Attachment_A_-_Schedule_of_Items.pdf
PDF 88 KB Posted
- Attached to
- Black River Harbor (BRH) Dock Replacement Federal contract opportunity
- Solicitation number
- AG-569R-S-17-0043
About this file
Attachment A - Schedule of Items
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_2_-_AG-569R-S-17-0043.pdf | ||
| Amend_1_-_AG-569R-S-17-0043.pdf | ||
| Attachment_D_-_MDEQ_Permit.pdf | ||
| AG-569R-S-17-0043.docx | DOCX document | |
| Attachment_C_-_Drawings-Plans.pdf | ||
| Attachment_E_-_Davis_Bacon_Wage_Determination.docx | DOCX document | |
| Attachment_B_-_Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Black River Harbor Improvements Phase I
Schedule of Items
This Includes:
Construction of 170' of Bin Wall System, Floating Dock and Gangway, and Stream Improvements for Base Bid
UNIT PRICE WORK
Item No. Description Units Qty Unit Price Amount
General Work
015000-01 Staging and Site Control Lsum 1.00 $ $ 017300-01 Mobilization Lsum 1.00 $ $ 312000-01 Soil and Sedimentation Control Lsum 1.00 $ $
Wall Reconstruction
Subtotal: $
024119-01 Remove Existing Dock Wall and Stone Fill Lsum 1.00 $ $ 024119-02 Site Removals Lsum 1.00 $ $ 051200-01 Bin Wall Sft 2000.00 $ $ 033000-01 Concrete Retaining Walls Cyd 20 $ $ 033000-02 Concrete Headwall Cyd 4 $ $ 033000-03 Concrete Walking Surface Sft 400 $ $ 129300-01 Site Furnishings - Dock Cleats Each 15 $ $ 129300-02 Site Furnishings - Picnic Tables, Half Width Each 3 $ $ 129300-03 Site Furnishings - Wood Bumpers Sft 700 $ $ 129300-04 Site Furnishings - Ladders Each 2 $ $ 311000-01 Site Clearing Lsum 1 $ $ 312000-02 Excavation, Earth Cyd 150 $ $ 312000-03 Excavation, Rock Cyd 450 $ $ 312000-04 Engineered Fill Cyd 150 $ $ 312000-05 River Rock Riprap Ton 20 $ $ 321316-01 Decorative Concrete Walking Surface Sft 2040 $ $ 329200-01 Slope Restoration Syd 300 $ $
Subtotal: $ 3 Floating Dock and Gangway 355113-01 Floating Wood Dock Lsum 1 $ $ 355113-02 Gangway Lsum 1 $ $
Subtotal: $ 4 Drainage Course Improvements 024119-01 Site Removals Lsum 1.00 $ $ 033000-02 Concrete Headwall Cyd 6 $ $ 311000-01 Site Clearing Lsum 1 $ $ 312000-01 Excavation, Earth Cyd 100 $ $ 312000-02 Excavation, Rock Cyd 40 $ $ 312000-03 Engineered Fill Cyd 15 $ $ 312000-04 Boulders, 24" to 36" Ea 25 $ $ 312000-05 River Rock Riprap Ton 80 $ $ 329200-01 Slope Restoration Syd 650 $ $ 334100-01 Elliptical Concrete Pipe (24" x 38") Ft 140 $ $
Subtotal: $ 5 Electrical Improvements
Site Electrical Lsum 1.00 $ $
Base Total: $
Black River Harbor Improvements Phase I
Schedule of Items
This Includes:
Construction of 245' Bin Wall System for Additive Alternate
UNIT PRICE WORK
Item No. Description Units Qty Unit Price Amount
General Work
015000-01 Staging and Site Control Lsum 1.00 $ $ 017300-01 Mobilization Lsum 1.00 $ $ 312000-01 Soil and Sedimentation Control Lsum 1.00 $ $
Wall Reconstruction
024119-01 Remove Existing Dock Wall and Stone Fill Lsum 1.00 $ $ 024119-02 Site Removals Lsum 1.00 $ $ 051200-01 Bin Wall Sft 3150.00 $ $ 129300-01 Site Furnishings - Dock Cleats Each 15 $ $ 129300-02 Site Furnishings - Picnic Tables, Half Width Each 4 $ $ 129300-03 Site Furnishings - Wood Bumpers Sft 1020 $ $ 129300-04 Site Furnishings - Ladders Each 3 $ $ 311000-01 Site Clearing Lsum 1 $ $ 312000-02 Excavation, Earth Cyd 170 $ $ 312000-03 Excavation, Rock Cyd 600 $ $ 312000-04 Engineered Fill Cyd 170 $ $ 312000-05 River Rock Riprap Ton 5 $ $ 321316-01 Decorative Concrete Walking Surface Sft 3060 $ $ 329200-01 Slope Restoration Syd 500 $ $
Subtotal: $
3 Electrical Improvements Site Electrical Lsum 1.00 $ $
Add Alt Total:
Grand Total: