Big Branch Bridge Reconst_Supplemental Specs.docx
DOCX document 71 KB Posted
- Attached to
- Recovery - Big Branch Bridge Reconstruction Federal contract opportunity
- Solicitation number
- AG-4419-S-10-0406
About this file
Supplemental Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 1 Page 1SF-30.pdf | ||
| Amendment 1 page 2x.pdf | ||
| Big Branch Bridge Reconst_Plans.pdf | ||
| AG-4419-S-10-0406 F .rtf | RTF text file | |
| SF-1442.doc | DOC document | |
| Past Performance Form.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Supplemental Specifications December 2009
SECTION C – FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS
The U.S. Department of Transportation, Federal Highway Administration, Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03, U.S. Customary Units and its revisions are included by reference only. Also applicable, but not listed, is any other section or subsection of the included Specification(s) or any specific standard or specification referenced therein. The requirements contained in these specifications are hereby made a part of this Solicitation for Bid and any resulting contract.
A copy of the U.S. Department of Transportation, Federal Highway Administration, Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03, U.S. Customary Units can be obtained at the following locations:
Superintendent of Documents U.S. Government Printing Office Internet: bookstore.gpo.gov Phone: (toll free) 866.512.1800 Fax: 202.512.2250 Mail: Stop SSOP, Washington, DC 20402-0001
They can also be downloaded directly at the following website:
http://www.wfl.fha.dot.gov/design/specs/fp03.htm
The following Forest Service Supplemental Specifications are revisions to the Standard Specifications that incorporate specification changes or additions that are specific requirements and unique to this particular project. The specifications are herein modified as follows:
SPECIAL PROJECT GUIDELINES FOR WORKING IN WILDERNESS
Legal Background – 1964 Wilderness Act
DEFINITION OF WILDERNESS
“(c) A wilderness, in contrast with those areas where man and his own works dominate the landscape, is hereby recognized as an area where the earth and its community of life are untrammeled by man, where man himself is a visitor who does not remain. An area of wilderness is further defined to mean in this Act an area of undeveloped Federal land retaining its primeval character and influence, without permanent improvements or human habitation, which is protected and managed so as to preserve its natural conditions and which (1) generally appears to have been affected primarily by the forces of nature, with the imprint of man’s work substantially unnoticeable; (2) has outstanding opportunities for solitude or a primitive and unconfined type of recreation; ….”
PROHIBITION OF CERTAIN USES
(c) Except as specifically provided for in this Act, and subject to existing private rights, there shall be no commercial enterprise and no permanent road within any wilderness area designated by this Act and, except as necessary to meet minimum requirements for the administration of the area for the purpose of this Act (including measures required in emergencies involving the health and safety of persons within the area), there shall be no temporary road, no use of motor vehicles, motorized equipment or motorboats, no landing of aircraft, no other form of mechanical transport, and no structure or installation within any such area.
Minimum Requirements Decision Guide (MRDG) for Big Branch Bridge
Through the MRDG process, it was determined that in order to meet the minimum requirements for the administration of the area in the Big Branch Wilderness on the Appalachian Trail/Long Trail that the use of a helicopter for transporting building materials will be allowed for this project.
As specified in the Wilderness Act, other forms of motorized equipment and mechanical equipment will not be allowed. For example -- power tools, generators, chainsaws, wheel barrels, and compressors.
However, small battery powered tools such as cell phones, radios, and rechargeable drills will be allowed. Specific questions regarding what is and is not allowed in the Big Branch Wilderness on the Big Branch Bridge project should be directed to the Contracting Officer.
Table of Contents
| Cover Sheet | 1 | |
| Special Project Guidelines For Working in Wilderness | 2 | |
| Table of Contents | 3 | |
| Preface | 5 | |
| 101 - Terms, Format, and Definitions | 5 | |
| 101.01 Meaning of Terms | 5 | |
| 101.03 Abbreviations. | 5 | |
| 101.04 Definitions. | 5 | |
| 102 - Bid, Award, and Execution of Contract | 8 | |
| 102 Bid, Award, and Execution of Contract | 8 | |
| 103 - Scope of Work | 8 | |
| Deletions | 8 | |
| 104 - Control of Work | 8 | |
| Deletions | 8 | |
| 104.06 Use of Roads by Contractor | 8 | |
| 105 - Control of Material | 9 | |
| 105.02 Material Sources. | 9 | |
| 105.02(a) Government-provided sources. | 9 | |
| 105.05 Use of Material Found in the Work. | 9 | |
| 106 - Acceptance of Work | 9 | |
| 106.07 Delete | 9 | |
| 107 - Legal Relations and Responsibility to the Public | 10 | |
| 107.05 Responsibility for Damage Claims. | 10 | |
| 107.06 Contractor’s Responsibility for Work. | 10 | |
| 107.09 Legal Relationship of the Parties. | 10 | |
| 107.10 Environmental Protection. | 10 | |
| 108 - Prosecution and Progress | 11 | |
| 108 Delete. | 11 | |
| 109 - Measurement and Payment | 11 | |
| 109 Deletions | 11 | |
| 109.02 Measurement Terms and Definitions. | 11 | |
| 155 - Schedules for Construction Contracts | 12 | |
| 155 Delete. | 12 | |
| 555 - Steel Structures | 12 | |
| 556 - Bridge Railing | 12 | |
| 717 - Structural Metal | 13 | |
| 717.01 | Structural Steel | 13 |
| 718 - Traffic Signing and Marking Material | 14 | |
| 718.05 Aluminum Panels | 14 |
Preface Preface_wo_03_15_2004_m Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005
101.01_nat_us_01_22_2009
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_nat_us_06_16_2006
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
| mp |
| Milepost |
| ppm |
| Part Per Million |
101.04_nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005 102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work 103.00_nat_us_02_16_2005 Deletions
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work 104.00_nat_us_06_16_2006 Deletions
Delete Sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005 Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material 105.02_nat_us_01_18_2007
105.02 Material Sources.
105.02(a) Government-provided sources.
Add the following:
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work 106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10_nat_us_06_16_2006
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
· Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
· Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
· Exact time and location of spill including a description of the area involved.
· Containment procedures.
· Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
· Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress 108.00_nat_us_02_16_2005 108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment 109.00_nat_us_02_17_2005 109 Deletions Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_06_16_2006
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004 155 Delete.
Delete Section 155 in its entirety.
555 - Steel Structures 555.18_nat_us_07_03_2007 Construction Requirements
0. Welding.
Add the following at the start of the first sentence.
"Unless otherwise provided for in the supplemental specifications or shown on the plans, ... " 556 - Bridge Railing 556.01_nat_us_07_03_2007 Description
556.01
Add the following:
Prior to acceptance of the completed structure, clean the bridge and approach rail of all foreign matter, including dirt, cement paste and petroleum products, leaving these surfaces in the same condition as when they left the fabricator. Use hand tool, solvent and blast cleaning as required but use power tool cleaning only as approved.
Material.
556.02
Add the following:
| Galvanized coating repair | 717.07 |
| Structural steel tubing | 717.01(h) |
0. Steel Railing.
Add the following at the beginning of the first sentence.
"Except as provided for in the supplemental specifications or shown on the plans, ... "
Add the following:
For galvanized rail, galvanize in accordance with AASHTO M111, and furnish nuts, bolts, and washers galvanized in accordance with AASHTO M 232. Repair minor abrasions, cuts and all damaged areas with a galvanized coating in accordance with 717.07.
717 - Structural Metal 717.01_nat_us_08_05_2009
717.01 Structural Steel
(e) High-Strength Bolts, Nuts, & Washers.
Delete the first paragraph and replace with the following:
Conform to either AASHTO M164 or AASHTO M253, as specified. Use Type 3 bolts in combination with unpainted weathering structure steel. Conform to AASHTO M293 (ASTM F 436) for hardened steel washers.
Add the following subsections:
(f) Load-Indicating Washers.
Furnish load-indicating washers (Compressible-washer-type DTI's) conforming to ASTM F 959, Type 8.8 or 10.9. Use Type 8.8 with AASHTO M 164 bolts and with ASTM F 568, Class 8.8 tie rods; use Type 10.9 with AASHTO M 253 bolts. When galvanizing is shown on the plans, furnish DTI's mechanically galvanized to conform to AASHTO M 298, Class 50, Type I. When used with other components that are weathering steel or are to be coated the color of weathering steel, furnish DTI's protectively coated with baked epoxy in a black color.
(g) Steel Anchor Bolts.
Furnish steel anchor bolts of the dimensions shown on the plans. Furnish steel anchor bolts that conform to AASHTO M314, Grade 40 unless otherwise shown on the plans. Ensure that the exposed portion of the bolt is zinc coated by hot dip or mechanical deposition.
(h) Structural Steel Tubing.
Furnish structural steel tubing that conforms to ASTM A500, grade B or ASTM A501 unless otherwise shown on the plans.
717.07 Galvanized Coatings
Add the following:
Furnish hot-dipped galvanized hardware and fasteners conforming to AASHTO M 232 and mechanically galvanized hardware and fasteners conforming to AASHTO M 298.
Repair damaged galvanized surfaces by power or hand tool cleaning, followed by 2 brush applications of zinc rich 2 component paint meeting FS TT-P-641, FS TT-P-1046A or MIL-P-21035. Single component brush or spray-on zinc or galvanizing compounds are not permitted. A source for TT-P-641 paint is Far West Paint Company, Tukwila, WA 206-244-8844.
718 - Traffic Signing and Marking Material 718.05_nat_us_08_05_2009
718.05 Aluminum Panels
Delete the third paragraph and replace with the following:
Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.
| NPS-0920-01 | GMNF Appalachian National Scenic Trail | |
| Big Branch Trail Bridge Reconst. | Page 1 of 14 | Reconst. A 100-ft Suspension Bridge |
image1.png
File details come from the government source that posted it. Updated .