Att_1_Specs.doc

DOC document 2 MB Posted

Attached to
Road Reconstruction Project Federal contract opportunity
Solicitation number
AG-56A1-S-16-0009
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

Attachment 1 Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Road Reconstruction Project, newest first.
File Type Posted
Abstract.pdf PDF
Pre-bid_notes.doc DOC document
AG56A1S160009_IFB.pdf PDF
Att_2_WageDet.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION 9

ALLEGHENY NATIONAL FOREST

Forest Road 156 Maintenance Bradford Ranger District

Warren County

Pennsylvania

Summary of Work

2-4 Work Description

5-9

Project Maps

10-11

Schedule of Items

Typical Drawings

13-17 Specifications

18-32

Plans are to be used with "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects” FP-03 incorporated by reference and with Site Specific Supplemental Specifications incorporated below.

Summary of Work

PART 1 - GENERAL

1.1 - Location Forest Road 156 is located in Warren, PA approximately 2,000 ft. southeast of route 59 and 6 intersection. See map on page 10.

1.2 - Site Work and Utilities General All work will be completed in accordance with Project Specifications and Drawings. The work includes: all labor, material, and equipment necessary to perform all the operations for the work specified in the Project Specifications and/or as Shown on the Drawings and any other miscellaneous items identified. Unless otherwise stated in specific project specifications all work will be completed using Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03 Scope of work The project consists of the completing road maintenance Items Major Work includes:

1. Removal and installation of drainage culverts. Reconstructing headwalls, rebuilding stone culvert, installing sediment traps, rock filters and stone lined broad based dips

2. Reconditioning the road template.

3. Apply aggregate base course and limestone surfacing.

4. Cleaning and reconstruction drainage ditches, hauling of all spoil to specified location shown on map. (See page 11) Spreading and seeding spoil.

5. Daylighting roadway by pruning specified trees, cutting and removal of marked trees from the project area, flush cutting tree stumps, chipping brush from pruning and tree removal.

6. Placing large native stones (approximately 10) from within project boundaries blocking access to stream.

7. Seeding and mulching all disturbed areas.

1.3 - Timing of Work The Forest Road will be closed to the public during construction. The Contractor will take all possible precautions to protect Government, public and private property during construction.

1.4 - Government-Furnished Facilities

1. All temporary service use areas, and storage areas will be completely removed and the areas restored to pre-construction conditions upon completion of use.

2. Water for construction purposes is not available at the project site.

3. Transportation to and from the work site for the Contractor's personnel and materials will be provided at the Contractor's expense.

1.5 - Material Sources All materials will be obtained from a commercial source.

1.6 - Storage Areas

Materials and equipment storage area will be confined to the areas identified by the Contracting Officer.

1.7 - Clean up and Disposal Disposal of waste material will be off National Forest Land and in compliance with local laws regarding disposal of construction waste.

1.8 – Traffic

1. Warning devices and barricades will be maintained in the construction area at all times, and will be in conformance with the Manual on Uniform Traffic Control Devices.

2. Traffic safety: Safety precautions will be in accordance with the latest edition of the State of Pennsylvania Construction Safety orders.

3. The Contractor will keep the project area open for administrative and emergency traffic at all times.

1.9 - Precautionary Measures Protection of Work:

The Contractor will take precautions to protect all work during the construction period and will provide and maintain adequate protection during severe weather conditions to prevent damage to work, worksite, equipment and materials.

Safety:

The Contractor is responsible for safeguarding employees, public, forest service employees, existing facilities, and forest resources from these operations. The Contractor will erect signs and chain-link fencing barricades as necessary to make unguarded operations safe. Signs and barricades will be maintained at night and on weekends. Precautions such as lowering tractor blades and safely storing materials will be practiced to prevent injury to others in the area.

Security:

No security will be provided by the Government. The Contractor will take all precautions deemed necessary to secure the worksite, work, equipment, and materials. This may include security fencing.

1.10 - Measurement and Payment

No separate measurement and payment will be made for work specifies in this section.

Road Maintenance

FR 156

There are known utility pipelines along both sides of the roadway. There are scattered markers for buried utilities. Modifications to this plan may be necessary when the buried utilities are located.

Must Contact PA One Call Prior to any constructions activity, and Contact Oil and Gas Operator to coordinate activities Mark Cataldo Cell 814-706-9295, work 814-726-3072

*WORK ITEMS SHOWN IN BOLD*

Location of Start of work on FR156:

Coordinates: Latitude 41°49'12.2000"

Longitude -079°06'34.9900"

Station
to
Station
Item/Work description

0+00

2+75
Place 4" DSA limestone (approximately 92 tons) as road surfacing from start of pavement on route 6 to edge of underpass concrete. Do not disturb Paved Parking area for Dollar General.

2+75

4+18
Paved area in underpass

4+20

20" x 26' casing

4+20

72+00
Dozer reconditioning roadbed to typical 14' finished road surface width, and approximate 16’ subgrade see TYPICAL RECONDITION SECTION. Reconditioning includes but is not limited to: scarifying of existing roadway, Ditch cleaning; Removal of berms from road edges; clearing of culvert and casings inlet and outlets; placement of any additional material and the compaction of surfacing material. All unused soil spoil will be removed to a site designated by CO and will be seeded and mulched as per specifications. Light brushing both sides of roadway (see Typical) Removal of Marked trees.

4+20

20+50
Place 6” of #3 Stone as road base (approximately 736 tons); 4” of PA-2A (approximately 483 tons); and 4” of DSA Limestone (approximately 506 tons) as surfacing.

6+25

OGM road right; Tank battery right; Large parking area right

7+85

7+95
Install new 16" x 24' casing and backfill with PA-2A . (Approximately 23 tons of PA-2A)

8+20

FR156 road sign right

10+00

Construct stone lined broad base dip (see Typical)

Station
to
Station
Item/Work description

10+00

11+50
Turnout left for campsite parking, Reconstruct Turnout place 6" of #3 stone as road sub-base (approximately 69 tons); 4" of PA-2A as base (approximately 33 tons) , and 4" of DSA Limestone as surfacing (approximately 35 tons)

12+00

Construct stone lined broad base dip (see Typical)

12+75

Remove dead tree at edge of roadway left

13+95

Remove existing section of CMP at inlet by excavating down to the original base of the stone culvert. Construct section of stone culvert to add on to existing section. If no stone base exists a concrete footer and base will be constructed in order to maintain the integrity of the existing stone culvert.

14+00

15+00
Reconstruct Turnout place 6" of #3 stone as road sub-base (approximately 33 tons); 4" of PA-2A as base (approximately 23 tons) , and 4" of DSA Limestone as surfacing (approximately 23 tons) Placement of large native boulders from project area to block access to stream.

14+70

Old collapsed stone culvert, compact spoil and block.

14+70

16+10
Reconstruct ditchline with 23 tons of DSA limestone.

16+10

Install new 16" x26' casing to drain left and right. Backfill with PA-2A (approximately 23 tons)

16+60

Start of Gas line Right-Of-Way

18+75

End of Gas line Right-Of-Way

19+10

Remove existing culvert; Install with 16" x 26' casing; Back fill using PA-2A (approximately 23 tons), construct ditch block

20+50

72+00
Place of 4" of PA-2A road base (approximately 1518 tons; Place 4" DSA limestone as surfacing (approximately 1610 tons).

20+65

Remove existing 18" x 24 CMP; Install new 16"x 26' casing; backfill using PA-2A (approximately 23 tons); Install sediment trap and rock filter (see Typical), *NOTE: 2 PIPELINES RUNNING ABOVE OUTLET.*

21+65

Remove existing 18" x 24' CMP; Install new 16"x 24' casing; Backfill using PA-2A (approximately 23 tons); install sediment trap and 1 rock filter (see Typical)

23+50

OGM Road Right

23+70

Remove existing 15" x 28' cement culvert; Install new 18" x 28' CMP; Backfill with PA-2A (approximately 23 tons) Save concrete sections for use elsewhere on project.

