ORB7054_Trail Bridges Replacement_Wayne_specs_table of contents.pdf
PDF 56 KB Posted
- Attached to
- Trail Bridges Replacement Federal contract opportunity
- Solicitation number
- AG-52B1-S-10-0050
About this file
Specifications Table of Contents
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ORB7054_Trail Bridges Replacement_Wayne_proposal documents_amend 1.doc | DOC document | |
| ORB7054_Trail Bridges Replacement_Wayne_Solicitation_amend 1.pdf | ||
| SF30_ORB7054_Trail Bridges_amend 1.pdf | ||
| ORB7054_Trail Bridges Replacement_Wayne_spec_cover page.pdf | ||
| ORB7054_Trail Bridges Replacement_Wayne_proposal documents.pdf | ||
| ORB7054_Trail Bridges Replacement_Wayne_Solicitation.pdf | ||
| ORB7054_Trail Bridges Replacement_Wayne_specs.pdf | ||
| ORB7054_Trail Bridges Replacement_Wayne_drawings.pdf | ||
| ORB7054_Trail Bridges Replacement_Wayne_Davis Bacon Wage Rates.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA Forest Service HANGING ROCK TRAIL BRIDGES
Wayne National Forest May 28, 2010
TABLE OF CONTENTS
Division Section Title Page
SPECIFICATIONS GROUP
General Requirements Subgroup
DIVISION 01 - GENERAL REQUIREMENTS
011000 SUMMARY 1
011400 WORK RESTRICTIONS 3
012700 UNIT PRICES 4
012800 MOBILIZATION 5
013100 PROJECT MANAGEMENT AND COORDINATION 6
013300 SUBMITTAL PROCEDURES 9
014000 QUALITY CONTROL 12
014200 REFERENCES 14
015000 TEMPORARY FACILITIES AND CONTROLS 18
015639 TEMPORARY TREE AND PLANT PROTECTION 20
017300 EXECUTION REQUIREMENTS 25
017700
018800 019900
CLOSEOUT PROCEDURES
SUPPLEMENTAL INFORMATION FOR BIDDERS
SAFETY
DIVISION 02 – ITEM SPECIFICATIONS
ITEM 1
ITEM 2
ITEM 3
ITEM 4
ITEM 5
ITEM 6
ITEM 7
ITEM 8
ITEM 9
ITEM 10
ITEM 11
ITEM 12
ITEM 13
ITEM 14
ITEM 15
ITEM 16
ITEM 17
ITEM 18
ITEM 19
ITEM 20
ITEM 21
ITEM 22
ITEM 23
ITEM 24
ITEM 25
ITEM 26
ITEM 27
ITEM 28
ITEM 29
MOBILIZATION
STEEL BRIDGE SUPERSTRUCTURE FABRICATION (#1 THRU #4)
VERTICAL 2X4 TREAYED BRIDGE DECK MATERIALS (#1 THRU #4)
BRIDGE #1 ABUTMENTS
BRIDGE #2 ABUTMENTS
BRIDGE #3 ABUTMENTS
BRIDGE #4 ABUTMENTS
PLACEMENT OF PRE-FABRICATED STEEL BRIDGE SUPERSTRUCTURE FOR BRIDGE #1
PLACEMENT OF PRE-FABRICATED STEEL BRIDGE SUPERSTRUCTURE FOR BRIDGE #2
PLACEMENT OF PRE-FABRICATED STEEL BRIDGE SUPERSTRUCTURE FOR BRIDGE #3
PLACEMENT OF PRE-FABRICATED STEEL BRIDGE SUPERSTRUCTURE FOR BRIDGE #4
PLACEMENT/CONSTRUCTION OF 2X4 WOOD DECK
BRIDGE #1 EARTHFILL RAMPS AND FILL FOR SIDES OF ABUTMENT
BRIDGE #2 EARTHFILL RAMPS AND FILL FOR SIDES OF ABUTMENT
BRIDGE #3 EARTHFILL RAMPS AND FILL FOR SIDES OF ABUTMENT
BRIDGE #4 EARTHFILL RAMPS AND FILL FOR SIDES OF ABUTMENT
EROSION CONTROL BLANKETS FOR RAMP SIDES SLOPES AND FILL ON SIDES OF ABUTMENTS
SEEDING AND MULCHING
SILT FENCE
OPTIONAL ITEMS BRIDGE #5
BRIDGE #5 ABUTMENTS
STEEL BRIDGE SUPERSTRUCTURE FABRICATION (#5)
VERTICAL 2X4 TREAYED BRIDGE DECK MATERIALS (#5)
PLACEMENT OF PRE-FABRICATED STEEL BRIDGE SUPERSTRUCTURE FOR BRIDGE #5
PLACEMENT/CONSTRUCTION OF 2X4 WOOD DECK
BRIDGE #5 EARTHFILL RAMPS AND FILL FOR SIDES OF ABUTMENT
EROSION CONTROL BLANKETS FOR RAMP SIDES SLOPES AND FILL ON SIDES OF ABUTMENTS
SEEDING AND MULCHING
SILT FENCE
“A” ROCK
END OF TABLE OF CONTENTS
File details come from the government source that posted it. Updated .