Attachment_A_-_Schedule_of_Items.pdf

PDF 88 KB Posted

Attached to
Black River Harbor (BRH) Dock Replacement Federal contract opportunity
Solicitation number
AG-569R-S-17-0043
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

Attachment A - Schedule of Items

View the file

Other files for this federal contract opportunity

Other files attached to Black River Harbor (BRH) Dock Replacement, newest first.
File Type Posted
Amendment_2_-_AG-569R-S-17-0043.pdf PDF
Amend_1_-_AG-569R-S-17-0043.pdf PDF
Attachment_D_-_MDEQ_Permit.pdf PDF
AG-569R-S-17-0043.docx DOCX document
Attachment_C_-_Drawings-Plans.pdf PDF
Attachment_E_-_Davis_Bacon_Wage_Determination.docx DOCX document
Attachment_B_-_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Black River Harbor Improvements Phase I

Schedule of Items

This Includes:

Construction of 170' of Bin Wall System, Floating Dock and Gangway, and Stream Improvements for Base Bid

UNIT PRICE WORK

Item No. Description Units Qty Unit Price Amount

General Work

015000-01 Staging and Site Control Lsum 1.00 $ $ 017300-01 Mobilization Lsum 1.00 $ $ 312000-01 Soil and Sedimentation Control Lsum 1.00 $ $

Wall Reconstruction

Subtotal: $

024119-01 Remove Existing Dock Wall and Stone Fill Lsum 1.00 $ $ 024119-02 Site Removals Lsum 1.00 $ $ 051200-01 Bin Wall Sft 2000.00 $ $ 033000-01 Concrete Retaining Walls Cyd 20 $ $ 033000-02 Concrete Headwall Cyd 4 $ $ 033000-03 Concrete Walking Surface Sft 400 $ $ 129300-01 Site Furnishings - Dock Cleats Each 15 $ $ 129300-02 Site Furnishings - Picnic Tables, Half Width Each 3 $ $ 129300-03 Site Furnishings - Wood Bumpers Sft 700 $ $ 129300-04 Site Furnishings - Ladders Each 2 $ $ 311000-01 Site Clearing Lsum 1 $ $ 312000-02 Excavation, Earth Cyd 150 $ $ 312000-03 Excavation, Rock Cyd 450 $ $ 312000-04 Engineered Fill Cyd 150 $ $ 312000-05 River Rock Riprap Ton 20 $ $ 321316-01 Decorative Concrete Walking Surface Sft 2040 $ $ 329200-01 Slope Restoration Syd 300 $ $

Subtotal: $ 3 Floating Dock and Gangway 355113-01 Floating Wood Dock Lsum 1 $ $ 355113-02 Gangway Lsum 1 $ $

Subtotal: $ 4 Drainage Course Improvements 024119-01 Site Removals Lsum 1.00 $ $ 033000-02 Concrete Headwall Cyd 6 $ $ 311000-01 Site Clearing Lsum 1 $ $ 312000-01 Excavation, Earth Cyd 100 $ $ 312000-02 Excavation, Rock Cyd 40 $ $ 312000-03 Engineered Fill Cyd 15 $ $ 312000-04 Boulders, 24" to 36" Ea 25 $ $ 312000-05 River Rock Riprap Ton 80 $ $ 329200-01 Slope Restoration Syd 650 $ $ 334100-01 Elliptical Concrete Pipe (24" x 38") Ft 140 $ $

Subtotal: $ 5 Electrical Improvements

Site Electrical Lsum 1.00 $ $

Base Total: $

Black River Harbor Improvements Phase I

Schedule of Items

This Includes:

Construction of 245' Bin Wall System for Additive Alternate

UNIT PRICE WORK

Item No. Description Units Qty Unit Price Amount

General Work

015000-01 Staging and Site Control Lsum 1.00 $ $ 017300-01 Mobilization Lsum 1.00 $ $ 312000-01 Soil and Sedimentation Control Lsum 1.00 $ $

Wall Reconstruction

024119-01 Remove Existing Dock Wall and Stone Fill Lsum 1.00 $ $ 024119-02 Site Removals Lsum 1.00 $ $ 051200-01 Bin Wall Sft 3150.00 $ $ 129300-01 Site Furnishings - Dock Cleats Each 15 $ $ 129300-02 Site Furnishings - Picnic Tables, Half Width Each 4 $ $ 129300-03 Site Furnishings - Wood Bumpers Sft 1020 $ $ 129300-04 Site Furnishings - Ladders Each 3 $ $ 311000-01 Site Clearing Lsum 1 $ $ 312000-02 Excavation, Earth Cyd 170 $ $ 312000-03 Excavation, Rock Cyd 600 $ $ 312000-04 Engineered Fill Cyd 170 $ $ 312000-05 River Rock Riprap Ton 5 $ $ 321316-01 Decorative Concrete Walking Surface Sft 3060 $ $ 329200-01 Slope Restoration Syd 500 $ $

Subtotal: $

3 Electrical Improvements Site Electrical Lsum 1.00 $ $

Add Alt Total:

Grand Total: