer and manufacturer.
E. Manufacturer Certificates: Signed by roofing manufacturer certifying that the roofing system complies with requirements specified in "Performance Requirements" Article.
1. Submit evidence of compliance with performance requirements.
F. Field tests.
G. Field quality-control reports.
H. Maintenance Data: For roofing system to include in maintenance manuals.
I. Warranties: Sample of special warranties.
1.5 QUALITY ASSURANCE
A. Manufacturer Qualifications: A qualified manufacturer that is UL listed for membrane roofing system identical to that used for this Project.
B. Installer Qualifications: A qualified firm that is approved, authorized or licensed by membrane roofing system manufacturer to install manufacturer's product and that is eligible to receive manufacturer's special warranty.
C. Source Limitations: Obtain components including roof insulation fasteners for membrane roofing system from same manufacturer as membrane roofing or approved by membrane roofing manufacturer.
D. Fire-Resistance Ratings: Where indicated, provide fire-resistance-rated roof assemblies identical to those of assemblies tested for fire resistance per ASTM E 119 by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.
E. Preinstallation Roofing Conference: Before starting roof deck construction, conduct conference at Project site.
1. Meet with COR, Professional, testing and inspecting agency representative, roofing Installer, roofing system manufacturer's representative, and installers whose work interfaces with or affects roofing, including installers of roof accessories and roof-mounted equipment.
2. Review methods and procedures related to roofing installation, Including manufacturer's written instructions.
3. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.
4. Review deck substrate requirements for conditions and finishes, including flatness and fastening.
5. Review structural loading limitations of roof deck during and after roofing.
6. Review base flashings, special roofing details, roof drainage, roof penetrations, equipment curbs, and condition of other construction that will affect roofing system.
7. Review governing regulations and requirements for insurance and certificates if applicable.
8. Review temporary protection requirements for roofing system during and after installation.
9. Review roof observation and repair procedures after roofing installation.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Deliver roofing materials to Project site in original containers with seals unbroken and labeled with manufacturer's name, product brand name and type, date of manufacture, approval or listing agency markings, and directions for storing and mixing with other components.
B. Store liquid materials in their original undamaged containers in a clean, dry, protected location and within the temperature range required by roofing system manufacturer. Protect stored liquid material from direct sunlight.
1. Discard and legally dispose of liquid material that cannot be Applied within its stated shelf life.
C. Protect roof insulation materials from physical damage and from deterioration by sunlight, moisture, soiling, and other sources. Store in a dry location. Comply with insulation manufacturer's written instructions for handling, storing, and protecting during installation.
D. Handle and store roofing materials and place equipment in a manner to avoid permanent deflection of deck.
1.7 PROJECT CONDITIONS
A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing system to be installed according to manufacturer's written instructions and warranty requirements.
1.8 WARRANTY
A. Special Warranty: Manufacturer's Total System standard or customized form, without monetary limitation, in which manufacturer agrees to repair or replace components of membrane roofing system that fail in materials or workmanship within specified warranty period.
1. Special warranty includes membrane roofing, base flashings, Roof insulation, fasteners, cover boards, substrate board, roofing accessories, roof pavers, and other components of membrane roofing system.
2. Warranty Period: 20 years from date of Substantial Completion.
B. Special Project Warranty: Submit roofing Installer's warranty, on warranty form at end of this Section, signed by Installer, covering the Work of this Section, including all components of membrane roofing system such as membrane roofing, base flashing, roof insulation, fasteners, cover boards, substrate boards, vapor retarders, roof pavers, and walkway products, for the following warranty period:
1. Warranty Period: Two years from date of Substantial Completion.
PART 2 PRODUCTS
2.1 TPO MEMBRANE ROOFING
A. Fabric-Reinforced Thermoplastic Polyolefin Sheet: ASTM D 6878, Internally fabric or scrim reinforced, uniform, flexible TPO sheet.
