- RECOVERY ACT - Abandon Wells Federal contract opportunity
- Solicitation number
- AG-4419-S-10-0454
About this file
Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sec L M.doc | DOC document | |
| PG2.pdf | ||
| Clauses.doc | DOC document | |
| PG5.pdf | ||
| PG4.pdf | ||
| PG3.pdf | ||
| Specs Sched of Items Contract.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIM-0900-4F-734-0910-01 REGIONWIDE SOLAR WELLS
Well Name Location Size Casing (IN) Depth Ft. Remarks
Rapid River District Delta County
BDNGI Trail South Well 1 T41NR21W SEC 22 5" 29' Well farthest from CO RD 509 on FR 8261
NW 1/4 of SE 1/4 5'x5' concrete slab. Hand pump attached
Pollack Lake Well 2 T43NR19W SEC 20 5" 134' Old CCC camp off CO RD 442, east of
NE 1/4 of NE 1/4 Johnson Creek. No slab capped.
Rapid River District Schoolcraft County
Colwell Lake CG Well 3 T44NR17W Sec 9 5" 63' Well near site 31. Concrete slab
SE 1/4 of SW 1/4 hand pump attached
Little Bass Lake CG Well 4 T44NR17W Sec 33 5" 81' Near Site 4, concrete slab
NE 1/4 OF SE/1/4 hand pump attached
Skeels Well 5 T44NR19W Sec 36 6" <100 In a small opening at the end
SE 1/4 OF SW 1/4 of 2 rut road M101B
Munising District Alger County
Trout Bay Beach Well 6 T47NR19W Sec 12 1 1/2" 25' Sand Point access to within 150'.
SW 1/4 OF SW 1/4 FS could supply alternate transportion if required
Bay Furnace Well 7 T47NR19W Sec 29 2" 22' Near Lake Superior in picnic area
SW 1/4 OF NW 1/4
Autrain CG Well 8 T46NR20W Sec 8 5" 60' Near site 32, w/concrete slab
SW 1/4 OF SW 1/4 hand pump attached
Dukes Well 9 T46NR23W Sec 25 4" <100 In old foundation cut casing flush
SE 1/4 OF SW 1/4
CIM-0900-4F-734-0910-01__REGIONWIDE SOLAR WELLS
Vally Spur Well 10 T45NR19W Sec 20 2" 24.5' Sand point near Valley Spur Cabin
SE 1/4 OF SW 1/4 hand pump w/slab
Island Lake Well 11 T45NR19W Sec 26 4" 50' Well near site 38 with concrete slab
NE 1/4 OF NW 1/4 hand pump attached
Island Lake Well 12 T45NR19W Sec 26 4" 69' Well near site 25 concrete slab
NE 1/4 OF NW 1/4 hand pump attached
St. Ignace District Mackinac County
Pontchartrain Well 13 T4202 SEC 20 2" <100' There is a 2" lead pipe extruding from
SW 1/4 OF SW 1/4 the structural debris within the foundation
Pontchartrain Well 14 T42NR02W Sec 20 6" <100' Well is a 6" rusted pipe with a
SW 1/4 OF SW 1/4 smaller galvanized pipe in the northeast corner.
Sault Ste Marie District Chippewa County
Monocole Lake Well 15 T47NR3RW Sec 14 5" 35' Near Site 23 w/ concrete slab
SW 1/4 OF NE 1/4 hand pump attached
3 Raco Work Center Wells 16,17,18 T46NR4W Sec 13 2" <100 Test wells at old sewage treatment
SE 1/4 OF SW 1/4 facility that was demolished in 2009
Brimley Well 19 T47NR3W Sec 36 2" <100' Just south of 3153
Pine River Well 20 T44NR5W Sec 12 5" 31' In old campground near
NE 1/4 OF NW 1/4 North Country Trail
If slab is present remove
Capped Wells
Peninsula Pt Lighthouse Well 21 T38NR22W Sec 24 5" 850' Flowing well with handpump attached to be capped and over flow and drain installed
Recommended Proposal Submission (Section L)
The Contractor shall submit the following items with the contractor’s Proposal.
1) At least two references of where the contractor similar type work.
2) A list of similar projects the contractor has performed over the last 5 years.
3) Credentials, is the Contractor a Licensed Master Plumber or Well Driller.
Recommended Evaluation Criteria (Section M)
The contractor’s proposal will be evaluated based on the following Criteria, listed in order of importance.
1) Price.
2) Experience of contractor performing similar work
3) Methodology and materials.
PART I THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS
WILLIAMS LANDING, G.I.
VISITOR CENTER
RESTORATION PROJECT
OFFERORS PLEASE NOTE:
A. Before preparing your offer, please carefully review Section L - Instructions, Condition and Notices to Offerors, and Section M – Recommended Evaluation Criteria.
B. The contractor shall provide all labor, material, equipment, and supervision to perform all work in accordance with the contract requirements.
Pay Estimated Unit Item No, Description Unit Quantity Price Total
1 Perform all work
In accordance with Contract Requirements LS 1 $________
WELL ABANDONMENT PROJECT
Engineering Estimate
Well abandonments:
Average Mobilization = 450.00
Average Abandonment Cost = 1,500.00
Cost Per Abandonment 1,950.00
X 19
37,050.00
Peninsula Point Well Capping and Draining
Mobilization = 450.00
Capping = 1,000.00
Drain = 1,500.00
Total 2,950.00
Total Cost:
Well Abandonment = 37,050.00
Peninsula Point Well = 2,950.00
Total = 40,000.00
Recommended Proposal Submission (Section L)
The Contractor shall submit the following items with the contractor’s Proposal.
1) At least two references of where the contractor similar type work.
2) A list of similar projects the contractor has performed over the last 5 years.
3) Credentials, is the Contractor a Licensed Master Plumber or Well Driller.
Recommended Evaluation Criteria (Section M)
The contractor’s proposal will be evaluated based on the following Criteria, listed in order of importance.
1) Price.
2) Experience of contractor performing similar work
3) Methodology and materials.