Amended Schedule of Items 051410.docx

DOCX document 31 KB Posted

Attached to
RECOVERY - WALKER CULVERT REPLACEMENT, SMALL DAM REMOVAL, CHIPPEWA NF Federal contract opportunity
Solicitation number
AG-4419-S-10-0477
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center East

About this file

Replace the schedule of items to reflect the corrugated metal pipes that were originally listed with 3x1 corrugations can now be provided with either 3x1 or 5x1 corrugations.

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY - WALKER CULVERT REPLACEMENT, SMALL DAM REMOVAL, CHIPPEWA NF, newest first.
File Type Posted
Approved SF30.JPG JPG image
North Ojibway Impoundment Drawing.pdf PDF
Clauses B-M 042310.pdf PDF
Experience_Capability Statement.docx DOCX document
Wage Determination Statement MN547.docx DOCX document
Specifications Statement of Work.pdf PDF
Signed Cover.pdf PDF
Walker Culvert Replacement Drawings.pdf PDF
Clauses B-M.docx DOCX document
SF1442.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AAP# - CIM-0903/0909-8EW-224-0903-03

Walker Culvert Replacement/Small Dam Removal Project

Part 1 - The Schedule

Section B - Supplies or Services and Prices/Costs

Schedule of Items

Walker Culvert Replacement and Small Dam Removal Project

CHIPPEWA NATIONAL FOREST

Pay

Meth.
Est.

Unit

Total

Item #
Description
Meas.
Qty
Unit
Price

Price

North Ojibway Impoundment

1
15101-Mobilization
CQ
1
LS
2
15702-Silt Fence
CQ
1
LS
3
60201-Complete installation of 96” Corrugated Metal Pipe*
CQ
1
LS

.109 thickness for steel or

.105 thickness for aluminum

Method (C), 3x1” or 5x1” corrugations

4
62501-Seeding dry method (with erosion control mat)
CQ
1
LS

Moccasin Lake

5
15101-Mobilization
CQ
1
LS
6
15702-Silt Fence
CQ
1
LS
7
60201-Complete installation of 72” Corrugated Metal Pipe*
CQ
1
LS

.109 thickness for steel or

.105 thickness for aluminum

Method (C), 3x1” or 5x1” corrugations

8
62501-Seeding dry method (with erosion control mat)
CQ
1
LS

Cuba Hill

9
15101-Mobilization
CQ
1
LS
10
15702-Silt Fence
CQ
1
LS
11
60201-Complete installation of 48” Corrugated Metal Pipe*
CQ
1
LS

.079 thickness for steel or

.075 thickness for aluminum

Method (C), 2 2/3 x1/2” corrugations

12
62501-Seeding dry method (with erosion control mat)
CQ
1
LS

Pay

Meth.
Est.

Unit

Total

Item #
Description
Meas.
Qty
Unit
Price

Price

Little Smith Lake

13
15101-Mobilization
CQ
1
LS
14
15702-Silt Fence
CQ
1
LS
15
60201-Complete installation of 72” Corrugated Metal Pipe*
CQ
1
LS

.109 thickness for steel or

.105 thickness for aluminum

Method (C), 3x1” or 5x1” corrugations

16
62501-Seeding dry method (with erosion control mat)
CQ
1
LS

Highland Impoundment

17
15101-Mobilization
CQ
1
LS
18
15702-Silt Fence
CQ
1
LS
19
60201-Complete installation of 60” Corrugated Metal Pipe*
CQ
1
LS

.079 thickness for steel or

.075 thickness for aluminum

Method (C), 2 2/3 x1/2” corrugations

20
62501-Seeding dry method (with erosion control mat)
CQ
1
LS

Sucker Creek Tributary

21
15101-Mobilization
CQ
1
LS
22
15702-Silt Fence
CQ
1
LS
23
60201-Complete installation of 72” Corrugated Metal Pipe*
CQ
1
LS

.109 thickness for steel or

.105 thickness for aluminum

Method (C), 2 2/3 x1/2” corrugations

24
62501-Seeding dry method (with erosion control mat)
CQ
1
LS

Six Mile Tributary

25
15101-Mobilization
CQ
1
LS
26
15702-Silt Fence
CQ
1
LS
27
60201-Complete installation of 60” Corrugated Metal Pipe*
CQ
1
LS

.079 thickness for steel or

.075 thickness for aluminum

Method (C), 2 2/3 x1/2” corrugations

28
62501-Seeding dry method (with erosion control mat)
CQ
1
LS

Pay

Meth.
Est.

Unit

Total

Item #
Description
Meas.
Qty
Unit
Price

Price

Twin Lakes Camp

29
15101-Mobilization
CQ
1
LS
30
15702-Silt Fence
CQ
1
LS
31
60201-Complete installation of 60” Corrugated Metal Pipe*
CQ
1
LS

.079 thickness for steel or

.075 thickness for aluminum

Method (C), 2 2/3 x1/2” corrugations

32
62501-Seeding dry method (with erosion control mat)
CQ
1
LS

Lake 13 Tributary

33
15101-Mobilization
CQ
1
LS
34
15702-Silt Fence
CQ
1
LS
35
60201-Complete installation of 48” Corrugated Metal Pipe*
CQ
1
LS

.079 thickness for steel or

.075 thickness for aluminum

Method (C), 2 2/3 x1/2” corrugations

36
62501-Seeding dry method (with erosion control mat)
CQ
1
LS

Six Mile Impoundment Decommissioning

37
15101-Mobilization
CQ
1
LS
38
20301-Removal of sheet piling, concrete, wood
CQ
1
LS
39
62501-Seeding, dry method (with mulch)
CQ
1
LS

Sucker Bay Impoundment Decommissioning

40
15101-Mobilization
CQ
1
LS
41
15707-Straw Bale erosion control system
CQ
1
LS
42
20301-Removal of sheet piling, concrete, wood, culvert
CQ
1
LS
43
20402-Excavation and Embankment, Conservation of topsoil, Disposal of unsuitable materials
CQ
1
LS
44
21103-Roadway obliteration method 2
CQ
1
LS
45
30301-Reconditioning of roadbed, compaction A
CQ
1
LS
46
62501-Seeding, dry method (with mulch)
CQ
1
LS

Pay

Meth.
Est.

Unit

Total

Item #
Description
Meas.
Qty
Unit
Price

Price

Amik Bay Impoundment Decommissioning

47
15101-Mobilization
CQ
1
LS
48
15707-Straw Bale erosion control system
CQ
1
LS
49
20301-Removal of sheet piling, concrete, wood, culvert
CQ
1
LS
50
20402-Excavation and Embankment, Conservation of topsoil, Disposal of unsuitable materials
CQ
1
LS
51
30301-Reconditioning of roadbed, compaction A
CQ
1
LS
52
62501-Seeding, dry method (with mulch)
CQ
1
LS

TOTAL QUOTE FOR ALL ITEMS:

Note: CQ = Contract Quantity LS = Lump Sum

Quoter:

By

Telephone No.

(Signature)

FAX No.

Title

*The intent of this contract is for the construction of the proposed projects described in this contract. Unless otherwise specified, the Contractor shall furnish all labor, materials, equipment, tools, transportation; and will perform all work required to complete this project in accordance with the drawings, specifications, and provisions of the contract. Payment for the contract work will be made only for and under those items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for the items shown.

File details come from the government source that posted it. Updated .