1. Manufacturers: Subject to compliance with requirements, Available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
a. Carlisle SynTec Incorporated.
b. Firestone Building Products Company.
c. GAF Materials Corporation.
d. Sika Surafil.
e. Approved Equivalent
2. Thickness: 60 mils, nominal.
3. Exposed Face Color: White.
2.2 AUXILIARY MEMBRANE ROOFING MATERIALS
A. General: Auxiliary membrane roofing materials recommended by roofing system manufacturer for intended use, and compatible with membrane roofing.
1. Liquid-type auxiliary materials shall comply with VOC limits of authorities having jurisdiction.
2. Adhesives and sealants that are not on the exterior side of weather barrier shall comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D (EPA Method 24):
a. Plastic Foam Adhesives: 50 g/L.
b. Gypsum Board and Panel Adhesives: 50 g/L.
c. Multipurpose Construction Adhesives: 70 g/L.
d. Fiberglass Adhesives: 80 g/L.
e. Contact Adhesive: 80 g/L.
f. Other Adhesives: 250 g/L.
g. Single-Ply Roof Membrane Sealants: 450 g/L.
h. Nonmembrane Roof Sealants: 300 g/L.
i. Sealant Primers for Nonporous Substrates: 250 g/L.
j. Sealant Primers for Porous Substrates: 775 g/L.
B. Flashing Membrane: Manufacturer's standard unreinforced Thermoplastic polyolefin sheet flashing, 55 mils thick, minimum, of same color as sheet membrane.
C. Bonding Adhesive: Manufacturer's standard, water based.
D. Metal Termination Bars: Manufacturer's standard, predrilled stainless-steel or aluminum bars, approximately 1 by 1/8 inch thick; with anchors.
E. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion-resistance provisions in FM Approvals 4470, designed for fastening membrane to substrate, and acceptable to membrane roofing system manufacturer. Coordinate with pullout test results and various substrates.
F. Miscellaneous Accessories: Provide pourable sealers, preformed cone and vent sheet flashings, preformed inside and outside corner sheet flashings, T-joint covers, lap sealants, termination reglets, relief vents and other accessories as recommended by roofing manufacturer.
G. Fasteners and Anchors for Wood Blocking:
1. Fasteners: Hot dipped zinc coated steel conforming to ASTM A 153 or AISI 304 type stainless steel, for high humidity and treated wood locations, unfinished steel elsewhere.
2. Anchors: Toggle bolt type for anchorage to hollow masonry.
Expansion shield and lag bolt type for anchorage to solid masonry or concrete. Bolt or ballistic fastener for anchorages to steel.
H. Boots: Premolded flexible boot and collar for pipe stacks through membrane, compatible with membrane.
2.3 VAPOR RETARDER
A. Vapor Retarder: 40 mil thick composite consisting of 32 mil self-adhering rubberized asphalt membrane laminated to an 8 mil spun bonded polyester fabric which has a permeability rating of 0.05 perms in conformance with ASTM E 96. Manufacturer and product compatible with roofing system and roofing membrane.
1. Tape: Pressure-sensitive tape of type recommended by vapor- Retarder manufacturer for sealing joints and penetrations in vapor retarder.
2.4 ROOF INSULATION
A. General: Preformed roof insulation boards manufactured or approved by TPO membrane roofing manufacturer, selected from manufacturer's standard sizes suitable for application, of thicknesses indicated.
B. Polyisocyanurate Board Insulation: ASTM C 1289, Type II, felt or glass Fiber mat facer on both major surfaces, and the following:
1. Board Density: 1.6 lb. /cu ft. minimum.
2. Board Size: Most economical.
3. Board Thickness: As indicated on Drawings.
4. Board Edges: Square.
5. Polyisocyanurate Aged Thermal Conductivity: R value of 7 for one inch insulation thickness.
6. Compressive Strength: Minimum 16 psi for polyisocyanurate.
7. Insulation shall be as recommended by roofing manufacturer.
8. Insulation shall comply with requirements of FM 4450 or UL 1256.
9. Insulation shall have a minimum recycle content of 30 percent of pre- and post-consumer recycle content.
10. Insulation shall incorporate HCFC-free blowing agent.
C. Tapered Insulation: Provide factory-tapered insulation boards fabricated to slope of 1/8 inch per 12 inches or 1/4 inch per 12 inches as required to achieve low point and high point thicknesses indicated on drawings.
