Specs Sched of Items Contract.doc
DOC document 58 KB Posted
- Attached to
- RECOVERY ACT - Abandon Wells Federal contract opportunity
- Solicitation number
- AG-4419-S-10-0454
About this file
Schedule of Items Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PG3.pdf | ||
| Sec L M.doc | DOC document | |
| PG2.pdf | ||
| PG1.pdf | ||
| Clauses.doc | DOC document | |
| PG5.pdf | ||
| PG4.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIM-0900-4F-734-0910-01 REGIONWIDE SOLAR WELLS
SECTION B - SCHEDULE OF ITEMS
WELL ABANDONMENT PROJECT
HIAWATHA NATIONAL FOREST
MICHIGAN
| Item No. |
| Description |
| Method of Measure |
| Pay Unit |
| Estimate of Quantity |
| Unit Price |
| Amount |
| 01 |
| Well Abandonment (Including Mobilization) |
| Unit |
| Each |
| 19 |
| 02 |
| Well capping and drain installation |
| Unit |
| Each |
| 1 |
Total
BASIS OF AWARD
Bidders shall enter an amount for the item. The Government intends to award one contract for the item listed above.
SECTION C
LIST OF DRAWINGS AND SPECIFICATIONS
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. List of Contract Specifications:
SECTION 00860
LIST OF DRAWINGS AND SPECIFICATIONS
DIVISION 1 - GENERAL REQUIREMENTS
SECTION 01010
SUMMARY OF WORK
SECTION 01060
REGULATORY REQUIREMENTS
SECTION 01070
ABBREVIATIONS AND SYMBOLS
SECTION 01560
TEMPORARY CONTROLS
SECTION 01710
FINAL CLEANING
DIVISION 2 – SITE CONSTRUCTION
SECTION 024119
SELECTIVE STRUCTURE DEMOLITION
SECTION 025251
WATER SUPPLY WELL ABANDONMENT
SECTION 01010 - SUMMARY OF WORK
PART 1 GENERAL
1.01 SUMMARY
A. Description of Work:
1. Work Covered by Contract Documents:
This work entails the abandonment of 19 wells and the capping of 1 well. These wells are located throughout the Hiawatha National Forest in Alger, Chippewa, Delta, Mackinac, Marquette, and Schoolcraft Counties, of the Upper Peninsula of Michigan. The exact locations of these wells are identified on the attached maps and spreadsheet. The wells range in size from a 1½ inch sand point to wells with 6 inch steel casings. The depths of these wells range from approximately 22 ft. to 150 ft, this information is captured on the attached spreadsheet. The work also includes capping the flowing well at Peninsula Point which includes the installation of an overflow and drain as shown on attached drawing.
In performance of this work the Contractor shall meet the requirements of the IBC Building Codes and Forest Service Specification, and applicable State and local codes. In case of conflict use the requirement which is more protective.
The Contractor shall work in a clean workmanlike manner.
The Contractor shall take steps to protect the public while in performance of the work.
The Contractor shall clean up the worksite at the end of work each day.
The Contractor shall take care minimize damage to surrounding area during performance of work.
END OF SECTION
SECTION 01060 - REGULATORY REQUIREMENTS
PART 1 GENERAL
1.01 SUMMARY
A. Section includes: Obligations for compliance with specific codes, ordinances, and regulations for this Contract.
1.02 QUALITY ASSURANCE
A. Regulatory Requirements:
1. The latest edition of the following codes, ordinances, and regulations are applicable to this project:
a. IBC.
b. IPC
c. AWWA A100
d. OSHA Safety and Health Standards.
e. ACI 530.1/ASCE 6/ TMS 602
f. When conflicts occur, the more protective code, ordinance, or regulation shall govern.
END OF SECTION
SECTION 01070 - ABBREVIATIONS AND SYMBOLS
PART 1 GENERAL
1.01 SUMMARY
A. Section includes: Abbreviations used in the Contract Specifications.
1.02 REFERENCES
A. Abbreviations:
1. The following abbreviations are used in the Contract Specifications:
ACI
American Concrete Institute
ASCE
American Society of Civil Engineers
ASTM
American Society for Testing and Materials
AWWA
American Water Works Association
CO
Contracting Officer
COR
Contracting Officer's Representative EPA Environmental Protection Agency
ICBO
International Conference of Building Officials
IBC International Building Code by the ICBO
IPC
International Plumbing Code by the ICBO
OSHA
Occupational Safety and Health Administration, United States
Department of Labor
END OF SECTION
SECTION 01560 - TEMPORARY CONTROLS
PART 1 GENERAL
1.01 SUMMARY
A. Section includes: Requirements of temporary controls.
B. Related Sections:
1. SECTION 01710 - FINAL CLEANING.
1.02 QUALITY ASSURANCE
A. Regulatory Requirements:
1. OSHA Safety and Health Standards.
2. EPA Regulations.
3. A copy of the receipt from the landfill shall be provided to the COR for his records.
PART 2 EXECUTION
2.01 PREPARATION
A. Protection
1. The Contractor shall provide, but not limited to, the following temporary controls as necessary during construction at the jobsite:
Construction Cleaning During Construction:
a) Over see cleaning and ensure that grounds are maintained free from accumulations of waste materials, rubbish, and debris from construction operations on a daily basis.
2. Fire Protection: Store volatile waste materials from construction operations in covered metal containers and remove from Government property daily.
2.02 INSTALLATION
A. Disposal:
1. All waste materials, rubbish, and debris resulting from construction operations shall be removed from the site and disposed of in accordance with state and local ordinances.
2. Disposal of volatile fluid waste materials from construction operations (such as mineral spirits, oil, or paint thinner) shall be in accordance OSHA Safety and Health Standards and EPA Regulations.
END OF SECTION
SECTION 01710 - FINAL CLEANING
PART 1 GENERAL
1.01 SUMMARY
A. Section includes: Final cleaning operations.
1.03 SEQUENCING AND SCHEDULING
A. Not Applicable
PART 2 PRODUCTS
2.01 MATERIALS
A. Not Applicable
PART 3 EXECUTION
3.01 PREPARATION
A. Surface Preparation:
1. During Construction: Remove construction debris lying in the area on a daily basis.
2. Broom clean paved surfaces; rake clean other surfaces of grounds.
END OF SECTION
Copyright 2003 and 2005 by The American Institute of Architects (AIA)
Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA
SECTION 024119 - SELECTIVE STRUCTURE DEMOLITION
PART 1 - GENERAL
1.1 SECTION REQUIREMENTS
A. Hand pumps, drop pipes, and other materials Identified by the COR to be removed and salvaged remain Owner's property. Remove, clean, and deliver to Owner's designated storage area.
B. Comply with EPA regulations and hauling and disposal regulations of authorities having jurisdiction.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
3.1 DEMOLITION
A. Provide temporary barricades and other protection as required to prevent injury to public and damage to adjacent facilities and landscape.
B. Use cutting methods least likely to damage structure to remain.
C. Promptly remove demolished materials from Owner's property and legally dispose of them. Do not burn demolished materials.
END OF SECTION 024119
MASTERSPEC Short Form Copyright 1999, The American Institute of Architects (AIA)
SECTION 025251 - WATER SUPPLY WELL ABANDONMENT
PART 4 - GENERAL
4.1 SUMMARY
This Section anticipates the use of allowances for water supply wells. Specify allowances for amounts and quantities in Division 1 Section "Allowances." Make adjustments to allowances based on unit prices after wells with specified capacities are built.
A. This Section includes the following:
Adjust list below to suit Project.
1.
Water supply wells Abandonment.
Insert required capacity below for completed and tested water supply well. The data will be used to determine other variable information such as diameters of bore, casing, and screen, and will affect allowances and unit prices if used.
4.2 DEFINITIONS
See the Evaluations in Division 1 Section "Allowances" for discussion of allowances and how to include them in Project. Coordinate requirements in this Article with Division 1 Section "Allowances."
A. Water Well Abandonment Includes abandoning existing well, appurtenances, including pump, piping, casing to 2’ below ground surface and concrete slab.
Delete first paragraph below if well pump is part of well allowance specified in "Water Supply Well Depth Allowance" Paragraph above.
Unit prices are useful when nature of the Work is well defined but extent or quantity of Work is not known or is likely to change. Provide space on the Bid Form for bidders to propose unit-price amounts. Transcribe unit-price amounts from the Bid Form to the Form of Agreement. Coordinate general measurement and payment requirements in Division 1 Section "Unit Prices." Retain this Article for specific measurement and payment requirements for unit prices for installed water supply wells or for adjustment to quantity allowances.
Coordinate units (e.g., feet or meters) and what is included in units (e.g., water supply well, casing, and grout) stipulated in the Form of Agreement with those described below. Delete grout if rotary or reverse-rotary drilling method is not used.
4.3 SUBMITTALS
A. The Contractor shall provide the following:
1.
Well Abandonment Log.
2.
Abandoned well GPS location to horizontal accuracy of 50’.
3.
Digital picture of abandoned well site, before and after.
See Editing Instruction No. 1 in the Evaluations for cautions about naming manufacturers and products.
Coordinate subparagraphs retained below with subparagraph titles retained in other Part 2 articles. See Division 1 Section "Product Requirements."
Select one of two paragraphs below. Authorities having jurisdiction may require or allow other materials.
Select one of first two paragraphs below. These specialties are designed for use with jet, line-shaft, and submersible pumps. Pitless adapter is installed in casing. Pitless unit replaces a portion of casing.
Retain "Available" in first paragraph below for nonproprietary and delete "Available" for semiproprietary specifications.
For shallow wells, 25 feet (8 m) deep or less, retain subparagraph above. For deep wells, retain subparagraph below.
Delete first subparagraph below if tanks are specified in Division 15 Section "Potable-Water Storage Tanks."
Retain "Water Piping" Subparagraph and associated subparagraph above or below.
Retain "Available" in paragraph below for nonproprietary and delete "Available" for semiproprietary specifications.
Delete paragraph below if no data are available from Owner.
Delete below if no data are available from neighborhood wells.
Retain subparagraph below for steel casings.
Retain subparagraph below for ABS and PVC casings. Do not use ABS pipe for wells deeper than 100 feet (30 m).
Delete first paragraph below if not required.
Retain paragraph below if jet pumps are selected and well is less than 25 feet (8 m) deep.
Retain paragraph below if jet pumps are required and well is between 25 and 100 feet (8 and 30 m) deep.
Retain first paragraph and subparagraphs below if line-shaft- or submersible-type well pumps are selected.
Retain below for submersible-type well pumps.
4.4 WELL ABANDONMENT
A. Comply with AWWA A100 when abandoning water supply wells. Fill and seal holes and casings, remove casing to 24” below ground level, remove any items in the well, any well slab, and restore ground surface to finished grade.
Retain paragraph above or below.
B. Follow well-abandonment regulation of the EPA and the State Agency responsible. Restore ground surface to finished grade.
PART 5 - PRODUCTS (Not Applicable)
See Editing Instruction No. 1 in the Evaluations for cautions about naming manufacturers and products.
Coordinate subparagraphs retained below with subparagraph titles retained in other Part 2 articles. See Division 1 Section "Product Requirements."
Select one of two paragraphs below. Authorities having jurisdiction may require or allow other materials.
Select one of first two paragraphs below. These specialties are designed for use with jet, line-shaft, and submersible pumps. Pitless adapter is installed in casing. Pitless unit replaces a portion of casing.
Submersible pump below may be used for any depth.
Retain subparagraph above or subparagraph and associated subparagraph below.
Retain three subparagraphs below with paragraph above.
Retain "Available" in first paragraph below for nonproprietary and delete "Available" for semiproprietary specifications.
For shallow wells, 25 feet (8 m) deep or less, retain subparagraph above. For deep wells, retain subparagraph below.
Delete first subparagraph below if tanks are specified in Division 15 Section "Potable-Water Storage Tanks."
Retain "Water Piping" Subparagraph and associated subparagraph above or below.
Retain "Available" in paragraph below for nonproprietary and delete "Available" for semiproprietary specifications.
Submersible pump below may be used for any depth.
Retain subparagraph above or subparagraph and associated subparagraph below.
PART 6 - EXECUTION
6.1 PREPARATION
Delete paragraph below if no data are available from Owner.
Delete below if no data are available from neighborhood wells.
A. Well Data, Location, depth and size of casing and well contents:
1. See Attached spreadsheet for well data, location, known depth and size of casings.
2. See Attached maps for locations of wells.
Retain subparagraph below for steel casings.
Retain subparagraph below for ABS and PVC casings. Do not use ABS pipe for wells deeper than 100 feet (30 m).
Delete first paragraph below if not required.
Retain paragraph below if jet pumps are selected and well is less than 25 feet (8 m) deep.
Retain paragraph below if jet pumps are required and well is between 25 and 100 feet (8 and 30 m) deep.
Retain first paragraph and subparagraphs below if line-shaft- or submersible-type well pumps are selected.
Retain below for submersible-type well pumps.
Coordinate piping installations and specialty arrangements with schematics on Drawings and with requirements specified in Division 2 Section "Water Distribution." If Drawings are explicit enough, these requirements may be reduced or omitted.
If no well house is required, retain subparagraph below and select one of two options.
If well house is required, retain subparagraph below.
Retain paragraph above or below.
Revise test procedures in this Article to suit Project.
Revise maximum time intervals and minimum duration of pumping tests in first subparagraph below to suit Project.
Retain paragraph above or below. Retain below to suit requirements of authorities having jurisdiction.
Revise or delete below to suit Project.
6.2 ABANDONMENT
A. Abandon well as per AWWA100 as per State and EPA requirements.
B. Remove and dispose of any appurtenances in the well.
C. Remove and dispose of well slab, if present.
D. Remove and dispose of well casing to a minimum of 2’ below ground surface.
E. Dispose of all materials at a recycling center or a legal land fill.
Retain first paragraph below only if rotary drilling method is selected.
F. Furnish well abandonment log, GPS location of abandonment and a digital picture of the abandoned well site.
END OF SECTION 025251