J3 - DB Wage Determination.doc
DOC document 107 KB Posted
- Attached to
- Recovery - Dining Hall Improvements - Monongahela NF Federal contract opportunity
- Solicitation number
- AG-4419-S-10-0494
About this file
J3 - Davis Bacon Wage Determination
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 1.rtf | RTF text file | |
| sf24 bid bond form.pdf | ||
| SF-1442 Contractor to complete and return.rtf | RTF text file | |
| J2 - drawings.pdf | ||
| AG-4419-S-10-0494.rtf | RTF text file | |
| J1 - specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DB Wage Determination
AG-4419-S-10-0494
General Decision Number: WV100002 03/12/2010 WV2
Superseded General Decision Number: WV20080002
State: West Virginia
Construction Type: Building
Counties: Barbour, Braxton, Brooke, Cabell, Calhoun, Doddridge, Gilmer, Grant, Hampshire, Hancock, Hardy, Harrison, Jackson, Kanawha, Lewis, Marion, Marshall, Mason, Mineral, Monongalia, Morgan, Ohio, Pendleton, Pleasants, Preston, Putnam, Randolph, Ritchie, Roane, Taylor, Tucker, Tyler, Upshur, Wayne, Webster, Wetzel, Wirt and Wood Counties in West
Virginia.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories). See Heavy and Highway Construction General Wage determination for all work in connection with the clearing and grading of site, also all paving incidental to the project, and all incidental water lines, sewers and other utilities to within 5 feet of the building line)
Modification Number Publication Date
0 03/12/2010
ASBE0002-003 08/01/2009
BROOKE, HANCOCK, HARRISON, MARION, MARSHALL,MINERAL, OHIO,
TYLER AND WETZEL COUNTIES
Rates Fringes
Asbestos Workers/Insulator.......$ 31.32 19.11
SCOPE OF WORK:
Includes application of all insulating materials, protective coverings and finishings to all types of mechanical systems.
ASBE0080-001 03/02/2009
BRAXTON, CABELL, CALHOUN, DODDRIDGE, GILMER, JACKSON, KANAWHA,
LEWIS, MASON, PLEASANTS, PUTNAM, RITCHIE, ROANE, UPSHUR, WAYNE,
WIRT AND WOOD COUNTIES.
Rates Fringes
Asbestos/Insulator Worker........$ 30.00 16.17
SCOPE OF WORK:
Includes application of all insulating materials, protective coverings and finishings to all types of mechanical systems.
BOIL0045-003 10/01/2009
GRANT COUNTY
Rates Fringes
BOILERMAKER......................$ 33.21 16.71
BOIL0154-003 06/01/2009
BROOKE AND HANCOCK COUNTIES
Rates Fringes
BOILERMAKER......................$ 36.70 20.82
BOIL0667-001 10/01/2009
BARBOUR, BRAXTON, CABELL, CALHOUN, DODDRIDGE, GILMER,
HAMPSHIRE, HARDY, HARRISON, JACKSON, KANAWHA, LEWIS, MARION,
MARSHALL, MASON, MINERAL, MORGAN, MONONGALIA, OHIO, PENDLETON,
PLEASANTS, PRESTON, PUTNAM, RANDOLPH, RITCHIE, ROANE, TAYLOR,
TUCKER, TYLER, UPSHUR, WAYNE, WEBSTER, WETZEL, WIRT AND WOOD
COUNTIES.
Rates Fringes
BOILERMAKER......................$ 36.94 15.32
BRMD0006-003 06/01/2008
MINERAL COUNTY
Rates Fringes
BRICKLAYER (Brick, Stone, Marble, Mosaic, Pointers, Caulkers, Artifical, Tilesetters and Terrazzo workers).........................$ 26.52 11.60
BRWV0001-001 07/01/2008
MARSHALL, OHIO, TYLER AND WETZEL COS.
Rates Fringes
BRICKLAYER.......................$ 25.10 12.19
TILE SETTER......................$ 25.10 12.19
BRWV0006-003 06/01/2009
CALHOUN, JACKSON, PLEASANTS, RITCHIE, ROANE, WIRT AND WOOD COS.
Rates Fringes
BRICKLAYER.......................$ 25.74 12.38
TILE SETTER......................$ 25.24 12.38
BRWV0009-002 12/01/2008
BRAXTON, KANAWHA AND PUTNAM COS.
Rates Fringes
Bricklayer, Stonemason...........$ 26.54 14.40
Marble, Tile Layer & Terrazzo
Worker...........................$ 26.54 14.40
BRWV0011-001 07/01/2008
BROOKE AND HANCOCK COS.
Rates Fringes
BRICKLAYER
Industrial..................$ 27.51 12.30
All other work..............$ 25.64 12.30
TILE SETTER......................$ 23.74 12.30
BRWV0015-002 12/01/2008
DODDRIDGE, GILMER, HARRISON, LEWIS, MARION AND UPSHUR COUNTIES
Rates Fringes
BRICKLAYER
Commercial..................$ 26.83 11.85
Industrial..................$ 28.35 11.85
BRWV0015-005 12/01/2008
BARBOUR, DODDRIDGE, GILMER, HARDY, HARRISON, LEWIS,MARION,
MONONGALIA, PRESTON, TAYLOR,TUCKER AND UPSHUR COUNTIES
Rates Fringes
Cement Masons:
Commerial...................$ 26.83 11.85
Industrial..................$ 28.35 11.85
BRWV0015-006 12/01/2007
CALHOUN, JACKSON, PLEASANTS, RITCHIE, ROANE, WIRT, AND WOOD
Counties
Rates Fringes
Marble & Tile Finisher...........$ 21.40 7.07
* CARP0003-003 12/01/2009
BROOKE, HANCOCK, MARSHALL (North of 39 degrees 46' latitude), and OHIO COUNTIES
Rates Fringes
Carpenters: (carpet, drywall, lather, and soft tile installers)......................$ 23.54 12.59
* CARP0302-001 12/01/2009
BUILDING
CABELL and WAYNE COUNTIES
Rates Fringes
Carpenter & Soft Floor Layer.....$ 27.44 14.51
PILEDRIVERMAN....................$ 27.85 14.51
* CARP0476-001 12/01/2009
BRAXTON, DODDRIDGE, GILMER, HARRISON, LEWIS, MARION, UPSHUR,
and WEBSTER COUNTIES
Rates Fringes
CARPENTER (carpet, drywall and soft tile installers)........$ 23.56 15.19
Piledriver.......................$ 24.06 15.19
* CARP0604-003 12/01/2009
BARBOUR, MONOGALIA, PRESTON, RANDOLPH, TAYLOR, and TUCKER
COUNTIES
Rates Fringes
Carpenter......................$ 23.56 15.19
* CARP0899-001 12/01/2009
CALHOUN, PLEASANTS, RITCHIE, TYLER, WIRT, and WOOD COUNTIES
Rates Fringes
Carpenters: (Soft Tile &
Carpet Installers, Drywall installers)......................$ 25.02 14.48
PILEDRIVERMAN....................$ 25.52 14.48
CARP1024-003 05/01/2008
GRANT, HAMPSHIRE, HARDY, AND PENDLETON COUNTIES
Rates Fringes
CARPENTER (dry wall hangers and soft layers).................$ 24.95 9.75
CARP1024-006 05/01/2008
MINERAL AND MORGAN COUNTIES
Rates Fringes
CARPENTER........................$ 24.95 9.75
* CARP1159-001 12/01/2009
JACKSON and MASON COUNTIES
Rates Fringes
CARPENTER........................$ 25.97 14.54
* CARP1207-006 12/01/2009
KANAWHA, PUTNAM, and ROANE COUNTIES
Rates Fringes
CARPENTER........................$ 26.63 14.30
Pile Driver......................$ 26.88 14.30
* CARP1519-001 12/01/2009
CABELL and WAYNE COUNTIES
Rates Fringes
MILLWRIGHT.......................$ 25.11 19.24
* CARP1755-001 12/01/2009
BRAXTON, CALHOUN, DODDRIDGE, GILMER, HARRISON, JACKSON,
KANAWHA,LEWIS, MARION, MASON, PLEASANTS, PUTNAM, RITCHIE,
ROANE, TYLER, UPSHUR, WETZEL, WIRT, and WOOD COUNTIES
Rates Fringes
MILLWRIGHT.......................$ 30.50 14.95
* CARP1871-019 12/01/2009
BROOKE, HANCOCK, MARSHALL, and OHIO COUNTIES
Rates Fringes
MILLWRIGHT.......................$ 26.96 11.84
* CARP2235-009 12/01/2009
BROOKE, HANCOCK, MARSHALL, OHIO, and WETZEL COUNTIES
Rates Fringes
PILEDRIVERMAN....................$ 29.95 12.17
ELEC0026-010 11/07/2005
HARDY COUNTY
Rates Fringes
ELECTRICIAN......................$ 21.71 7.80
ELEC0141-001 09/01/2009
BROOKE (Buffalo Twp. only) MARSHALL, OHIO, and WETZEL COUNTIES
Rates Fringes
CABLE SPLICER....................$ 28.61 19.75
ELECTRICIAN......................$ 28.36 19.75
ELEC0141-002 09/01/2009
BROOKE (Buffalo Twp. only), MARSHALL, OHIO, and WETZEL COUNTIES
Rates Fringes
Line Construction:
Cable Splicer...............$ 27.21 19.17
Groundsman..................$ 21.57 18.96
Lineman & Equipment
Operator....................$ 26.96 19.16
ELEC0246-003 11/01/2009
BROOKE (Except Buffalo Township) and HANCOCK COUNTIES
Rates Fringes
ELECTRICIAN......................$ 33.00 22.77+a
FOOTNOTE: a. 1 1/2 Paid Holidays: The last scheduled workday prior to Christmas & 4 hours on Good Friday.
ELEC0246-005 11/01/2004
BROOKE (Except Buffalo Twp.) and HANCOCK COUNTIES
Rates Fringes
Line Construction:
Groundman...................$ 18.70 51.5%+a
Lineman, Line Equipment
Operator, and Truck Driver..$ 28.00 51.5%+a
FOOTNOTE: a. 1-1/2 Paid Holidays: The last scheduled workday prior to Christmas Day and 4 Hours on Good Friday.