D. Provide preformed saddles, crickets, tapered edge strips, and other insulation shapes where indicated for sloping to drain. Fabricate to slopes indicated.
2.5 INSULATION ACCESSORIES
A. General: Furnish roof insulation accessories recommended by insulation manufacturer for intended use and compatibility with membrane roofing.
B. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion-resistance provisions in FM Approvals 4470, designed for fastening roof insulation and cover boards to substrate, and acceptable to roofing system manufacturer.
C. Modified Asphaltic Insulation Adhesive: Insulation manufacturer's recommended modified asphalt, asbestos-free, cold-applied adhesive formulated to attach roof insulation to substrate or to another insulation layer.
D. Bead-Applied Insulation Adhesive: Insulation manufacturer's recommended bead-applied, low-rise, one- or multicomponent urethane adhesive formulated to attach roof insulation to substrate or to another insulation layer.
E. Full-Spread Applied Insulation Adhesive: Insulation manufacturer's recommended spray-applied, low-rise, two-component urethane adhesive formulated to attach roof insulation to substrate or to another insulation layer.
F. Cover Board: ASTM C 1177/C 1177M, glass-mat, water-resistant Gypsum substrate, 1/2 inch thick, factory primed.
1. Products: Subject to compliance with requirements, available Products that may be incorporated into the Work include, but are not limited to, the following:
a. Georgia-Pacific Corporation; Dens Deck Prime.
b. Or approved equal.
2.6 WALKWAYS
A. Flexible Walkways: Factory-formed, nonporous, heavy-duty, slip-resisting, surface-textured walkway rolls, approximately 3/16 inch thick, and acceptable to membrane roofing system manufacturer.
2.7 WOOD BLOCKING
A. Wood Blocking: SPIB Grading rules (Southern Pine Inspection Bureau):
Stress Group D, Southern Yellow Pine species Structural #2 or better grade, 19 percent maximum moisture content after treatment, pressure preservative treat with salt preservatives where required and indicated.
2.8 ACCESSORIES
A. Roof Drain Domes and Locking Rings: ANSI A112.21.2; lacquered cast iron, removable cast iron dome strainer, membrane flange and membrane locking ring with integral gravel stop; similar to Series 21500-AE as manufactured by Josam Manufacturing Co. Sizes shall be as required to match existing drain body.
B. Pipe supports shall be as manufactured by Miro Industries Inc. or approved equal. Supports shall be designed as rooftop pipe supports consisting of base and U shaped housing; be of a polycarbonate molded base, UV resistant; height shall be approximate 2 inch high; support required pipe/conduit size.
Maximum load weight of each pipe support shall be minimum 80 pounds per stand.
C. Base shall have slightly radiused edges to prevent gouging of roof membrane.
PART 3 EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with the following requirements and other conditions affecting performance of roofing system:
1. Verify that roof openings and penetrations are in place and curbs are set and braced and that roof drain bodies are securely clamped in place.
2. Verify that wood blocking, curbs, and nailers are securely anchored to roof deck at penetrations and terminations and that nailers match thicknesses of insulation.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Clean substrate of dust, debris, moisture, and other substances detrimental to roofing installation according to roofing system manufacturer's written instructions. Remove sharp projections.
B. Prevent materials from entering and clogging roof drains and conductors and from spilling or migrating onto surfaces of other construction. Remove roof-drain plugs when no work is taking place or when rain is forecast.
C. Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing system at the end of the workday or when rain is forecast. Remove and discard temporary seals before beginning work on adjoining roofing.
D. Install wood blocking where required by roofing manufacturer for system and where indicated on Drawings.
E. Where preservative treated wood is adjacent to, or in contact with galvanized material, provide a separator sheet such as one layer of building paper to isolate wood.
3.3 VAPOR-RETARDER INSTALLATION
A. Install vapor retarder to deck in accordance with manufacturer’s recommendations.
B. Completely seal vapor retarder at terminations, obstructions, and penetrations to prevent air movement into membrane roofing system.
