Amendment 1 page 2x.pdf

PDF 47 KB Posted

Attached to
Recovery - Big Branch Bridge Reconstruction Federal contract opportunity
Solicitation number
AG-4419-S-10-0406
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center East

About this file

Amendment 1 page 2 of 2

View the file

Other files for this federal contract opportunity

Other files attached to Recovery - Big Branch Bridge Reconstruction, newest first.
File Type Posted
Amendment 1 Page 1SF-30.pdf PDF
Big Branch Bridge Reconst_Plans.pdf PDF
AG-4419-S-10-0406 F .rtf RTF text file
SF-1442.doc DOC document
Big Branch Bridge Reconst_Supplemental Specs.docx DOCX document
Past Performance Form.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment No. 1, page 2

Solicitation No.: AG-4419-S-10-0406 Big Branch Bridge Reconstruction

Item 1 Continued:

However, all manner of non-motorized hand tools such as hammers, shovels, grip hoists, wheel barrows, etc. will be allowed. Battery powered hand tools will be allowed only for drilling / cutting into metal and concrete that cannot be completed off-site. A pneumatic hand drill and compressor will be allowed only for drilling 4 foot holes in the existing concrete main cable anchorages.

2. As a clarification to General Note No. 2 on Sheet 2 of 6 of the Project Plans, a helicopter is NOT being provided by the Forest Service. The Forest Service will allow helicopter access into the Green Mountain

National Forest Congressionally Designated Wilderness Area where the project site is located, but is not providing the helicopter service itself. This will be provided by the Offeror and coordinated through the

Forest Service COR. Payment for demolition, removal and disposal of the existing bridge superstructure and helicopter transport of old and new bridge components shall be paid for under Item No. 15101

Mobilization.

3. Upon request from the Offeror, the Forest Service may provide a material lay-down area for Offeror helicopter airlifts / drops at the Forest’s Mt. Tabor Work Center just off VT Route 7 in Mt. Tabor

Vermont. The Forest Service will provide a material lay-down area for Offeror helicopter airlifts / drops at a location near the Appalachian Trail approximately 300-500 feet north of the bridge site.

4. The bridge site will be closed to hikers during construction and no alternate crossing will be available to them near the bridge site. Camping by the Offeror’s crew performing the bridge site work will be allowed at the bridge site material lay-down area or as designated by the Forest Service COR, and will be according to USDA Forest Service regulations and Leave No Trace Wilderness Guidelines. The trail to the bridge site is not suitable for pack animal transport of materials and equipment and will NOT be used for this purpose.