ELEC0307-003 12/01/2009
GRANT, HAMPSHIRE, MINERAL, and MORGAN COUNTIES
Rates Fringes
ELECTRICIAN......................$ 27.90 14.26
ELEC0307-004 06/01/2009
MINERAL COUNTY
Rates Fringes
LINE CONSTRUCTION: Equipment
Operator.........................$ 26.22 14.18
LINE CONSTRUCTION: Groundman....$ 17.94 13.81
LINE CONSTRUCTION: Lineman......$ 27.60 14.24
LINE CONSTRUCTION: Truck
Driver...........................$ 17.94 13.81
ELEC0317-001 06/01/2009
CABELL, MASON AND WAYNE COUNTIES
Rates Fringes
CABLE SPLICER....................$ 32.68 18.13
ELECTRICIAN......................$ 31.12 18.08
ELEC0317-009 05/25/2009
BRAXTON, CABELL, CALHOUN, GILMER, KANAWHA, MASON, PUTNAM,
ROANE, AND WAYNE COUNTIES
Rates Fringes
Line Construction:
Cable Splicer...............$ 30.49 16.64
Equipment Operator..........$ 21.70 15.17
Groundman...................$ 17.61 15.01
Lineman.....................$ 27.15 15.37
ELEC0466-001 06/01/2009
BRAXTON, CALHOUN, GILMER, KANAWHA, PUTNAM, ROANE, and WEBSTER
COUNTIES
Rates Fringes
CABLE SPLICER....................$ 35.06 14.10
ELECTRICIAN......................$ 31.87 14.01
ELEC0596-001 06/01/2009
BARBOUR, DODDRIDGE, HARRISON, LEWIS, MARION, MONONGALIA,
PENDLETON, PRESTON, RANDOLPH, TAYLOR, TUCKER, AND UPSHUR COS.
Rates Fringes
CABLE SPLICER....................$ 32.99 18.04
ELECTRICIAN......................$ 29.99 17.95
ELEC0596-002 06/01/2009
DODDRIDGE, LEWIS, MARION, AND UPSHUR COUNTIES
Rates Fringes
Line Construction:
Cable Splicers..............$ 29.69 17.94
Groundman & Truck Drivers...$ 21.59 17.70
Lineman & Equipment Op......$ 26.99 17.86
ELEC0968-002 06/01/2009
JACKSON, PLEASANTS, RITCHIE, TYLER, WIRT, and WOOD COUNTIES
Rates Fringes
Line Construction:
Cable Splicer, Equipment
Operator, Groundman, and
Lineman.....................$ 29.41 17.54
ELEC0968-003 06/01/2009
JACKSON, PLEASANTS, RITCHIE, TYLER, WIRT AND WOOD COUNTIES.
Rates Fringes
ELECTRICIAN......................$ 29.41 17.89
ELEV0006-002 01/01/2010
BROOKE, HANCOCK, MARION, MARSHALL, OHIO AND WETZEL COUNTIES:
Rates Fringes
Elevator Constructor.............$ 39.88 20.04
Paid Holidays:
New Year's Day; Memorial Day; Independence Day; Labor Day;
Verterans Dayl; Thanksgiving day; the Friday after
Thanksgiving Day; and Christmas Day.
Footnotes:
a. Employee contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ELEV0048-001 01/01/2010
BRAXTON, CABELL, CALHOUN, DODDRIDGE, GILMER, HARRISON, JACKSON,
KANAWHA, LEWIS, MASON, MINERAL, PLEASANTS, PUTNAM, RITCHIE,
ROANE, TYLER, PSHUR, WAYNE, WIRT, and WOOD COUNTIES
Rates Fringes
Elevator Constructor.............$ 38.53 20.035+a+b
PAID HOLIDAYS:
a. New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after
Thanksgiving, and Christmas Day.
b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years' service.
ENGI0132-001 12/01/2009
POWER EQUIPMENT OPERATORS:
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 30.26 16.83
GROUP 2.....................$ 29.91 16.83
GROUP 3.....................$ 28.91 16.83
GROUP 4.....................$ 21.41 16.83
GROUP 1: All friction cranes, derricks, tower cranes and all cranes with 180 ft. or more of boom including mast and jibs or lifting capacity of 100 tons or more and hoists with
30,000 pound line pull or more, cableways.
GROUP 2: Those operating cranes, derricks, tower cranes, boom trucks, shovels, draglines, clamshells, caisson drilling rigs and similar equipment with a lifting capacity of 15 tons and over. Mechanic with tools with 3/4 inch drive and below.
GROUP 3: All tow boats or work boats, backhoes, end loaders, all excavators, gradalls, all other mechanics, side boom cat, all other cranes and concrete mixing plants, core drills, two drum hoist, concrete pump, mechanically operated laser screed, self contained hydraulic air drills, directional drill operator, standard gauge locomotive, rubber tired scraper, power grader dozer, tractor and pan, push cat, asphalt and concrete paving equipment operator, compactor, compactor with blade, material hauler, articulating equipment, material hoist, wellpoint system, forklift, trencher, air tugger "A" frame truck, grease truck operator, all tractors.
GROUP 4: Fireman, deckhand, elevators, ross carrier, air compressor, high compression equipment, load handler, "bobcat" or skid steer loader, greaser tender, two bag and under concrete mixer, assistant engineer on standard gauge locomotives, locomotive cranes, truck and crawler cranes, brakeman on cranes used for moving rail cars (when equipment is moving cars only), rollers, Barber green loader, mechanic tender, welding machines, light plants, generators, conveyors, mechanical heaters and pump operators, masonry hoist and all farm type tractors.