25+55

Remove existing 18" x 30' CMP; Install new 18" x 30' CMP; Backfill using PA-2A (approximately 23 tons)

Station
to
Station
Item/Work description

25+90

26+70
Prune Hemlock trees left (see typical for pruning to daylight road template)

27+70

Remove existing 18" x 20' CMP; Install new 18"x 22 CMP; Backfill using PA-2A (approximately 23 tons); Install sediment trap and rock filter (see Typical)

27+85

28+80
Prune Hemlock trees left (see typical for pruning to daylight road template)

28+85

OGM road right

29+15

Remove existing 18" x 22' CMP; Install new 18"x 24 CMP; Backfill using PA-2A (approximately 23 tons); Install sediment trap and rock filter (see Typical)

30+20

Remove existing 18" x 22' CMP; Install new 18"x 24 CMP; Backfill using PA-2A (approximately 23 tons); Construct ditch block

30+50

31+70
Tank battery left; Reconstruct Turnout place 4" of PA-2A as base (approximately 23 tons) , and 4" of DSA Limestone as surfacing (approximately 23 tons)

32+50

Remove existing 18" x24' CMP; Install new 18" x 24' casing; Backfill using PA-2A (approximately 23 tons)

32+95

33+90
Prune Hemlock trees left (see typical for pruning to daylight road template)

33+35

Remove existing 18" x 26' CMP; Install new 18" x 26' CMP; Backfill with PA-2A (approximately 23 tons); Install sediment trap and rock filter (see Typical); Clean ditch line 150' to culvert inlet.

35+05

Remove existing 18" x 24' CMP; Install new 18" x 26' CMP; Backfill with PA-2A (approximately 23 tons); clean ditch line 100' to culvert inlet.

36+65

38+10
Reconstruct Turnout Left place 4" of PA-2A as base (approximately 23 tons) , and 4" of DSA Limestone as surfacing (approximately 23 tons)

37+40

Remove existing 18" x 28' CMP; Install new 18" x 30' CMP; Backfill using PA-2A (approximately 23 tons) (Spring)

40+35

Clean inlet and outlet of 15" x 26' concrete culvert; Add section of concrete pipe saved from 23+70 removal to outlet; Install sediment trap (see typical)

41+75

16x 26 CMP; Clean ditch line 100 linear feet to culvert inlet

43+30

Remove 15" x 26' concrete culvert; Install new 24" x26' casing; Backfill using PA-2A (approximately 23 tons)

44+90

Remove 15" x 28' concrete culvert; Install new 24" x 28' casing; Backfill using PA-2A (approximately 23 tons)

Station
to
Station
Item/Work description

46+40

Remove 15" x 26' concrete culvert; Install new 28"x 20'x 28' CMP; Backfill using PA-2A (approximately 23 tons) (Spring); Build up outlet road slumping.(Approximately 12 tons clean approved fill needed)

48+80

Remove existing 18" x 26' CMP; Install new 18" x 26' CMP; Backfill with PA-2A (approximately 23 tons)

48+95

Prune Hemlock trees left (see typical for pruning to daylight road template)

49+30

Prune Oak tree left (see typical for pruning to daylight road template)

50+05

Remove 15" x 26' concrete culvert; Install new 18" x 28' CMP; Backfill with PA-2A (approximately 23 tons); Pipeline runs across roadway with culvert

50+40

Gate right

50+80

Snowmobile trail left

51+35

52+50
Reconstruct Turnout left place 4" of PA-2A as base (approximately 23 tons) , and 4" of DSA Limestone as surfacing (approximately 23 tons)

52+45

Tank left

52+95

Remove existing old stone culvert; Install new 16" x 24' casing; Backfill with PA-2A (approximatly 23 tons); Install ditch block right.

54+00

56+00
Place 6" #3 stone as road base (approximately 69 tons)

55+80

Remove 15" x 26' concrete culvert; Install new 18" x 28' CMP; Backfill with PA-2A (approximately 23 tons); Reconstruct stone headwall

58+15

Remove 15" x 26' concrete culvert; Install new 18" x 28' CMP; Backfill with PA-2A (approximately 23 tons)

59+50

61+50
Install 6" #3 stone as road base (approximately 69 tons)

60+00

Reset existing 15" x 28' concrete culvert inlet and outlet sections; Backfill using PA-2A (approximately 23 tons); Reestablish ditch line 200'; Reconstruct stone headwall at outlet.

63+05

Remove 18" x 28' concrete culvert; Install new 28"x20"x30' CMP; Backfill using PA-2A (approximately 23 tons)

65+05

Existing 16" x 28' casing; Clean inlet; Clean ditch line for 100 linear feet

65+30

Prune Hemlock trees left (see typical for pruning to daylight road template)

66+00

Remove existing 18" x30' casing; Install new 18" x 30' CMP; Backfill with PA-2A (approximately 23 tons)

67+40

Remove existing 12" x 28' CMP; Install new 18" x 28' CMP; Backfill with PA-2A (approximately 23 tons); Clean ditch line 150' to inlet

Station
to
Station
Item/Work description

68+35

Prune Hemlock trees left (see typical for pruning to daylight road template)

68+85

OGM road Right

69+60

Start of Electric powerline Right-Of-Way; Remove existing culvert; Install new 16" x 26' casing; Backfill with PA-2A (approximately 23 tons)

71+50

Remove existing culvert; Install new 16"x 30' casing; Backfill with PA-2A (approximately 23 tons)

71+90

Reconstruct existing Turn Around using 4" PA-2A base(approximately 46 tons); 4" DSA Limestone (approximately 46 tons) road surfacing

72+00

End of Road reconditioning FR156 continues.

SCHEDULE OF ITEMS

Pay Item
Item Description
Est. Quantity
Method of Meas.
Pay Unit
Unit Price
Amount
151
Mobilization (including bonding cost)
1
LS
LSQ
157
Soil Erosion Control
1
LS
LSQ
201
Clearing and Grubbing(Tree Pruning, chipping, removal of logs and pulpwood, flush cutting stumps)
1
LS
LSQ
201-1
Light Brushing
1.3
Miles
AQ
201-2
Tree Removal
1
LS
LSQ
203
Removal of Existing Culverts
25
Each
EA
204
Drainage Excavation(Reconstruction of Ditch lines)
1
LS
LSQ
204-1
Removal of Waste from Ditch line cleaning, and Road Grading
1
LS
LSQ
251
Placement of approximately 10 Native Boulders from work site 24”-36”.
1
LS
LSQ
252
Special Rock Embankment and Rock Buttress(Headwalls)
2
Each
EA
301
Aggregate Base course #3
920
Tons
AQ
301-1
Aggregate sub surface course, Pa2A
2,231
Tons
AQ
301-2
Aggregate (culvert backfill), Pa2A
690
Tons
AQ
301-3
Aggregate surface course, DSA Limestone
2,392
Tons
AQ
301-4
Rip-Rap R-3 (rock filters, broad based dips)
10.5
Tons
AQ
303
Road Reconditioning, Dozer
1.3
Mile
AQ
602
18” Aluminized steel, corrugated drainage culvert
354
LF
EA
602-1
16” steel casing drainage culvert
260
LF
EA
602-2
24” steel casing drainage culvert
54
LF
EA
602-3
20” x 28” Aluminized steel, corrugated drainage culvert
58
LF
EA
602-4
Stone lined Broad Based Dips
2
Each
EA
602-5
Stone Culvert Reconstruction
1
Each
EA
625
Seeding;
1
Each
LS
Work includes all necessary materials and labor to complete the project according to specifications.
Total Bid
--------
----
-----------
$

Center of Dip will be lined with a minimum of 6” of #3 Rip Rap

Forest Road 156 Road Maintenance List of Highlighted Specification

DIVISION 100 - GENERAL REQUIRMENTS

100 - TERMS, FORMATE, AND DEFINITIONS

103 - SCOPE OF WORK

104 - CONTROL OF WORK

105 - CONTROL OF MATERIALS

106 - ACCEPTANCE OF WORK

107 - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

108 - PROSECUTION AND PROGRESS

109 - MEASURMENT AND PAYMENT

151 - MOBILIZATION

152 - CONSTRUCTION SURVEY AND STAKING

153 - CONTRACTOR QUALITY CONTROL

155 - SCHEDULES FOR CONTRUCTION CONTRACTS

156 - PUBLIC TRAFFIC

157 - SOIL EROSION CONTROL

DIVISION 200 - EARTHWORK

201 - CLEARING AND GRUBBING

203 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS

204 - EXCAVACTION AND EMBANKMENT

209 - STRUCTURAL EXCAVATION AND BACKFILL

212 - LINEAR GRADING

230 - ROADSIDE BRUSHING

251 - RIPRAP

253 - GABIONS AND REVET MATTRESSES

252 - SPECIAL ROCK EMBANKMENT AND BUTTRESS

DIVISION 300 – AGGREGATE COURSE

301 – UNTREATED AGGREGATE COURSE

303 – ROAD RECONDITIONING

DIVISION 600 - INCIDENTAL CONSTRUCTION

601 - MINOR CONCRETE STRUCTURES

602 - CULVERTS AND DRAINS

607 - CLEANING, RECONDITIONING, AND REPAIRING EXISTING DRAINAGE

622 - RENTAL EQUIPMENT

625 - TURF ESTABLISHMENT

633 - PERMANENT TRAFFIC CONTROL

DIVISION 700 – MATERIAL

703 - AGGREGATE

704 - SOIL

705 - ROCK

713 - ROADSIDE IMPROVEMENT MATERIAL

718 - TRAFFIC SIGNING AND MARKING MATERIAL

Site Specific Supplemental Specifications

DIVISION 1 – GENERAL

151 - Temporary Facilities and Utilities

PART 1 - GENERAL

1.1 - Scope

The work of this section includes providing all temporary facilities and controls needed for the project. The Contractor will furnish all equipment, labor, materials, and incidentals necessary to hook-up, install and maintain the facilities. Such facilities include but are not limited to:

1. Sanitary facilities

2. Water

3. Directional signs, safety signs, and barricades

4. Temporary utilities such as water

1.2 - Safety Assurance

OSHA Compliance: Comply with Occupational Health and Safety Requirements for Construction (29 CFR 1926).

Hazardous Materials Compliance: For hazardous materials regulated by OSHA see 29 CFR Part 1910, Subpart Z.

1.3 - Measurement and Payment

No separate measurement and payment will be made for work specifies in this section. Temporary Facilities and Utilities is considered incidental to other items of work shown in the Schedule of Items.

PART 2 - PRODUCTS

NONE

PART 3 - EXECUTION

3.1 - Sanitary Facilities

The Contractor will provide temporary sanitary facilities for all workers and maintain the facilities in a clean and sanitary state. Temporary sanitary facilities will be provided at a rate of one seat per ten (10) workers on site. Contractor furnished facilities will be available for Government personnel use.

3.2 - Water

The Contractor will provide temporary watering equipment. Watering equipment used for dust control and finishing operations of subgrade and surface will provide uniform and controlled application of water from the driver’s position at all times.

3.3 - Operations and Storage Areas

Operation and storage areas will be restricted to the project site, as directed by the Contracting Officer and show on the Drawings.

3.4 - Costs

All fees and costs for the hook-up, installation, use, maintenance and removal of temporary facilities and controls will be paid by the Contractor.

***END OF SPECIFICATION 151***

DIVISION 2 SITE WORK

201 – Clearing and Grubbing

PART I - GENERAL

1.1 - Scope

This work shall consist of clearing, grubbing, trimming, removing, and disposing of or treatment of timber, construction slash, and debris. This work shall also include preservation of vegetation and objects designated to remain from injury or defacement.

1.2 - Related Sections

Section 01701 “Contract Closeout and Cleanup”

1.3 - Definitions

Areas to be Cleared and Grubbed - The limits of clearing and grubbing will be established by this specification, or on contract Drawings. The clearing and grubbing limits will normally coincide with the designated working limits; however, the Contracting Officer may also designate individual trees and snags outside the clearing limits for selective removal and disposal, or he may designate areas within the working limits where clearing and grubbing is not required or allowed within the provisions of this specification.

1. Grading Limits – Area that is to be excavated or covered with additional materials during construction.

2. Working Limits - Area consisting of the grading limits plus room for equipment to maneuver to perform the necessary clearing and grubbing. These limits, to be held to a minimum, will be designated for each project.

3. Clearing Limits - Area consisting of the working limits plus any additional area to operate a boom or other above-ground clearance requirement.

1.4 - Measurement and Payment

No separate measurement and payment will be made for work specifies in this section. Clearing and Grubbing is considered incidental to other items of work shown in the Schedule of Items.

