Amended Schedule of Items 051410.docx
DOCX document 31 KB Posted
- Attached to
- RECOVERY - WALKER CULVERT REPLACEMENT, SMALL DAM REMOVAL, CHIPPEWA NF Federal contract opportunity
- Solicitation number
- AG-4419-S-10-0477
About this file
Replace the schedule of items to reflect the corrugated metal pipes that were originally listed with 3x1 corrugations can now be provided with either 3x1 or 5x1 corrugations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Approved SF30.JPG | JPG image | |
| North Ojibway Impoundment Drawing.pdf | ||
| Clauses B-M 042310.pdf | ||
| Experience_Capability Statement.docx | DOCX document | |
| Wage Determination Statement MN547.docx | DOCX document | |
| Specifications Statement of Work.pdf | ||
| Signed Cover.pdf | ||
| Walker Culvert Replacement Drawings.pdf | ||
| Clauses B-M.docx | DOCX document | |
| SF1442.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AAP# - CIM-0903/0909-8EW-224-0903-03
Walker Culvert Replacement/Small Dam Removal Project
Part 1 - The Schedule
Section B - Supplies or Services and Prices/Costs
Schedule of Items
Walker Culvert Replacement and Small Dam Removal Project
CHIPPEWA NATIONAL FOREST
Pay
| Meth. |
| Est. |
Unit
Total
| Item # |
| Description |
| Meas. |
| Qty |
| Unit |
| Price |
Price
North Ojibway Impoundment
| 1 |
| 15101-Mobilization |
| CQ |
| 1 |
| LS |
| 2 |
| 15702-Silt Fence |
| CQ |
| 1 |
| LS |
| 3 |
| 60201-Complete installation of 96” Corrugated Metal Pipe* |
| CQ |
| 1 |
| LS |
.109 thickness for steel or
.105 thickness for aluminum
Method (C), 3x1” or 5x1” corrugations
| 4 |
| 62501-Seeding dry method (with erosion control mat) |
| CQ |
| 1 |
| LS |
Moccasin Lake
| 5 |
| 15101-Mobilization |
| CQ |
| 1 |
| LS |
| 6 |
| 15702-Silt Fence |
| CQ |
| 1 |
| LS |
| 7 |
| 60201-Complete installation of 72” Corrugated Metal Pipe* |
| CQ |
| 1 |
| LS |
.109 thickness for steel or
.105 thickness for aluminum
Method (C), 3x1” or 5x1” corrugations
| 8 |
| 62501-Seeding dry method (with erosion control mat) |
| CQ |
| 1 |
| LS |
Cuba Hill
| 9 |
| 15101-Mobilization |
| CQ |
| 1 |
| LS |
| 10 |
| 15702-Silt Fence |
| CQ |
| 1 |
| LS |
| 11 |
| 60201-Complete installation of 48” Corrugated Metal Pipe* |
| CQ |
| 1 |
| LS |
.079 thickness for steel or
.075 thickness for aluminum
Method (C), 2 2/3 x1/2” corrugations
| 12 |
| 62501-Seeding dry method (with erosion control mat) |
| CQ |
| 1 |
| LS |
Pay
| Meth. |
| Est. |
Unit
Total
| Item # |
| Description |
| Meas. |
| Qty |
| Unit |
| Price |
Price
Little Smith Lake
| 13 |
| 15101-Mobilization |
| CQ |
| 1 |
| LS |
| 14 |
| 15702-Silt Fence |
| CQ |
| 1 |
| LS |
| 15 |
| 60201-Complete installation of 72” Corrugated Metal Pipe* |
| CQ |
| 1 |
| LS |
.109 thickness for steel or
.105 thickness for aluminum
Method (C), 3x1” or 5x1” corrugations
| 16 |
| 62501-Seeding dry method (with erosion control mat) |
| CQ |
| 1 |
| LS |
Highland Impoundment
| 17 |
| 15101-Mobilization |
| CQ |
| 1 |
| LS |
| 18 |
| 15702-Silt Fence |
| CQ |
| 1 |
| LS |
| 19 |
| 60201-Complete installation of 60” Corrugated Metal Pipe* |
| CQ |
| 1 |
| LS |
.079 thickness for steel or
.075 thickness for aluminum
Method (C), 2 2/3 x1/2” corrugations
| 20 |
| 62501-Seeding dry method (with erosion control mat) |
| CQ |
| 1 |
| LS |
Sucker Creek Tributary
| 21 |
| 15101-Mobilization |
| CQ |
| 1 |
| LS |
| 22 |
| 15702-Silt Fence |
| CQ |
| 1 |
| LS |
| 23 |
| 60201-Complete installation of 72” Corrugated Metal Pipe* |
| CQ |
| 1 |
| LS |