IRON0301-001 12/01/2009
Rates Fringes
Ironworkers:
BRAXTON, RANDOLPH, &
WEBSTER COUNTIES............$ 29.16 16.54
KANAWHA & PUTNAM COUNTIES...$ 27.48 16.54
IRON0549-001 12/01/2009
BARBOUR (north west third of county to include the Twps. of
Philippi); BROOKE; HANCOCK; HARRISON; MARION; MARSHALL;
MONONGALIA; OHIO; TAYLOR; TYLER AND WETZEL COUNTIES
Rates Fringes
IRONWORKER.......................$ 29.75 15.69
IRON0568-003 05/01/2009
BARBOUR (Remainder of County), GRANT, MORGAN, PENDLETON, PRESTON, RANDOLPH (Remainder of County) AND TUCKER COUNTIES
Rates Fringes
IRONWORKER.......................$ 26.08 12.88
IRON0568-007 05/01/2009
HAMPSHIRE, HARDY AND MINERAL COUNTIES
Rates Fringes
IRONWORKER.......................$ 24.57 12.88
IRON0769-005 06/01/2009
CABELL AND WAYNE COUNTIES
Rates Fringes
Ironworkers:
ZONE 1:
0-10 miles from Union Hall.$ 28.38 17.37
ZONE 2:
10-50 miles from Union
Hall.......................$ 28.78 17.37
ZONE 3:
50 miles & over from
Union Hall.................$ 30.38 17.37
IRON0787-004 06/01/2009
CALHOUN, DODDRIDGE, GILMER, JACKSON, LEWIS, MASON, PLEASANTS,
RITCHIE, ROANE, UPSHUR, WIRT AND WOOD COUNTIES
Rates Fringes
Ironworkers:.....................$ 28.11 16.65
* LABO0379-003 12/01/2009
HAMPSHIRE, MARION, MINERAL, MONONGALIA, MORGAN, PRESTON, and
TAYLOR COUNTIES
Rates Fringes
Laborers:
Group 1.....................$ 19.93 10.40
Group 2.....................$ 20.29 10.40
Group 3.....................$ 20.72 10.40
LABORER CLASSIFICATIONS
GROUP 1: Laborer, Carpenter Tender, Water boy, Fire watch, Demolition worker, Landscape laborer.
GROUP 2: Powderman tender, Semi-skilled laborer, Scaffold builders, Chainmen and Rodmen, Grade Checker, Signal man, Brick mason tenders, Plasterer tenders, Cement finishers tenders, Stone mason tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrator operators, Tamper operators, Pavement Buster Operator, Chipping and peening hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Motorized buggy operators, Pipe layers tenders, Drill operators tenders, Sheeters and Shorers, Post hole digger operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Workmen working with asbestos, Batch house scale operators, Workmen working with acid mortar and acid brick, Workmen working in acid with cresote and mastic asphalt, Nozzlemen for gunnite or sandblasting, Tool room attendants, Ride or walk roller tampers, Asbestos abatement laborer, and Lead-based paint remover.
GROUP 3: Powderman, Air track operator, Pipe layer
(including laser beam set-up), Burner and Blacksmith.
LABO0543-001 06/01/2009
CABELL, MASON AND WAYNE COUNTIES
Rates Fringes
Laborers:
GROUP 1:....................$ 23.66 11.15
GROUP 2:....................$ 24.15 11.15
GROUP 3:....................$ 24.46 11.15
LABORER CLASSIFICATIONS
GROUP 1: Laborer, Carpenter tender, Flagmen, Water boy, Fire watch, Demolition worker, and Landscape laborer.
GROUP 2: Powderman tender, Semi-skilled laborer, Scaffold builders, Signal man, Brick mason tenders, Plasterer tenders, Cement finishers tenders, Stone mason tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrator operators, Tamper Operators, Chipping and peening hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Motorized buggy operators, Pipe layers tenders, Drill operators tenders Sheeters and shorers, Post hole digger operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Workmen working with asbestos, Batch house scale operators, Workmen working with acid mortar and acid brick, Workmen working in acid with cresote and mastic asphalt, Nozzlemen for gunnite or sandblasting, Tool room attendants, Ride or walk roller tampers, Toxic & Hazardous waste removal laborer, Asbestos abatement laborer, Lead-based paint remover, and Grade checker.
GROUP 3: Blacksmith, Powderman, Air track operator, Pipe layer (including laser beam set-up), and Burner.
LABO0809-002 07/01/2009
BROOKE AND HANCOCK COUNTIES
Rates Fringes
LABORER..........................$ 21.82 8.45
Asbestos Work; Hazardous Waste Work; Instrument & Laser; and
Lead Based Paint Removal - Additional $.50 per hour
Hot Pay - Additional $1.00 per hour when working with other crafts receiving hot pay
* LABO0984-001 12/01/2009
BARBOUR BRAXTON, DODRIDGE, GILMER, GRANT, HARDY, HARRISON,
LEWIS, PENDLETON, RANDOLPH, TUCKER, UPSHUR, and WEBSTER COUNTIES
Rates Fringes
LABORER
Group 1.....................$ 19.93 10.40
Group 2.....................$ 20.29 10.40
Group 3.....................$ 20.72 10.40
LABORER CLASSIFICATIONS
GROUP 1: Laborer, Carpenter Tender, Water boy, Fire watch, Demolition worker, Landscape laborer.
GROUP 2: Powderman tender, Semi-skilled laborer, Scaffold builders, Chainmen and Rodmen, Grade Checker, Signal man, Brick mason tenders, Plasterer tenders, Cement finishers tenders, Stone mason tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrator operators, Tamper operators, Pavement Buster Operator, Chipping and peening hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Motorized buggy operators, Pipe layers tenders, Drill operators tenders, Sheeters and Shorers, Post hole digger operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Workmen working with asbestos, Batch house scale operators, Workmen working with acid mortar and acid brick, Workmen working in acid with cresote and mastic asphalt, Nozzlemen for gunnite or sandblasting, Tool room attendants, Ride or walk roller tampers, Asbestos abatement laborer, and Lead-based paint remover.
GROUP 3: Powderman, Air track operator, Pipe layer
(including laser beam set-up), Burner and Blacksmith.
* LABO1085-001 12/01/2009
CALHOUN, JACKSON, PLEASANTS RITCHIE, TYLER, WIRT, and WOOD
COUNTIES
Rates Fringes
Laborers:
GROUP 1.....................$ 21.10 11.75
GROUP 2.....................$ 21.40 11.75
GROUP 3.....................$ 21.75 11.75
LABORER CLASSIFICATIONS
GROUP 1: Laborer, Carpenter Tender, Flagmen, Water Boy, Fire watch, Demolition worker, and Landscape laborer.
GROUP 2: Powderman tender, Semi-skilled laborer, Scoffold builders, Chainmen and Rodmen, Grade Checker, Signal man, Brick mason tenders, Plasterer tenders, Cement finishers tenders, Stone mason tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrator operators, Tamper operators, Chipping and peening, Hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Moterized Buggy operators, Pipe layers tenders, Drill operators tenders, Sheeters and shorers, Post hole digger operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Workmen working with asbestos, Batch house scale operators, Workmen working with acid mortar and acid brick, Workmen working in acid with cresote and mastic asphalt, Nozzlemen for gunnite or sandblasting, Tool room attendants, Ride or walk roller tampers, Asbestos abatement laborer, and Lead-based paint remover.
GROUP 3: Blacksmith, Powderman, Air track operator, Pipe layer (including laser beam set-up), and Burner.
* LABO1149-001 12/01/2009
MARSHALL, OHIO, and WETZEL COUNTIES
Rates Fringes
Laborers:
GROUP 1.....................$ 20.32 11.15
GROUP 2.....................$ 20.32 11.15
GROUP 3.....................$ 20.82 11.15
LABORER CLASSIFICATIONS
GROUP 1: Laborers, Carpenter tender, Flagmen, Water boy, Demolition worker, Tool room attendants, Fire watch, Watchmen, and Landscape laborer.
GROUP 2: Powerderman on concrete pump hose, Powderman tender, Semi-skilled laborer, Scaffold builders, Chainmen &
Rodmen, Grade checker, Signal man, Brick masons tenders, Plasterers tenders, Cement masons tenders, Stone masons tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrater operators, Tamper
Operator, Pavement buster operators, Chipping and peening hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Motorized buggy operators, Pipe layers tenders, Drill operators tenders, Sheeters and shorers, Post hole diggers operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Batch house scale operators, Workmen working with acid mortar, Mastic asphalt and acid brick, Workmen working in acid and with cresote, Nozzlemen for gunnite or sandblasting, Ride or walk roller tampers, Deep ditch and manholes vertical 6 ft. or more, and Scaffolding work over
50 ft. (inside or out).
GROUP 3: Blacksmith, Powderman, Air track operator, Pipe layer (including laser beam set-up), Burner, and Lead Based
Paint Removal Laborer.
* LABO1353-001 12/01/2009
KANAWHA, PUTNAM, and ROANE COUNTIES
Rates Fringes
Laborers:
GROUP 1.....................$ 22.14 11.15
GROUP 2.....................$ 22.76 11.15
GROUP 3.....................$ 23.60 11.15
GROUP 1: Laborer; Carpenter Tender; Water Boy; Demolition
Worker; Fire Watch; Landscape Laborer; and Flagmen.
GROUP 2: Powderman Tender; Semi-Skilled Laborer; Scaffold
Builder; Chain and Rodmen; Grade Checker; Signal Man; Brick
Masons Tenders; Plasterer Tenders; Cement Finisher Tenders;
Stone Masons Tenders; Lathers Tenders; Tile Setters
Tenders; Mortar Mixers; Jackhammer Operators; Vibrator
Operators; Tamper Operators; Pavement Buster Operators;
Chipping & Peening Hammer Operators; Air Siphon & Air Pump
Operators; Riprap Finishers; Concrete Saw Operators;
Concrete Technician; Power Saw Operators; Chain Saw;
Motorized Buggy; Pipelayers Tenders; Drill Operator
Tenders; Sheeters & Shorers; Post Hole Digger Operator;
Asphalt Rakers; Lance and/or Water Blaster Operators;
Blachsmith Tenders; Workmen working with Acid Mortar; Acid
Brick; Acid or Mastic Asphalt; Workmen working with
Creosote; Nozzlemen for Gunnite or Sandblasting; Tool Room
Attendants; Ride or Walk Roller Tampers, Toxic and
Hazardous Waste Removal Laborer, and Lead-Base Paint
Removal Laborer.
GROUP 3: Blacksmith; Powdermen; Air Track Operator; Pipe
Layer (including Laser Beam Set-Up); and Burner.
MARB0005-001 06/01/2005
CABELL, MASON (THAT PORTION SOUTH OF THE KANAWHA RIVER), AND
WAYNE COUNTIES
Rates Fringes
Marble, terrazzo and tile finisher.........................$ 20.38 12.75
PAIN0091-001 12/01/2008
BROOKE (SOUTH OF BUFFALO CREEK), MARSHALL, OHIO AND WETZEL COS.
Rates Fringes
Painters:
Brush, Roller, Paper hanger, Sand/Spray, Waterblast and Perfataping
(Including Automatic
Perfataping Tools)..........$ 22.55 10.00
* PAIN0091-010 12/01/2009
Brooke, Marshall, Ohio, and Wetzel Counties
Rates Fringes
GLAZIER..........................$ 25.09 10.53
PAIN0091-011 12/01/2008
Hancock County
Rates Fringes
GLAZIER..........................$ 24.60 9.00
PAIN0438-003 12/01/2008
BROOKE (NORTH OF BUFFALO CREEK), HANCOCK COUNTIES
Rates Fringes
Painters: (Painters, Drywall
Finishers & Paper Hangers, and Perfataping (Automatic
Taping Tools, Bazooka &
Banjo))..........................$ 22.55 10.00
PAIN0804-001 12/01/2008
BARBOUR, DODDRIDGE, GILMER, GRANT, HAMPSHIRE, HARDY, HARRISON,
LEWIS, MARION, MINERAL, MORGAN, MONONGALIA, PENDLETON, PRESTON,
RANDOLPH, TAYLOR, TUCKER, UPSHUR AND WEBSTER COS.
Rates Fringes
PAINTER (Bridges, Locks, Dams, High Tension Towers, Energized Substations)...........$ 27.83 10.00
PAINTER (Commercial).............$ 22.68 10.00
PAINTER (Industrial and Power
Generating Facilities)...........$ 24.83 10.00
PAIN0813-001 12/01/2008
CABELL, MASON AND WAYNE COUNTIES
Rates Fringes
Painters:
Brush and Roller, Drywall
Finishing and Texuring, Machine Toolstand and
Stilts, Spray and
Sandblast, and Wall
Covering and Vinyl..........$ 22.68 10.00
PAIN0970-001 12/01/2008
BRAXTON, CALHOUN, KANAWHA AND PUTNAM COUNTIES
Rates Fringes
Painters: (Brush Painting, A/Compressor Op., Roller
Painting, DryWall Pointers &
Tapers, Dipping & Mitten
Work, Sprayer Machine Op., Taping Machines, Mud Mixer, Pole Sander, Tape and
Spackling Teams, All
Synthetic Interior & Exterior
Work, Sandblaster, Water
Blaster, Steam Jenny Nozzle
Op., Swinging Scaffold and
Boat Swing Chair, Window Jack
Work, Vinyl & Paper Hangers:)
All new commercial projects; Commercial repaint or renovation projects where the total construction cost on the project (all trades combined) exceeds $500,000 in construction cost; all work on waste and water treatment facilities........$ 22.68 10.00
Work at manufacturing plants and power plants.....$ 24.83 10.00
PAIN1144-002 12/01/2008
JACKSON, PLEASANTS, RITCHIE, ROANE, TYLER, WIRT AND WOOD COS.
Rates Fringes
Painters:
Commercial: Brush, roller, Drywall Finisher
(Operating mechanical taping machines (men working behind the machine will receive the same rate), Pointers & tapers, Paper & vinyl hangers, Sign painter................$ 22.72 10.00
Industrial: Brush/roller, open structural steel, stacks, vent pipes, flag poles, electrical, radio and tv towers, tanks, spray, sand & water blast, pot man, hydrojet, and glove work..................$ 24.87 10.00
PAIN1195-001 12/01/2009
BARBOUR,BRAXTON, CABELL, CALHOUN, DODDRIDGE, GILMER, GRANT,
HAMPSHIRE, HARDY, HARRISON,KANAWHA, LEWIS, MARION, MASON,
MINERAL, MONOGALIA, MORGAN, PENDELTON, PRESTON, PUTNAM,
RANDOLPH, ROANE, TAYLOR, TUCKER WAYNE, WEBSTER AND UPSHUR
COUNTIES.
Rates Fringes
GLAZIER..........................$ 28.50 5.70
PAIN1195-007 12/01/2009
JACKSON, PLEASANTS, RITICHIE, TYLER, WIRT, and WOOD Counties
Rates Fringes
GLAZIER..........................$ 25.99 8.20
PLAS0039-003 07/01/2008
BROOKE, CALHOUN, GRANT, HAMPSHIRE, HANCOCK, HARDY, JACKSON,
MARSHALL, MINERAL,MORGAN, OHIO, PENDLETON, PLEASANTS, RANDOLPH,
RITCHIE, TAYLOR, WETZEL, WIRT & WOOD COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 23.88 10.20
Mechanical Equipment
(Floating, Grinding, Bushhammering or finishing)......$ 24.48 10.20
PLAS0039-004 07/01/2008
BROOKE, CALHOUN, GILMER, GRANT, HAMPSHIRE, HANCOCK, HARDY,
JACKSON, MARSHALL, MINERAL, MORGAN, OHIO, PENDLETON, PLEASANTS,
RANDOLPH, RITCHIE, TYLER, WETZEL, WIRT & WOOD COUNTIES
Rates Fringes
PLASTERER........................$ 23.88 10.20
* PLAS0887-001 06/01/2008
BRAXTON, CABELL, KANAWHA, MASON, PUTNAM, ROANE, WAYNE, and
WEBSTER COUNTIES
Rates Fringes
Cement Masons:...................$ 27.06 12.91
* PLAS0887-003 06/01/2008
BRAXTON, CABELL, KANAWHA, MASON, PUTNAM, ROANE, WAYNE, and
WEBSTER COUNTIES
Rates Fringes
PLASTERER........................$ 28.66 9.97
PLUM0083-002 07/01/2009
BROOKE COUNTY (North to Route #27 due east to the State Line, Excluding the City limits of Wellsburg), MARSHALL, OHIO AND
WETZEL COUNTIES
Rates Fringes
Plumber and Steamfitter..........$ 30.51 16.28
* PLUM0152-001 11/01/2009
HARRISON, LEWIS, MARION, MONONGALIA, TAYLOR, and UPSHUR COUNTIES
Rates Fringes
Plumbers and Pipefitters
Work at power plants, chemical plants, glass plants and manufacturing facilities..................$ 35.86 19.30
All other work..............$ 31.38 19.30
* PLUM0152-002 11/01/2009
BARBOUR, DODDRIDGE, and PRESTON COUNTIES
Rates Fringes
Plumbers and Pipefitters
Work at power plants, chemical plants, glass plants and manufacturing facilities..................$ 36.16 19.30
All other work..............$ 31.69 19.30
* PLUM0152-003 11/01/2009
BRAXTON, GILMER, RANDOLPH, and TUCKER COUNTIES
Rates Fringes
Plumbers and Pipefitters
Work at power plants, chemical plants, glass plants and manufacturing facilities..................$ 36.47 19.30
All other work..............$ 31.99 19.30
* PLUM0152-004 11/01/2009
GRANT, HAMPSHIRE, HARDY, MINERAL, and PENDLETON COUNTIES
Rates Fringes
Plumbers and Pipefitters
Work at power plants, chemical plants, glass plants and manufacturing facilities..................$ 36.77 19.30
All other work..............$ 32.30 19.30
PLUM0490-001 06/01/1998
BROOKE (North of Buffalo Creek),AND HANCOCK COUNTIES
Rates Fringes
Plumbers and Pipefitters.........$ 26.15 12.25
PLUM0521-002 06/01/2009
CABELL, MASON AND WAYNE COUNTIES
Rates Fringes
Plumbers and Pipefitters.........$ 29.75 14.97
PLUM0565-001 07/01/2009
CALHOUN, JACKSON, PLEASANTS, RITCHIE, TYLER, WIRT AND WOOD COS.
Rates Fringes
Plumbers and Pipefitters.........$ 30.98 17.08
PLUM0625-001 12/01/2009
KANAWHA, PUTNAM, ROANE, and WEBSTER COUNTIES
Rates Fringes
Plumber, Pipefitter, Steamfitter
Work at plants that are in the process of manufacturing a product.....$ 32.19 15.38
All other work..............$ 30.39 15.38
ROOF0034-002 05/01/2000
GRANT, HAMPSHIRE, HARDY, MINERAL, AND MORGAN COUNTIES
Rates Fringes
Roofers:
Composition Mopmen..........$ 16.25 5.05
Composition Roofer..........$ 16.00 5.05
Pitch Tear Off or Put On....$ 16.50 5.05
Slaters.....................$ 16.15 5.05
ROOF0185-004 06/01/2008
CABELL, KANAWHA, MASON, PUTNAM AND WAYNE COS.
Rates Fringes
Roofers:.........................$ 26.00 9.76
ROOF0188-002 07/01/2009
BROOKE, HANCOCK, MARSHALL AND OHIO COUNTIES
Rates Fringes
Roofers:
Coal Tar Pitch &
Waterproofing...............$ 25.42 10.35
Roofer......................$ 25.17 10.35
ROOF0242-002 06/01/2009
BARBOUR, BRAXTON, CALHOUN, DODDRIDGE, GILMER, HARRISON,
JACKSON, LEWIS, MARION, MONONGALIA, PENDLETON, PLEASANTS,
PRESTON, RANDOLPH, RITCHIE, ROANE, TAYLOR, TUCKER, TYLER,
UPSHUR, WETZEL, WIRT AND WOOD COUNTIES
Rates Fringes
ROOFER, Including Built Up, Composition and Single Ply
Roofs............................$ 23.81 9.81
SFWV0669-001 01/01/2010
BRAXTON, BROOKE, CABELL, CALHOUN, DODDRIDGE, GILMER, HANCOCK,
HARRISON, JACKSON, KANAWHA, LEWIS, MARION, MARSHALL, MASON,
MINERAL, OHIO, PLEASANTS, PUTNAM, RITCHIE, ROANE, TYLER,
UPSHUR, WAYNE, WETZEL, WIRT AND WOOD COUNTIES
Rates Fringes
SPRINKLER FITTER.................$ 30.10 17.10
SHEE0024-010 06/01/2008
CABELL AND WAYNE COUNTIES
Rates Fringes
Sheet metal worker...............$ 25.05 17.57
SHEE0033-015 12/01/2009
KANAWHA, MASON, and PUTNAM COUNTIES
Rates Fringes
Sheet Metal Worker...............$ 26.01 17.24
SHEE0033-017 07/01/2009
BROOKE, HANCOCK, MARSHALL AND OHIO COUNTIES
Rates Fringes
Sheet Metal Worker...............$ 26.61 16.22
SHEE0033-020 06/01/2009
BRAXTON, CALHOUN, DODDRIDGE, GILMER, HARRISON, JACKSON, LEWIS,
MONONGALIA, MARION, PLEASANTS, RITCHIE, ROANE, TYLER, UPSHUR,
WETZEL, WIRT AND WOOD COUNTIES
Rates Fringes
Sheet metal worker...............$ 27.05 17.37
SHEE0100-008 11/01/2009
MINERAL COUNTY
Rates Fringes
Sheet Metal Worker