PART 2 - PRODUCTS

NONE

PART 3 - EXECUTION

3.1- Clearing and Grubbing A. All trees, brush, shrubs, stumps, roots, and other vegetative material and debris within the designated clearing limits, shall be cleared, grubbed, removed, and disposed of except the following condition:

1. Those items designated to remain by the Specifications, Drawings or Contracting Officer.

2. Undisturbed stumps outside the roadway, provided they do not extend more than twelve (12) inches above the original ground (measured from the uphill side) and are not closer than two (2) feet from the edge of road or parking area, are not in the cut or fill slopes, and they do not interfere with the placement or compaction of embankments.

B. All roots over three (3) inches in diameter within the roadbed area shall be grubbed to a minimum depth of six (6) inches below subgrade. Roots over three (3) inches in diameter protruding from the excavated slope shall be cut flush with the excavated slope surface.

C. Clearing slash shall be treated in accordance with Sub-Section 3.4 “Slash Treatment” below.

D. Trees shall be felled within the clearing limits, usually towards the center, so as to prevent damage to the trees that are to be left standing. In some cases, controlled felling, cutting of trees into sections from the top downward, or other means shall be used when required to prevent damage to property, structures, traffic, and trees/vegetation to remain. Trees marked for removal within the project area will have final stumps cut to ground level Only after Inspection of trees removed is completed by designated Forest Service Representative.

E. Fire-dangerous dead trees or unstable live trees, designated by the Contracting Officer within the project area shall be cut off not more than twelve (12) inches above the uphill ground line and utilized or removed.

G. Branches on remaining trees or shrubs shall be trimmed to give a clear height of fourteen (14) feet above the roadbed unless otherwise Shown on the Drawings. Tree limbs shall be trimmed in accordance with ANSI A300 Standards. Trees designated in plans for pruning shall be done in accordance with Section 5 of the standard, and eliminating section 5.4 wound treatment. No more than 1/3 of the tree shall be pruned in order to avoid tree health problems. Pruning or heading back of branches for daylighting roadway as shown in plans.

3.2 - Utilization of Timber A. Merchantable timber is timber that meets Utilization Standards. Utilization standards shall be as follows:

1. Fuel Wood - Trees between six (6) inches and eight (8) inches diameter measured six (6) measured at breast height, minimum sixteen (16) feet logs.

2. Saw Logs – Trees larger than twelve (12) inches diameter measured at breast height, minimal eight (8) feet logs.

3.3 - Pioneer Pioneering operations shall be done in a manner that prevents undercutting of final excavation slopes, maintains materials within the road, trail, or parking limits, and controls runoff.

3.4 – Slash Treatment A. Treatment of construction slash shall be accomplished by the following methods:

1. Roots, brush, and misc. clearing debris shall be hauled to the disposal area and disposed of in accordance with Section 01701 “Contract Closeout and Cleanup”.

2. Chipping: Construction slash up to at least three (3) inches in diameter and longer than three (3) feet shall be processed through a chipping machine. Chips shall be removed from site with spoil at the designated area or can be dispersed on site within the construction limits with no piles exceeding 6 inches in depth. Stockpiles shall be minimized and at locations approved by the Contracting Officer. Logs stacked shall be stable and free of brush and soil.

3. Stacking of Unmerchantable Material: Logs not meeting utilization standards and other material that exceeds six (6) inches in diameter shall be limbed, cut into sixteen (16) inch to thirty-six (36) inch lengths, and stacked in a location designated by the Contracting Officer. Log stacked shall be stable and free of brush and soil.

4. Trees having a diameter of less than six (6) inches, limbs, tops, and other slash greater than three (3) inches shall cut into sixteen (16) inch to thirty-six (36) inch lengths, and stacked in a location designated by the Contracting Officer.

B. No construction slash shall be deposited in lakes, meadows, streams, streambeds, or dry drainages. Construction slash that interferes with drainage structures shall be removed immediately.

3.5 - Clearing or Clearing and Grubbing Requirements For Various Items A. Roadways, Spurs and Parking Areas - On roadways, spurs and parking areas, the area to be grubbed shall be an area between the cut and/or fill stakes. The clearing area will be the area between the cut and/or fill stakes, and a minimum of four (4) feet from edge of subgrade, and shall extend to a height of fourteen (14) feet above the finished roadway surface.

B. Trenches for Water, Sewer, Electrical Lines, and other Underground Utilities - If no reference is made elsewhere, a clearing of five (5) feet maximum on each side of centerline will be allowed. Clearing width for waterlines may be extended to ten (10) feet maximum on each side of pipe centerline, but should be minimized whenever possible.

3.6 - Area Outside Grading Limits but Within Clearing Limits

On areas designated for clearing and grubbing outside of the grading limits, stumps may be cut within four (4) inches of the ground and left in lieu of being removed. All trees, shrubs, and other protruding or surface objects shall be cleared, except the vegetation and objects designated to remain.

3.7-Waste Disposal

Roots, refuse, and other debris generated shall be disposed of in accordance with Section 01701 “Contract Closeout and Cleanup”.

***END OF SPECIFICATION 201***

DIVISION 2 - SITE WORK

02910 - Weed and Disease Prevention

PART 1 - GENERAL

1.1 - Description A. This work consist of washing and treating construction equipment to remove dirt, mud, seeds, plants, and plant fragments from the equipment before the equipment is used on National Forest lands.

B. Notify the Contracting Officer in writing at least five (5) days before moving any construction equipment onto National Forest System lands. Construction equipment does not include cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas outside of National Forest lands.

1.2 - Measurement and Payment No separate payment will be made for work specified in this section. This work will be considered incidental to Sections 01601 - Mobilization.

PART 2 - PRODUCTS

2.1 - High Pressure Washing System

The Contractor will use a washing system that utilizes high-pressure water to dislodge dirt, debris, and seeds from the equipment.

PART 3 - EXECUTION

3.1 - Washing A. Washing will be performed outside of the National Forest at a location pre-approved by the Contracting Officer. Contractor will provide the Contracting Officer with a minimum of seventy two (72) hours advanced notice that they will be washing the equipment, and provide the opportunity to monitor the washing and inspection. If the Contracting Officer is not present at the time the equipment is being washing, the Contractor will submit written verification that the work was performed and inspected. Contracting Officer may choose to verify washing prior to equipment entering Forest Lands at their disscression.

B. Wash the sides, tops and undercarriages of all construction equipment. Remove all soil, mud, (wet or dried), seeds, plants, plant fragments, dirt and debris that could contain seeds from the construction equipment. Light dust that does not contain sees is not of concern.

C. Do not mix, soaps, detergents, or other chemicals, with the wash water.

3.2 - Inspection

Contractor will inspect the washed construction equipment, including the undercarriage, to ensure that the washing removed the dirt, debris and seeds from the construction equipment. Rewash the construction equipment as necessary or as directed by the Contracting Officer.

3.1 - Acceptance Acceptance is based on visual inspection of the work for compliance with the contract and prevailing industry standards.

***END OF SPECIFICATION 02910***

Seed mix to be used Purchaser shall drain, level, grade and water bar all disturbed areas as identified by theCO, and seed, lime, fertilize, and mulch at the following quantities and rates of application:

Seeding Requirements

Spring
Fall
Grass
*See mix below
*See mix below
Lime
Agricultural lime @ 2tons/acre or Pelletized lime @ 400 lbs/acre
Agricultural lime @ 2tons/acre or Pelletized lime @ 400 lbs/acre
Fertilizer
10-20-20 @ 450lbs/acre
10-20-20 @ 450lbs/acre
Mulch
Straw only @ 60 bales/acre
Straw only @ 60 bales/acre

Spring Oats or Winter Rye

1.5 bushels/acre

Annual Rye grass

5 lbs/acre

White Dutch Clover w/inoculant

5 lbs/acre

Indiangrass – PA Ecotype

3 lbs/acre

Switchgrass ‘Shelter’

3 lbs/acre SPS 703 – Aggregate

Add the following:

703.20 Driving Surface Aggregate. All Driving Surface Aggregate (DSA) is to be derived from natural limestone formations. Stone is defined as rock that has been crushed; rock is defined as consolidated mineral material. For use in this program, both are restricted to that which has been mined or quarried from existing bedrock formations.

All components of the aggregate mix are to be derived from crushed parent rock material that meets program specifications for abrasion resistance, pH and freedom from contaminants. Ninety-eight percent (98%) of the fines passing the #200 sieve must be parent rock material. No clay or silt soil may be added. The amount of particles passing the #200 sieve shall be determined using the washing procedures specified in PTM No. 100.

Size: The required amount and allowed ranges, determined by weight, for various size particles are:

PASSING SIEVE

LOWER%

HIGH%

1 ½ inch

100%

¾ inch

65%

90%

#4

30%

#16

15%

#200

10%

20%

LA Abrasion: The acceptable limit is measured by weight loss is “less than 40% loss”. Los Angeles Abrasion test, AASHTO T-96 (ASTM C 131) shall be used to determine this property. Existing tests made for and approved by PennDOT will be accepted.

Sulfate Test: Soundness or resistance to freeze/thaw (i.e. sulfate test) is not specified for this application because a gravel road driving surface aggregate is not bound within a concrete or asphalt mix.

pH: Aggregate must be within the range of pH 6 to pH 9 as measured by EPA 9045C.

Optimum Moisture: Material is to be delivered and placed at optimum moisture content as determined for the particular source. The optimum percentage moisture is to be identified by the supplier in the bid purchasing documents. Loads with excessive moisture shall be rejected. Water draining from the tailgate, excess material sticking to the roller drum or the inability to compact the material are field indicators of excess moisture. In addition, if a load is too dry or does not have enough fines it will be rejected. Visual inspection of the load and poorly consolidated material after compactive effort are field indicators of low moisture or poor product gradation.

Transport: Tarps are to be used to cover one hundred percent (100%) of the load’s exposed surface from the time of loading until immediately before dumping. This requirement includes standing time waiting to dump.

Aggregate producers are required by the program to certify that the aggregate they deliver conforms to the program specifications. To eliminate segregation of material, stockpiling of material at jobsite will not be permitted unless authorized by COR.

The following are “Local” sources for this material:

· Hawbaker – Turtlepoint, PA. 814-237-1444 or 814-642-2500

· New Enterprise Stone & Lime Co. – Tyrone, PA 814-695-4405

· Allegheny Mineral Corporation, Glacial Sand & Gravel Company – Kittanning, PA 814-548-8101 Road Preparation Specifications: The road surface to receive the aggregate should have template with crown of 2% or ¼ inch per foot. The receiving surface is to be scarified to permit knitting of the aggregate.

Driving Surface Aggregate Placement: Minimum compacted depth of four inches is to be established for driving surface. Driving Surface Aggregate is to be applied by tailgate spreading unless spreader box is specified. Material when placed shall be compacted as follows: Beginning on the lower or berm side of the crown, begin rolling and work your way to the top of the crown by overlapping the successive longitudinal passes. Do not run the roller lengthwise directly on the crown. Compaction with truck tires is not accepted. Steel wheel rollers other than vibratory shall be capable of exerting a force of not less than 250 pounds per inch of width of the compression roller or rollers. Rollers shall be self propelled with a minimum weight of 6 tons. Contractor must have certification in writing that material placed is Driving Surface Aggregate meeting this specification.

1” Minus Aggregate (DSA Gravel non limestone) Size: The required amount and allowed ranges, determined by weight, for various size particles are:

PASSING SIEVE

LOWER%

HIGH%

1 ½ inch

95%

LA Abrasion < 40%

Sulfate Test – Not Applicable

PH between 6 and 9

Material available at:

· Glenn O. Hawbacker – Pittsfield Pit 814-563-7911

· AI Construction Corporation – Gardland Plant 814-563-7680

Pennsylvania 2A Gradation:

The required amount and allowed ranges, determined by weight, for various size particles are:

PASSING SIEVE

LOWER%

HIGH%

2 inch

52%

24%

50%

LA Abrasion < 40%

Sulfate Test – Not Applicable

0%

PH between 6 and 9

AASHTO 57 Gradation:

The required amount and allowed ranges, determined by weight, for various size particles are:

PASSING SIEVE

LOWER%

HIGH%

1-1/2 inch

1 inch

95%

1/2 inch

25%

60%

#8

5% Forest Road 156

Road Maintenance June 2016