3.4 INSULATION INSTALLATION
A. Coordinate installing membrane roofing system components so insulation is not exposed to precipitation or left exposed at the end of the workday.
B. Comply with membrane roofing system and insulation manufacturer's written instructions for installing roof insulation.
C. Install tapered insulation under area of roofing to conform to slopes indicated.
D. Install insulation under area of roofing to achieve required thickness.
Where overall insulation thickness is 2.7 inches or greater, install two or more layers with joints of each succeeding layer staggered from joints of previous layer a minimum of 6 inches in each direction.
1. Where installing composite and noncomposite insulation in two or more layers, install noncomposite board insulation for bottom layer and intermediate layers, if applicable, and install composite board insulation for top layer.
E. Trim surface of insulation where necessary at roof drains so completed surface is flush and does not restrict flow of water.
F. Install insulation with long joints of insulation in a continuous straight line with end joints staggered between rows, abutting edges and ends between boards. Fill gaps exceeding 1/4 inch with insulation.
1. Cut and fit insulation within 1/4 inch of nailers, projections, and penetrations.
G. Mechanically Fastened Insulation: Install each layer of insulation and secure to deck using mechanical fasteners specifically designed and sized for fastening specified board-type roof insulation to deck type.
1. Fasten insulation according to requirements in FM Approvals'
"RoofNav" for specified Windstorm Resistance Classification.
2. Fasten insulation to resist uplift pressure at corners, perimeter, and field of roof.
H. Install cover boards over insulation with long joints in continuous straight lines with end joints staggered between rows. Offset joints of insulation below a minimum of 6 inches in each direction. Loosely butt cover boards together and fasten to roof deck.
1. Fasten cover boards according to requirements in FM Approvals' "RoofNav" for specified Windstorm Resistance Classification.
2. Fasten cover boards to resist uplift pressure at corners, perimeter, and field of roof.
3.5 ADHERED MEMBRANE ROOFING INSTALLATION
A. Adhere membrane roofing over area to receive roofing and install according to membrane roofing system manufacturer's written instructions.
B. Start installation of membrane roofing in presence of membrane roofing system manufacturer's technical personnel.
C. Accurately align membrane roofing and maintain uniform side and end laps of minimum dimensions required by manufacturer. Stagger end laps.
D. Bonding Adhesive: Apply to substrate and underside of membrane roofing at rate required by manufacturer and allow to partially dry before installing membrane roofing. Do not apply to splice area of membrane roofing.
E. In addition to adhering, mechanically fasten membrane roofing securely at terminations, penetrations, and perimeter of roofing.
F. Apply membrane roofing with side laps shingled with slope of roof deck where possible.
G. Seams: Clean seam areas, overlap membrane roofing, and hot-air weld side and end laps of membrane roofing and sheet flashings according to manufacturer's written instructions to ensure a watertight seam installation.
1. Test lap edges with probe to verify seam weld continuity. Apply lap sealant to seal cut edges of sheet membrane.
2. Verify field strength of seams a minimum of twice daily and repair seam sample areas.
3. Repair tears, voids, and lapped seams in roofing that does not comply with requirements.
H. Spread sealant bed over deck drain flange at roof drains and securely Seal membrane roofing in place with clamping ring.
I. Install membrane roofing and auxiliary materials to tie in to existing Construction to maintain weathertightness of transition.
J. Replace existing roof drain domes and locking rings.
K. Install pipe supports in accordance with manufacturer’s recommendations. Space supports along pipe/conduit runs at maximum 10 feet on center and at each elbow, unless otherwise indicated.
3.6 BASE FLASHING INSTALLATION
A. Install sheet flashings and preformed flashing accessories and adhere to substrates according to membrane roofing system manufacturer's written instructions.
B. Apply bonding adhesive to substrate and underside of sheet flashing at required rate and allow to partially dry. Do not apply to seam area of flashing.
C. Flash penetrations and field-formed inside and outside corners with cured or uncured sheet flashing.
D. Clean seam areas, overlap, and firmly roll sheet flashings into the adhesive. Hotair weld side and end laps to ensure a watertight seam installation.
E. Terminate and seal top of sheet flashings and mechanically anchor to substrate as indicated on Drawings, if not indicated, as directed by roofing manufacturer.
3.7 WALKWAY INSTALLATION
A. Flexible Walkways: Install walkway products in locations indicated.
Heat weld to substrate or adhere walkway products to substrate with compatible adhesive according to roofing system manufacturer's written instructions.
B. Install in approximate location indicated on Drawings. Coordinate exact location with equipment installed on roof.
3.8 FIELD QUALITY CONTROL
A. Testing Agency: Engage a qualified testing agency to perform tests and inspections.
B. Final Roof Inspection: Arrange for roofing system manufacturer's Technical personnel to inspect roofing installation on completion.
C. Repair or remove and replace components of membrane roofing system where inspections indicate that they do not comply with specified requirements.
D. Additional inspections, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.
3.9 PROTECTING AND CLEANING
A. Protect membrane roofing system from damage and wear during remainder of construction period. When remaining construction will not affect or endanger roofing, inspect roofing for deterioration and damage, describing its nature and extent in a written report, with copies to Professional and Owner.
B. Correct deficiencies in or remove membrane roofing system that does not comply with requirements; repair substrates; and repair or reinstall membrane roofing system to a condition free of damage and deterioration at time of Substantial Completion and according to warranty requirements.
C. Clean overspray and spillage from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction.
3.10 ROOFING INSTALLER'S WARRANTY
A. WHEREAS <Insert name> of <Insert address>, herein called the "Roofing Installer," has performed roofing and associated work ("work") on the following project:
1. Owner: <Insert name of Owner>.
2. Address: <Insert address>.
3. Building Name/Type: <Insert information>.
4. Address: <Insert address>.
5. Area of Work: <Insert information>.
6. Acceptance Date: <Insert date>.
7. Warranty Period: <Insert time>.
8. Expiration Date: <Insert date>.
B. AND WHEREAS Roofing Installer has contracted (either directly with owner or indirectly as a subcontractor) to warrant said work against leaks and faulty or defective materials and workmanship for designated Warranty Period, C. NOW THEREFORE Roofing Installer hereby warrants, subject to terms and conditions herein set forth, that during Warranty Period he will, at his own cost and expense, make or cause to be made such repairs to or replacements of said work as are necessary to correct faulty and defective work and as are necessary to maintain said work in a watertight condition.
D. This Warranty is made subject to the following terms and conditions:
1. Specifically excluded from this Warranty are damages to work and other parts of the building, and to building contents, caused by:
a. Lightning;
b. Peak gust wind speed exceeding <Insert wind speed> mph;
c. Fire;
d. Failure of roofing system substrate, including cracking, settlement, excessive deflection, deterioration, and decomposition;
e. Faulty construction of parapet walls, copings, chimneys, skylights, vents, equipment supports, and other edge conditions and penetrations of the work;
f. Vapor condensation on bottom of roofing; and
g. Activity on roofing by others, including construction contractors, maintenance personnel, other persons, and animals, whether authorized or unauthorized by Owner.
2. When work has been damaged by any of foregoing causes, Warranty shall be null and void until such damage has been repaired by Roofing Installer and until cost and expense thereof have been paid by Owner or by another responsible party so designated.
3. Roofing Installer is responsible for damage to work covered by this Warranty but is not liable for consequential damages to building or building contents resulting from leaks or faults or defects of work.
4. During Warranty Period, if Owner allows alteration of work by anyone other than Roofing Installer, including cutting, patching, and maintenance in connection with penetrations, attachment of other work, and positioning of anything on roof, this Warranty shall become null and void on date of said alterations, but only to the extent said alterations affect work covered by this Warranty. If Owner engages Roofing Installer to perform said alterations, Warranty shall not become null and void unless Roofing Installer, before starting said work, shall have notified Owner in writing, showing reasonable cause for claim, that said alterations would likely damage or deteriorate work, thereby reasonably justifying a limitation or termination of this Warranty.
5. During Warranty Period, if original use of roof is changed and it becomes used for, but was not originally specified for, a promenade, work deck, spray-cooled surface, flooded basin, or other use or service more severe than originally specified, this Warranty shall become null and void on date of said change, but only to the extent said change affects work covered by this Warranty.
6. Owner shall promptly notify Roofing Installer of observed, known, or suspected leaks, defects, or deterioration and shall afford reasonable opportunity for Roofing Installer to inspect work and to examine evidence of such leaks, defects, or deterioration.
7. This Warranty is recognized to be the only warranty of Roofing Installer on said work and shall not operate to restrict or cut off Owner from other remedies and resources lawfully available to Owner in cases of roofing failure. Specifically, this Warranty shall not operate to relieve Roofing Installer of responsibility for performance of original work according to requirements of the Contract Documents, regardless of whether Contract was a contract directly with Owner or a subcontract with Owner's General Contractor.
Items in this SOW that are unclear shall be brought to the attention of the PPM, EPM and CO for clarification.
4.0 PROJECT REQUIREMENTS
4.1 Pre-Proposal Meeting: Upon issuance of the notice to proceed, the Contractor shall conduct a pre-proposal meeting at the job site to gather information needed to submit a design-build proposal to the Contracting Officer. Contractor shall take minutes of the meeting which will supplement this statement of work. The proposal shall include a project schedule.
4.2 Fee Proposal and Schedule: Based upon this SOW, the Contractor shall prepare an itemized fee proposal and schedule for services required to complete the project. Fee proposal shall show tasks, the disciplines required, number of hours for each discipline, labor costs for each discipline/trade, material costs, travel costs, etc. A cover letter shall set forth all assumptions made in developing the fee proposal and indicate the costs for each task.
4.3 Field Investigation and Site Survey: The Contractor shall coordinate, schedule, conduct site investigations and project meetings at the project location with PPM and EPM.
4.4 Compliance with Building Codes: In accordance with Public Law 100-678, federal agencies must comply with national building codes, local building codes, and zoning ordinances. The Contractor shall comply with the appropriate statutes governing the signing and sealing of engineering reports and drawings. Accordingly, final construction drawings and specifications and/or document submittals shall be signed and sealed by Professional Architects and Engineers registered to practice in the state were the project is located. Project design shall comply with “USDA Facilities Design Standards” provided in section 1.5 “Project Data.”
4.5 Code Analysis: The Contractor shall submit a code analysis for the building indicating compliance with applicable codes, type of construction, and environmental permitting for the subject project.
4.6 Tracking of Green Products: The Contractor shall incorporate into the project design appropriate green products. Contractor shall track and report on green products specified with each submittal.
At a minimum, the Contractor shall prepare a table that lists green products incorporated into the project, product category, green category (such as biobased, recycled-content, energy saving, water saving) along with estimated quantity and value of the green product.
4.7 Specifications to include Preferred Biobased Products: Construction specifications shall include the use of appropriate Preferred Biobased Products. A list of Preferred Biobased Products can be found at http://www.biopreferred.gov/BioPreferred/faces/catalog/Catalog.xhtml#
4.8 Specifications shall include Recycled-Content Construction Material:
Construction specifications shall include the use of Recycled-Content construction material. A list of recycled-content construction material can be found at https://www.epa.gov/smm/sustainable-management-construction-and-demolition-materials
4.9 Construction Submittals: The Contractor will provide an electronic copy to the Government of all submittals required, including product data, samples, certificates, maintenance manuals, warranties, start of warranties, and length of warranties. All green products specified shall be included in the submittal register for tracking and verification that specified green products are used during construction.
4.10 Meeting Minutes: The Contractor shall document and distribute all project meeting minutes. The meeting minutes need only record the date, time, location, attendees, major issues discussed, and conclusions reached. Contractor shall prepare to facilitate weekly or bi-weekly construction progress meetings as deemed appropriate by the PPM/COR.
5.0 PROJECT SCHEDULE:
5.1 The project schedule: The Contractor shall provide the Contracting Officer with a proposed schedule for design and construction. A suggested schedule format that is partially completed is provided below. The number of days indicates the time duration to complete that task upon completion of the preceding task.
Proposed Schedule for Design/Build Services
TASKS DURATION (working) Field Investigations and Meeting Within 7 days Proposal and Schedule Within 14 days Notice to Proceed for Design/Options Within 14 days Shop Drawing Submittal TBD Government Review 14 days Product Data Submittals 30 days NTP for Construction Services Within 5 days http://www.biopreferred.gov/BioPreferred/faces/catalog/Catalog.xhtml https://www.epa.gov/smm/sustainable-management-construction-and-demolition-materials
Construction Services TBD Close-out & Warranty 30 days
5.2 Submittal Distribution: The Contractor shall send electronic copies of submittals directly to the following individuals. A copy of the transmittal letter shall be provided to the Contracting Officer and Engineering Project Manager.
Proposal and Schedule Contracting Officer Electronic copy
Design Options & Shop Drawings Submittal Program Project Manager 1 copy Contracting Officer Representative 1 copy Engineering Project Manager 4 copies
Final Documents Program Project Manager 1 copy Contracting Officer Representative 1 copy Engineering Project Manager 1 copy
C.2 452.211-72 Statement of Work/Specifications (Feb 1988)
The contractor shall furnish the necessary personnel, material, equipment, services, and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced here in Section C.
(End of Clause)
Section D - Packaging and Marking
No Clauses Are Included in This Section
Section E - Inspection and Acceptance
I. FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
NUMBER TITLE DATE
52.252-2 Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: http://farsite.hill.af.mil/farsite_alt.html
(End of clause)
52.246-12 Inspection of Construction (APR 1996) http://farsite.hill.af.mil/farsite_alt.html
E.1 452.246-70 Inspection and Acceptance (FEB 1988)
(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.
(b) Inspection and acceptance will be performed at:
USDA, APHIS, PPQ
National Plant Germplasm Quarantine Center BARC-East, Building 580 Beltsville, MD 20705
Section F - Deliveries or Performance
52.242-14 Suspension of Work (APR 1984)
F.1 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within five calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 days after notice to proceed. The time stated for completion shall include final cleanup of the premises.
Section G - Contract Administration Data
G.1 Contracting Officer’s Representative
The COR for this project is Chester Carroll. He can be contacted at 301-313-9251.
G.2 Beneficial Occupancy/Substantial Completion and Acceptance
Specific forms will be used to request and then document substantial completion and acceptance when all contract requirements are complete. The Government may execute substantial completion of the project incrementally for discrete/severable portions of the project.
Substantial Completion is defined as the stage in construction when a project or designated portion thereof, has reached a state of completion which would permit the occupancy and/or use of the facility by the Department of Agriculture for its intended function. Unless otherwise indicated, the date of Substantial
Completion, as acknowledged by the Government, is also the date of commencement of all warranties and guarantees required by the contract documents.
G.3 Invoice Preparation and Submission
Prior to original invoices being submitted into IPP, the contractor shall submit draft or informational copies to the Contracting Officer and COR for review and approval. Based upon acceptance of required contract deliverables, review and approval, the contractor will be notified to submit the original invoice to the Invoice Processing Platform (IPP) at www.ipp.gov.
All contractors must register with, and submit all invoices, through IPP in accordance with agency policy and also to ensure prompt payment of all invoices.
The contractor shall include the following information on each invoice in order to be considered a proper invoice:
1. Name and address of contractor.
2. Invoice number and invoice date.
3. Contract number.
4. Description of work and period of performance.
5. Name, title, phone number, and complete mailing address of official to whom payment is to be sent.
6. Name, title, phone number, and complete mailing address of person to notify in the event of a defective invoice.
7. Taxpayer Identification Number and DUNS Number.
8. Invoices must be submitted with APHIS Form 39-R, along with certified payroll records;
contractor’s certification (pursuant to FAR 52.232-5).
Payments will be made on a monthly basis in accordance with the contractor’s approved Construction Progress and Payment Schedule (or other approved form), that must accompany…