0-40 miles from City Hall, Cumberland, Maryland........$ 23.25 15.19
41-65 miles from City
Hall, Cumberland, Maryland..$ 25.00 15.19
66+ miles from City Hall, Cumberland, Maryland........$ 25.50 15.19
TEAM0092-005 07/01/2008
BROOKE & HANCOCK COUNTIES
Rates Fringes
Truck drivers:
GROUP 1.....................$ 21.39 9.87
GROUP 2.....................$ 21.43 9.87
GROUP 3.....................$ 21.47 9.87
GROUP 4.....................$ 22.17 9.87
GROUP 5.....................$ 22.29 9.87
CLASSIFICATIONS
GROUP 1 - End Dump; Dumpster; Turnarocker; Ross Carrier;
Athry Wagon; Greaser; Tiremen; Articulated Dump
GROUP 2 - Flatboy Material Tuck, Dump & and Semi-Dump
Truck; Semi Trailer & Tractor Trailer
GROUP 3 - Tank Trucks (straight & semi)
GROUP 4 - Mechanic
GROUP 5 - Lowboy Trailer; Winch Truck; A-Frame; Forktruck;
Distributor Truck (front & back end) & Truck Crane
TEAM0175-002 06/01/2008
CALHOUN, GILMER, JACKSON, KANAWHA, PLEASANTS, RITCHIE, ROANE,
TYLER, WIRT AND WOOD COUNTIES
Rates Fringes
Truck drivers:
GROUP 1.....................$ 22.07 a
GROUP 2.....................$ 22.17 a
GROUP 3.....................$ 22.32 a
GROUP 4.....................$ 22.47 a
GROUP 5.....................$ 22.72 a
GROUP 6.....................$ 22.82 a
GROUP 7.....................$ 22.97 a
FOOTNOTE: a. $1,924.31 per month
TRUCK DRIVER CLASSIFICATIONS
GROUP 1 - Pick-Up; Panel; John Deere Gators or Similar
Equipment
GROUP 2 - Flat Body Material (Straight Jobs); Dump (Up to 5
cu. yds.); Greaser; Tank (Straight)
GROUP 3 - Dump (5 cu. yds. & over); Semi-Dump; Semi-Trailer
(whether Flat, Rack or Pole and hauled or pushed by truck or tractor); Agitator or Mixed (Up to 5 cu. yds.); Tank
(Semi); & Monorail
GROUP 4 - Low Boy Trailer; Winch; Fork; Distributor (Front &
Back End); Truck Crane; Agitator or Mixer (5 cu. yds. & over); Hydraulic Tail Gate; & Farm Type Tractor
GROUP 5 - Euclid; Dumpster; Turnarocker; Ross Carrier; Athey
Wagon or Similar Equipment; A-Frame; Hydrolift; & Dual
Purpose
GROUP 6 - Mechanic
GROUP 7 - Master Mechanic (3 or more mechanics employed)
TEAM0505-003 06/01/2009
CABELL, MASON AND WAYNE COUNTIES
Rates Fringes
Truck drivers:
GROUP 1.....................$ 29.57 12.84+A
GROUP 2.....................$ 30.10 12.84+A
GROUP 3.....................$ 30.27 12.84+A
GROUP 4.....................$ 30.75 12.84+A
GROUP 5.....................$ 31.17 12.84+A
GROUP 6.....................$ 31.39 12.84+A
TRUCK DRIVER CLASSIFICATIONS
GROUP 1 - Pickup; Station Wagon; Panel; Flatbody Material
Truck (Straight job); & Dump (Up to 5 cu. yds.)
GROUP 2 - Tank (Straight); Dump (5 cu. yds. & over); Agitator or Mixer (Up to 5 cu. yds.); & Flat Bed Tandem
GROUP 3 - Agitator or Mixer (5 cu. yds. & Over)
GROUP 4 - Mechanic; Tri-Axle Dump; Hydraulic Lift Tailgate;
Truck & Farm-type Tractor; End Dumpster; Turnarocker; Ross
Carrier; Athey Wagon; Semi-dump; Semi-trailer; Semi-tank; &
Lowboy Trailer
GROUP 5 - Master Mechanic
GROUP 6 - Winch; Fork; Distributor (Front End and Back End);
Truck Crane; & Monorail
A. Paid Holidays - New Years Day, Memorial Day, July 4th, Labor Day, Thanksgiving, Day After Thanksgiving & Christmas
Day
TEAM0697-002 07/01/2009
MARSHALL, OHIO AND WETZEL COUNTIES
Rates Fringes
TRUCK DRIVER
GROUP 1 - Pickup...........$ 21.64 13.25
GROUP 2 - Greaser..........$ 21.65 13.25
GROUP 3 - Flatbed
Material; Dump & Semi-Dump..$ 21.69 13.25
GROUP 4 - Tank (straight
& semi).....................$ 21.72 13.25
GROUP 5 - Semi-Tractor
Trailer.....................$ 21.74 13.25
GROUP 6 - Pole-Trailer.....$ 21.84 13.25
GROUP 7 - Agitator &
Mixer (Up to 5 cu. yds.)....$ 21.92 13.25
GROUP 8 - Euclid;
Dumpster; Turnarocker;
Ross Carrier; & Athey Wagon.$ 21.97 13.25
GROUP 9 - Agitator &
Mixer (Over 5 cu. yds.).....$ 22.00 13.25
GROUP 10 - Lowboy Trailer;
Winch; Fork & Distributor
(Front & Back End); &
Truck Crane.................$ 22.27 13.25
GROUP 11 - A-Frame..........$ 22.34 13.25
Group 12 - Mechanic.........$ 22.37 13.25
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .