statement of work crawfish_dodge.rtf
RTF text file 70 KB Posted
- Attached to
- Tree/Shrub Planting & Native Seeding - Dodge County, WI Federal contract opportunity
- Solicitation number
- AG-5F48-S-10-0003
About this file
Attachment 1 Statement of Work for Dodge County Tree/Shrub Planting Native Seeding
Text of this file
USDA-NRCS Crawfish North (Dodge Co, Wisconsin) Tree Planting & Native Seeding
EWPP-FPE #755F480900NYB
STATEMENT OF WORK
1.1 PROJECT BACKGROUND
The USDA-NRCS is conducting floodplain forest and native grassland revegetation actions in Portland Township in Dodge County, along the Crawfish River.
The reforestation and native grassland design for this area site will include pre-planting site preparation, planting new vegetation in specified areas, installing tree mats and tree tubes, and providing post-planting maintenance.
1.2 PROJECT LOCATION
The Crawfish North floodplain forest and grassland re-establishment area is located in sections 10, 11, 15 and 22 of Portland Township (T9N R13E). The site is approximately 5 miles northeast of Waterloo, Wisconsin, approximately 7 miles southeast of Columbus, Wisconsin and approximately 11 miles northwest of Watertown, Wisconsin.
1.3 MATERIALS
Site preparation and maintenance equipment and materials (herbicide & necessary application equipment and machinery for disking), native seed and nursery tree stock shall be supplied as indicated in plans and specifications Certification of materials by NRCS is required before installation
1.4 EXECUTION
A. Documentation of pre-planting conference and pre-planting inspection with NRCS
B. Obtain diggers hotline ticket number
C. Certification of materials
| 1. Native seed source, PLS |
| 2. Tree stock source, certification of age, condition |
D. Staking and Layout:
1. Staking and layout refers to locating and verifying all planting locations as shown on the plans and specifications.
E. Installation of materials
| 1. In May 2010, perform site preparation and planting | |
| 2. In October 2010, perform inspection on tree mortality as indicated in plans and | specifications |
F. Maintenance
| 1. Throughout June, July and August 2010 perform maintenance (strip and field mowing) | activities as indicated in plans and specifications.. | |
| 2. In 2011, perform maintenance (strip and field mowing) as indicated in plans and | specifications. |
1.5 PROTECTION
All planting materials shall be properly protected against harm from normal weather conditions and the public.
1.8 CLEANUP
Work areas are to be kept clean during progress of work and until completion. Remove surplus materials and rubbish from planting areas. Reclaim access roads and staging areas to pre-planting conditions after plant material installation.
END OF STATEMENT OF WORK
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Showing Notes 3-23-10.pdf | ||
| sf1449.pdf | ||
| contract clauses.docx | DOCX document | |
| 81-1253_sca.htm | HTM file | |
| crawfish_north_plan_spec.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .