ORB7054_Trail Bridges Replacement_Wayne_drawings.pdf
PDF 14 MB Posted
- Attached to
- Trail Bridges Replacement Federal contract opportunity
- Solicitation number
- AG-52B1-S-10-0050
About this file
Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30_ORB7054_Trail Bridges_amend 1.pdf | ||
| ORB7054_Trail Bridges Replacement_Wayne_proposal documents_amend 1.doc | DOC document | |
| ORB7054_Trail Bridges Replacement_Wayne_Solicitation_amend 1.pdf | ||
| ORB7054_Trail Bridges Replacement_Wayne_specs_table of contents.pdf | ||
| ORB7054_Trail Bridges Replacement_Wayne_specs.pdf | ||
| ORB7054_Trail Bridges Replacement_Wayne_Davis Bacon Wage Rates.pdf | ||
| ORB7054_Trail Bridges Replacement_Wayne_spec_cover page.pdf | ||
| ORB7054_Trail Bridges Replacement_Wayne_proposal documents.pdf | ||
| ORB7054_Trail Bridges Replacement_Wayne_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EASTERN REGION
US Department of Agriculture Forest Service
HANGING ROCK TRAIL BRIDGES REPLACEMENT
Wayne National Forest Ironton Ranger District
SHEET SHEET TITLE
PROJECT
LOCATION
Region Nine
MAY 28 , 2010
GENERAL NOTES
USFS APPROVALS
STATEMENT OF QUANTITIES
FOR LOCATION & VICINITY PLAN SEE SITE PLAN SHEET 1 OF 12
Lawrence County, Ohio Hamilton & Elizabeth Township
SPECIAL NOTE: (ATV TRAIL SAFETY REQUIREMENTS) FOR BRIDGE #1 THRU #4 THE ACCESS ROUTE FOR
THE SITES WILL BE BY WAY OF EXISTING ATV TRAILS. WHEN MOVING SUPPLIES AND EQUIPMENT ON
THESE TRAILS THE CONTRACTOR WILL BE REQUIRED TO HAVE A SAFETY VEHICLES 50 FEET AHEAD OF
AND 50 FEET BEHIND THE CONTRACTORS EQUIPMENT WHEN IT USING THE ATV TRAIL. THESE SAFETY
VEHICLES WILL NEED TO BE EQUIPPED WITH FLASHING SAFETY LIGHTS AND FLAGGING.
AT THE BRIDGE CONSTRUCTION SITE THE CONTRACTOR SHALL BE REQUIRED TO POST DETOUR SIGNS
AROUND THE BRIDGE CONSTRUCTION SITE. THESE SIGNS SHALL BE POSTED ON THE EXISTING ATV
TRAILS 500 FEET EACH SIDE OF THE BRIDGE CONSTRUCTION SITE.
PLASTIC PROTECTION ZONE FENCING SHALL BE PLACED ACROSS EXISTING ATV TRAILS AT THE BRIDGE
CONSTRUCTION SITE SO ATV'S CANNOT ENTER BRIDGE CONSTRUCTION SITE
UNDERGROUND UTILITIES:
Drawing Title
Scale
Date
CAD File No.
Drawn
Drawing No.
Project
Date
Project Name
No.
Revision/Issue
Sheet of
DWS
1 12
Design:
TCWChecked:
TCW
PLOT ARCH SIZE "D"
HR_1_Bridge_Plan.dwg
ATV TRAIL
HR-#1 BRIDGE
ATV TRAIL
HR-#2 BRIDGE
HR-#3 BRIDGE
HR-#4 BRIDGE
HR-#5 BRIDGE
NEW ATV TRAIL
NEW ATV TRAIL
710700
( IN FEET )
GRAPHIC SCALE
0100 100 200 40050
Drawing Title
Scale
Date
CAD File No.
Drawn
Drawing No.
Project
Date
Project Name
No.
Revision/Issue
Sheet of
DWS
2 12
Design:
TCWChecked:
TCW
PLOT ARCH SIZE "D"
HR_1_2_3_Bridge_Plan.dwg
EXCAVATION AREA FOR FILL
HR-#3 BRIDGEHR-#2 BRIDGE
ATV TRAIL
EXCAVATION AREA FOR FILL
ATV TRAIL
NEW ATV TRAIL
HR-#1 BRIDGE
NEW ATV TRAIL
EXCAVATION AREA FOR FILL
ATV TRAIL
ATV TRAIL
-138
EXCAVATION AREA FOR FILL
CONTRACTOR SHALL REMOVE EXISTING WOOD BRIDGE.
THE OLD BRIDGE MATERIAL BECOMES PROPERTY OF
THE CONTRACTOR AND SHALL BE REMOVED FROM USFS
PROPERTY AND DISPOSED OF ACCORDING TO ALL
LOCAL AND OHIO LAWS.
-50 -40 -30 -20 -10 0 10 20 30 40 50
-60
660 660
60 70 80-70-80-90-100-110-120-130 90 100 110 120 130
EXISTING GROUND
GEOTEXTILE (TYPE II-B)
EXISTING GROUND
8'
3 12" X .250 WALL PIPE
RAILING & POSTS3 12" X .250 WALL PIPE
RAILING & POSTS
2X4 VERTICAL
TIMBER DECK
W10X10 (TYP.) THE TOP 6 INCH CELLS ALL FILLED WITH QUIKRETE
CONCRETE MIX AND HAND COMPACTED
COMPACTED SOIL
FILL (COMPACTED)
FILLFILL
EXISTING GROUND
GEOTEXTILE (TYPE II-B)
EXISTING GROUND
8'
3 12" X .250 WALL PIPE
RAILING & POSTS3 12" X .250 WALL PIPE
RAILING & POSTS
2X4 VERTICAL
TIMBER DECK
W10X10 (TYP.) THE TOP 6 INCH CELLS ALL FILLED WITH QUIKRETE
CONCRETE MIX AND HAND COMPACTED
COMPACTED SOIL
FILL (COMPACTED)
FILLFILL
( IN FEET )
GRAPHIC SCALE
020 20 40 8010
Drawing Title
Scale
Date
CAD File No.
Drawn
Drawing No.
Project
Date
Project Name
No.
Revision/Issue
Sheet of
DWS
3 12
Design:
TCWChecked:
TCW
PLOT ARCH SIZE "D"
ATV TRAIL
HR-#1 BRIDGE
ATV TRAIL
NEW ATV TRAIL
NEW ATV TRAIL
ATV TRAIL TO BE
REMOVED
HR_1_Bridge_Plan.dwg
ATV TRAIL TO BE
REMOVED
'A
A'
'B
B'
-90
EXCAVATION AREA FOR FILL
-50 -40 -30 -20 -10 0 10 20 30 40 50
-60-70-80-90
CONTRACTOR SHALL REMOVE EXISTING WOOD BRIDGE.
THE OLD BRIDGE MATERIAL BECOMES PROPERTY OF THE
CONTRACTOR AND SHALL BE REMOVED FROM USFS
PROPERTY AND DISPOSED OF ACCORDING TO ALL LOCAL
AND OHIO LAWS.
EXISTING GROUND
GEOTEXTILE (TYPE II-B)
EXISTING GROUND
8'
3 12" X .250 WALL PIPE
RAILING & POSTS3 12" X .250 WALL PIPE
RAILING & POSTS
2X4 VERTICAL
TIMBER DECK
W10X10 (TYP.) THE TOP 6 INCH CELLS ALL FILLED WITH QUIKRETE
CONCRETE MIX AND HAND COMPACTED
COMPACTED SOIL
FILL (COMPACTED)
FILLFILL
EXISTING GROUND
GEOTEXTILE (TYPE II-B)
EXISTING GROUND
8'
3 12" X .250 WALL PIPE
RAILING & POSTS3 12" X .250 WALL PIPE
RAILING & POSTS
2X4 VERTICAL
TIMBER DECK
W10X10 (TYP.) THE TOP 6 INCH CELLS ALL FILLED WITH QUIKRETE
CONCRETE MIX AND HAND COMPACTED
COMPACTED SOIL
FILL (COMPACTED)
FILLFILL
( IN FEET )
GRAPHIC SCALE
020 20 40 8010
Drawing Title
Scale
Date
CAD File No.
Drawn
Drawing No.
Project
Date
Project Name
No.
Revision/Issue
Sheet of
DWS
4 12
Design:
TCWChecked:
TCW
PLOT ARCH SIZE "D"
ATV TRAIL
HR-#2 BRIDGE
ATV TRAIL
HR_2_Bridge_Plan.dwg
'A
A'
B'
'B
674676
680 678
EXCAVATION AREA FOR FILL
-50 -40 -30 -20 -10 0 10 20 30 40 50
60 70 80 90-60-70-80
CONTRACTOR SHALL REMOVE EXISTING WOOD BRIDGE.
THE OLD BRIDGE MATERIAL BECOMES PROPERTY OF THE
CONTRACTOR AND SHALL BE REMOVED FROM USFS
PROPERTY AND DISPOSED OF ACCORDING TO ALL LOCAL
AND OHIO LAWS.
EXISTING GROUND
GEOTEXTILE (TYPE II-B)
EXISTING GROUND
8'
3 12" X .250 WALL PIPE
RAILING & POSTS3 12" X .250 WALL PIPE
RAILING & POSTS
2X4 VERTICAL
TIMBER DECK
W10X10 (TYP.) THE TOP 6 INCH CELLS ALL FILLED WITH QUIKRETE
CONCRETE MIX AND HAND COMPACTED
COMPACTED SOIL
FILL (COMPACTED)
FILLFILL
EXISTING GROUND
GEOTEXTILE (TYPE II-B)
EXISTING GROUND
8'
3 12" X .250 WALL PIPE
RAILING & POSTS3 12" X .250 WALL PIPE
RAILING & POSTS
2X4 VERTICAL
TIMBER DECK
W10X10 (TYP.) THE TOP 6 INCH CELLS ALL FILLED WITH QUIKRETE
CONCRETE MIX AND HAND COMPACTED
COMPACTED SOIL
FILL (COMPACTED)
FILLFILL
( IN FEET )
GRAPHIC SCALE
020 20 40 8010
Drawing Title
Scale
Date
CAD File No.
Drawn
Drawing No.
Project
Date
Project Name
No.
Revision/Issue
Sheet of
DWS
5 12
Design:
TCWChecked:
TCW
PLOT ARCH SIZE "D"
ATV TRAIL
HR-#3 BRIDGE
ATV TRAIL
HR_3_Bridge_Plan.dwg
'A
A'
'B
B'
-50
( IN FEET )
GRAPHIC SCALE
050 50 100 20025
Drawing Title
Scale
Date
CAD File No.
Drawn
Drawing No.
Project
Date
Project Name
No.
Revision/Issue
Sheet of
DWS
6 12
Design:
TCWChecked:
TCW
PLOT ARCH SIZE "D"
HR_4_Bridge_Plan.dwg
ATV TRAIL
ATV TRAIL
EXCAVATION AREA FOR FILL
HR-#4 BRIDGE
-50
EXCAVATION AREA FOR FILL
-50 -40 -30 -20 -10 0 10 20 30 40 50
CONTRACTOR SHALL REMOVE EXISTING WOOD BRIDGE.
THE OLD BRIDGE MATERIAL BECOMES PROPERTY OF THE
CONTRACTOR AND SHALL BE REMOVED FROM USFS
PROPERTY AND DISPOSED OF ACCORDING TO ALL LOCAL
AND OHIO LAWS.
EXISTING GROUND
GEOTEXTILE (TYPE II-B)
EXISTING GROUND
8'
3 12" X .250 WALL PIPE
RAILING & POSTS3 12" X .250 WALL PIPE
RAILING & POSTS
2X4 VERTICAL
TIMBER DECK
W10X10 (TYP.) THE TOP 6 INCH CELLS ALL FILLED WITH QUIKRETE
CONCRETE MIX AND HAND COMPACTED
COMPACTED SOIL
FILL (COMPACTED)
FILLFILL
EXISTING GROUND
GEOTEXTILE (TYPE II-B)
EXISTING GROUND
8'
3 12" X .250 WALL PIPE
RAILING & POSTS3 12" X .250 WALL PIPE
RAILING & POSTS
2X4 VERTICAL
TIMBER DECK
W10X10 (TYP.) THE TOP 6 INCH CELLS ALL FILLED WITH QUIKRETE
CONCRETE MIX AND HAND COMPACTED
COMPACTED SOIL
FILL (COMPACTED)
FILLFILL
( IN FEET )
GRAPHIC SCALE
010 10 20 405
Drawing Title
Scale
Date
CAD File No.
Drawn
Drawing No.
Project
Date
Project Name
No.
Revision/Issue
Sheet of
DWS
7 12
Design:
TCWChecked:
TCW
PLOT ARCH SIZE "D"
HR_4_Bridge_Plan.dwg
ATV TRAIL
HR-#4 BRIDGE
ATV TRAIL
'A
A'
'B
B'
( IN FEET )
GRAPHIC SCALE
050 50 100 20025
Drawing Title
Scale
Date
CAD File No.
Drawn
Drawing No.
Project
Date
Project Name
No.
Revision/Issue
Sheet of
DWS
8 12
Design:
TCWChecked:
TCW
PLOT ARCH SIZE "D"
HR_5_Bridge_Plan.dwg
EXCAVATION AREA FOR FILL
EXCAVATION AREA FOR FILL
HR-#5 BRIDGE
NEW ATV TRAIL
APPROXIMATE
LOCATION N.I.C.
NEW ATV TRAIL
APPROXIMATE
LOCATION N.I.C.
TEMPORARY ACCESS ROAD
OFF OF S.R. 522
-50 -40 -30 -20 -10 0 10 20 30 40 50
-60
60 70 80-70-80-90-100 90 100
EXISTING GROUND
GEOTEXTILE (TYPE II-B)
EXISTING GROUND
8'
3 12" X .250 WALL PIPE
RAILING & POSTS3 12" X .250 WALL PIPE
RAILING & POSTS
2X4 VERTICAL
TIMBER DECK
W10X10 (TYP.) THE TOP 6 INCH CELLS ALL FILLED WITH QUIKRETE
CONCRETE MIX AND HAND COMPACTED
COMPACTED SOIL
FILL (COMPACTED)
FILLFILL
EXISTING GROUND
GEOTEXTILE (TYPE II-B)
EXISTING GROUND
8'
3 12" X .250 WALL PIPE
RAILING & POSTS3 12" X .250 WALL PIPE
RAILING & POSTS
2X4 VERTICAL
TIMBER DECK
W10X10 (TYP.) THE TOP 6 INCH CELLS ALL FILLED WITH QUIKRETE
CONCRETE MIX AND HAND COMPACTED
COMPACTED SOIL
FILL (COMPACTED)
FILLFILL
30'
54" HR #5 BRIDGE
"A" ROCK BARRIER
"A" ROCK BARRIER
54"10' 10'
5' 5'
( IN FEET )
GRAPHIC SCALE
020 20 40 8010
Drawing Title
Scale
Date
CAD File No.
Drawn
Drawing No.
Project
Date
Project Name
No.
Revision/Issue
Sheet of
DWS
9 12
Design:
TCWChecked:
TCW
PLOT ARCH SIZE "D"
HR_5_Bridge_Plan.dwg
NEW ATV TRAIL
APPROXIMATE
LOCATION N.I.C.
HR-#5 BRIDGE
NEW ATV TRAIL
APPROXIMATE
LOCATION N.I.C.
'A
A'
'B
B'
'X X
"A" ROCK BARRIER
SEE DETAIL
"A" ROCK BARRIER
SEE DETAIL
TEMPORARY ACCESS ROAD
OFF OF S.R. 522
NOTE:
CONTRACTOR WILL REQUIRED TO OBTAIN AND PAY
FOR ODOT PERMITS FOR TEMPORARY ACCESS ROAD.
APPROACH FILL USING
ON-SITE EXISTING SOIL
40'
G E
O W
E B
C E
LL
C
O N
C R
E
TE
/S O
IL
A
B U
TM
E
N T
8' T
O
TA
L W
IT
H
' B
E
LO
W E
X
IS
TI
N
G G
R A
D E
G E
O W
E B
C E
LL
C
O N
C R
E
TE
/S O
IL
A
B U
TM
E
N T
8' T
O
TA
L W
IT
H
' B
E
LO
W E
X
IS
TI
N
G G
R A
D E
APPROACH FILL USING
ON-SITE EXISTING SOIL
SEE DETAIL THIS SHEET
M
IN
. 3
M
IN
. 3
20"W10X10 (TYP.)
2X4 VERTICAL
TIMBER DECK
3 12" X .250 WALL PIPE
RAILING & POSTS
STEEL PLATE 8.7634' LONG
X 20"(L) X 10" (D) EACH END SEE
SHEET X OF X FOR LOCATION.
STEEL PLATE 8.7634' LONG
X 20" X 20' EACH END SEE
SHEET X OF X FOR LOCATION.
20"
3 12" X .250 WALL PIPE
RAILING & POSTS
3 12" X .250 WALL PIPE
RAILING & POSTS
L 4" X 3" X 1 4"
DECK RETAINING
ANGLES
L 3 1/2" X 3" X 1 4"
X 8' LONG DECK
RETAINING
ANGLES
4" X 12" PLATE X 40' LONG
GEOWEB CONCRETE/SOIL ABUTMENT
GEOWEB ABUTMENT
20"
4" X 12" PLATE X 40' LONG
2X4 VERTICAL
TIMBER DECK
4" (T) STEEL PLATE WELDED
ACROSS THE COMPLETE WIDTH
OF BRIDGE
3'
( IN FEET )
GRAPHIC SCALE
02 2 4 81
Drawing Title
Scale
Date
CAD File No.
Drawn
Drawing No.
Project
Date
Project Name
No.
Revision/Issue
Sheet of
DWS
10 12
Design:
TCWChecked:
TCW
PLOT ARCH SIZE "D"
HR_Bridge_Details.dwg
( IN FEET )
01 1 2 4.5
1.
8.
40'
4' (TYP.)
2.
5' 10' 10' 10' 5'
40'
3 12" X .250 WALL PIPE
RAILING & POSTS
3.
2X4 VERTICAL
TIMBER DECK
W8X8 (TYP.) W10X10 (TYP.)
12"
6" X .406 WALL TOW
BAR EACH END
6" X .406 WALL TOW
BAR EACH END
L 4" X 3" X 14"
DECK RETAINING
ANGLES
3 12" X .250 WALL PIPE
RAILING & POSTS
W10X10 (TYP.)
W8X8 (TYP.)
8'
2.
2.
2.
6" X .406 WALL TOW
BAR EACH END
6" X .406 WALL TOW
BAR EACH END
6" X .406 WALL TOW
BAR EACH END
6" X .406 WALL TOW
BAR EACH END
WELDED IN THE FIELD
6" X .406 WALL TOW
BAR EACH END
WELDED IN THE FIELD
6" X .406 WALL TOW
BAR EACH END
6" X .406 WALL TOW
BAR EACH END
1.
W10X10 (TYP.)
W8X8 (TYP.)
3 12" X .250 WALL PIPE
RAILING & POSTS
L 3 1/2" X 3" X 1 4"
LONG DECK
RETAINING
ANGLES ACROSS
COMPLETE WIDTH
OF BRIDGE
L 4" X 3" X 1 4"
DECK RETAINING
ANGLES
L 4" X 3" X 14"
DECK RETAINING
ANGLES
L 4" X 3" X 14"
DECK RETAINING
ANGLES
CL
CL
CL
2X4 VERTICAL
TIMBER DECK
"A
5.9427' (T
YP.)
5.9427' (TYP.)
STEEL PLATE 8.7634' LONG X 20" (L) X 10" (D)
EACH END SEE SHEET X OF X.
STEEL PLATE 8.7634' LONG X 20" (L) X 10" (D)
EACH END SEE SHEET X OF X.
NOTE:
THE TWO (2) SECTIONS THAT ARE 3.56 FT. WIDE ( 3 FT. - 6 3
4 INCHES) WILL BE FABRICATED OFF SITE
AND SKIDDED TO SITE BY USE OF ATV TRAILS. ONCE THE 3.56 FT. SECTION ARE PLACED ON ABUTMENTS
THE CENTER 1.56 FT. TOW BAR SECTION BE WELDED IN PLACE.
6" X .406 WALL TOW
BAR EACH END
"A
L 3 1/2" X 3" X 1
4" LONG
DECK RETAINING
ANGLES ACROSS
COMPLETE WIDTH
OF BRIDGE
L 3 1/2" X 3" X 1
4" LONG
DECK RETAINING
ANGLES ACROSS
COMPLETE WIDTH
OF BRIDGE
L 3 1/2" X 3" X 1
4" LONG
DECK RETAINING
ANGLES ACROSS
COMPLETE WIDTH
OF BRIDGE
L 3 1/2" X 3" X 1
4" LONG
DECK RETAINING
ANGLES ACROSS
COMPLETE WIDTH
OF BRIDGE
L 3 1/2" X 3" X 1
4" LONG
DECK RETAINING
ANGLES ACROSS
COMPLETE WIDTH OF
BRIDGE
1" DIA. HOLE
NOTE: ONCE BRIDGE IS PLACED ON
ABUTMENT A 7/8-INCH DIA. STEEL
BAR THRU 1-INCH DIA. HOLE 4 FEET
INTO CENTER SOIL MATERIAL.
1" DIA. HOLE
NOTE: ONCE BRIDGE IS PLACED ON
ABUTMENT A 7/8-INCH DIA. STEEL
BAR THRU 1-INCH DIA. HOLE 4 FEET
INTO CENTER SOIL MATERIAL.
4"
W10X10 (TYP.)8"X4" BOX PLATE
2X4 VERTICAL
TIMBER DECK
2X4 VERTICAL
TIMBER DECK
W10X10 (TYP.)8"X4" BOX PLATE
3 12" X .250 WALL PIPE
RAILING & POSTS
3 12" X .250 WALL PIPE
RAILING & POSTS
4" X 12" PLATE X 40' LONG
(SEE NOTE 1)
L 4" X 3" X 14"
DECK
RETAINING
ANGLES
L 4" X 3" X 1 4"
DECK
RETAINING
ANGLES
4" X 12" PLATE X 40' LONG
(SEE NOTE 1)
NOTE 1: THE 4" X 12" (T) PLATE SHALL
BE INSTALLED AFTER 2 X 4 VERTICAL
TIMBER DECK IS INSTALLED. THESE
PLATE SHALL BE SECURED BY SPOT
WELDS SPACED 12 INCH ON CENTER.RAILING POST SHALL RUN COMPLETE
LENGTH OF BOX PLATE AND WELDED
COMPLETE LENGTH.
NAILS
( IN FEET )
GRAPHIC SCALE
02 2 4 81
Drawing Title
Scale
Date
CAD File No.
Drawn
Drawing No.
Project
Date
Project Name
No.
Revision/Issue
Sheet of
DWS
11 12
Design:
TCWChecked:
TCW
PLOT ARCH SIZE "D"
NOTES
ALL STEEL CONNECTIONS TO BE WELDED. ALL WELDING SHALL BE IN ACCORDANCE
WITH D1.1-88 WELDING STANDARDS. STEEL SHALL BE ASTM A 588.
THE TYPICAL STRUCTURAL LUMBER GRADE DECKING SYSTEM IS NOMINAL 2"X4"
TREATED SOUTHERN YELLOW PINE, LAID EDGEWAYS PERPENDICULAR TO THE BEARING
STRINGERS. THE 2 X 4 VERTICAL FLOORING SYSTEMS SHALL HAVE WOOD
PRESERVATION TREATMENT TT-W-571 "WOOD PRESERVATIVE: RECOMMENDED
TREATMENT PRACTICE" FOR THE EXPOSURE IN THESE APPLICATIONS. THE
PRESERVATIVE FORMULATION MUST BE REGISTERED FOR USE BY THE EPA UNDER THE
LATEST REVISION OF FIFRA AND SECTION 716.03 - TREATED STRUCTURAL TIMBER AND
LUMBER OF FP-03 STANDARDS FOR CONSTRUCTION OF ROADS AND BRIDGES ON
FEDERAL HIGHWAY PROJECTS. CERTIFICATIONS MUST BE SUBMITTED THAT STATE THE
TREATMENT MEETS ALL OF THE ABOVE REQUIRE MONTS.
DECK PANELS SHALL BE NAILED 12" ON CENTER, STAGGERED. USING 16d GALVANIZED
NAILS. SO AS TO BE COMPATIBLE WITH WOOD PRESERVATIVE TREATMENT.
HR_Bridge_Details.dwg
( IN FEET )
01 1 2 4.5
9.2 2.8 2.37.6
10'
6'
2" STEEL TUBING STRETCHER FRAME
1" DIA. STEEL PINS SPACED SO AS TO FIT
GW30V61029PT OR APPROVED EQUAL
10'
6'
THE TWO (2) OUTSIDE CELLS FOR EACH 6
INCH SHALL BE FILLED WITH QUIKRETE
CONCRETE MIX AND HAND COMPACTED.
THE TOP 6 INCH LAYER SHALL ALL CELLS
FILLED WITH CONCRETE AND HAND
COMPACTED.
FILL CENTER CELLS OF 6 INCH GEOWEB CELL LAYER
WITH ON SITE SOIL APPROVED BY COR AND HAND
COMPACTED EXCEPT FOR FINAL 6 INCH LAYER WHICH
WILL HAVE ALL CELLS FILLED WITH QUIKRETE
CONCRETE MIX.
3' H
E
IG
H T
V A
R
IO
U S
F O
R E
A C
H B
R
ID
G E
A N
D
IS
G
IV
E N
O N
P
LA
N S
H E
E T
FO
R
B R
ID
G
E
NOTE:
GEOWEB CELL CONCRETE/SOIL
ABUTMENT WILL BE INSTALLED
THREE (3) FEET BELOW EXISTING
GROUND SURFACE.
EXISTING GROUNDEXISTING GROUND
"A A"
THE TWO (2) OUTSIDE CELLS TO BE FILLED
WITH QUIKRETE CONCRETE MIX AND HAND
COMPACTED.
THE TOP 6 INCH CELLS ALL FILLED WITH
QUIKRETE CONCRETE MIX AND HAND
COMPACTED
GEOTEXTILE (TYPE II-B)
COMPACTED SOIL FILL (COMPACTED)
8' T
O
TA
L
#5 REBAR SEE
DETAIL BELOW
NOTE:
THE REBAR WILL BE PLACED IN THE
CENTER OF EACH CONCRETE CELL.
OVERLAP OF REBAR WILL BE THREE (3)
INCHES AND WIRE TIED TOGETHER.
WIRE TIE REBAR
WIRE TIE REBAR
6" CELL
6" CELL
Drawing Title
Scale
Date
CAD File No.
Drawn
Drawing No.
Project
Date
Project Name
No.
Revision/Issue
Sheet of
DWS
12 12
Design:
TCWChecked:
TCW
PLOT ARCH SIZE "D"
HR_Bridge_Details.dwg
| COVER SHEET-24x36 Cover Sheet |
| HR_1-5_Site_Plan-Site_Plan1of12 |
| HR_1_2_3_Bridge_Plan-Plan_Layout_2of12 |
| HR_1_Bridge_Plan-Bridge_Plan_HR_1_3of12 |
| HR_2_Bridge_Plan-Bridge_Plan_HR_2_4of12 |
| HR_3_Bridge_Plan-Bridge_Plan_HR_3._5of12pdf |
| HR_4_Bridge_Plan-Plan_Layout_6of12 |
| HR_4_Bridge_Plan-Bridge_Plan_7of12 |
| HR_5_Bridge_Plan-Plan_Layout_8of12 |
| HR_5_Bridge_Plan-Bridge_Plan_9of12 |
| HR_Bridge_Details-cross_section_10of12 |
| HR_Bridge_Details-Bridge_Detail_11of12 |
| HR_Bridge_Details-Geoweb_Detail_12of12 |
File details come from the government source that posted it. Updated .