.109 thickness for steel or
.105 thickness for aluminum
Method (C), 2 2/3 x1/2” corrugations
| 24 |
| 62501-Seeding dry method (with erosion control mat) |
| CQ |
| 1 |
| LS |
Six Mile Tributary
| 25 |
| 15101-Mobilization |
| CQ |
| 1 |
| LS |
| 26 |
| 15702-Silt Fence |
| CQ |
| 1 |
| LS |
| 27 |
| 60201-Complete installation of 60” Corrugated Metal Pipe* |
| CQ |
| 1 |
| LS |
.079 thickness for steel or
.075 thickness for aluminum
Method (C), 2 2/3 x1/2” corrugations
| 28 |
| 62501-Seeding dry method (with erosion control mat) |
| CQ |
| 1 |
| LS |
Pay
| Meth. |
| Est. |
Unit
Total
| Item # |
| Description |
| Meas. |
| Qty |
| Unit |
| Price |
Price
Twin Lakes Camp
| 29 |
| 15101-Mobilization |
| CQ |
| 1 |
| LS |
| 30 |
| 15702-Silt Fence |
| CQ |
| 1 |
| LS |
| 31 |
| 60201-Complete installation of 60” Corrugated Metal Pipe* |
| CQ |
| 1 |
| LS |
.079 thickness for steel or
.075 thickness for aluminum
Method (C), 2 2/3 x1/2” corrugations
| 32 |
| 62501-Seeding dry method (with erosion control mat) |
| CQ |
| 1 |
| LS |
Lake 13 Tributary
| 33 |
| 15101-Mobilization |
| CQ |
| 1 |
| LS |
| 34 |
| 15702-Silt Fence |
| CQ |
| 1 |
| LS |
| 35 |
| 60201-Complete installation of 48” Corrugated Metal Pipe* |
| CQ |
| 1 |
| LS |
.079 thickness for steel or
.075 thickness for aluminum
Method (C), 2 2/3 x1/2” corrugations
| 36 |
| 62501-Seeding dry method (with erosion control mat) |
| CQ |
| 1 |
| LS |
Six Mile Impoundment Decommissioning
| 37 |
| 15101-Mobilization |
| CQ |
| 1 |
| LS |
| 38 |
| 20301-Removal of sheet piling, concrete, wood |
| CQ |
| 1 |
| LS |
| 39 |
| 62501-Seeding, dry method (with mulch) |
| CQ |
| 1 |
| LS |
Sucker Bay Impoundment Decommissioning
| 40 |
| 15101-Mobilization |
| CQ |
| 1 |
| LS |
| 41 |
| 15707-Straw Bale erosion control system |
| CQ |
| 1 |
| LS |
| 42 |
| 20301-Removal of sheet piling, concrete, wood, culvert |
| CQ |
| 1 |
| LS |
| 43 |
| 20402-Excavation and Embankment, Conservation of topsoil, Disposal of unsuitable materials |
| CQ |
| 1 |
| LS |
| 44 |
| 21103-Roadway obliteration method 2 |
| CQ |
| 1 |
| LS |
| 45 |
| 30301-Reconditioning of roadbed, compaction A |
| CQ |
| 1 |
| LS |
| 46 |
| 62501-Seeding, dry method (with mulch) |
| CQ |
| 1 |
| LS |
Pay
| Meth. |
| Est. |
Unit
Total
| Item # |
| Description |
| Meas. |
| Qty |
| Unit |
| Price |
Price
Amik Bay Impoundment Decommissioning
| 47 |
| 15101-Mobilization |
| CQ |
| 1 |
| LS |
| 48 |
| 15707-Straw Bale erosion control system |
| CQ |
| 1 |
| LS |
| 49 |
| 20301-Removal of sheet piling, concrete, wood, culvert |
| CQ |
| 1 |
| LS |
| 50 |
| 20402-Excavation and Embankment, Conservation of topsoil, Disposal of unsuitable materials |
| CQ |
| 1 |
| LS |
| 51 |
| 30301-Reconditioning of roadbed, compaction A |
| CQ |
| 1 |
| LS |
| 52 |
| 62501-Seeding, dry method (with mulch) |
| CQ |
| 1 |
| LS |
TOTAL QUOTE FOR ALL ITEMS:
Note: CQ = Contract Quantity LS = Lump Sum
Quoter:
By
Telephone No.
(Signature)
FAX No.
Title
*The intent of this contract is for the construction of the proposed projects described in this contract. Unless otherwise specified, the Contractor shall furnish all labor, materials, equipment, tools, transportation; and will perform all work required to complete this project in accordance with the drawings, specifications, and provisions of the contract. Payment for the contract work will be made only for and under those items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for the items shown.