Amendment No. 1 page 2x.pdf
PDF 40 KB Posted
- Attached to
- Recovery-Culvert Reconstruction Federal contract opportunity
- Solicitation number
- AG-4419-S-10-0365
About this file
Amendment 1 page 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 1 page 1 sf-30.pdf | ||
| Past Perf Questionnarie PDF.pdf | ||
| Specifications Culvert Reconstruction PDF.pdf | ||
| Specifications Culvert Reconstruction.docx | DOCX document | |
| EXPERIENCE AND PAST PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| Project Plans.pdf | ||
| Final AG-4419-S-10-0365 1 .pdf | ||
| SF-1442 0365.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. AG-4419-S-10-0365
RECOVERY PROJECT – CULVERT RECONSTRUCTION
GREEN MOUNTAIN FINGER LAKES NATIONAL FOREST
AMENDMENT NO. 1, PAGE 2
Q: Can the strip footing wall be cast in multiple concrete pours?
A: Yes, the wall can be poured in multiple pours with a recommended maximum length of pour of 30 feet. Reinforcing steel shall be continuous through each pour section.
Q: Are guardrail anchor required?
A: Yes, guard rail anchors are required at all four ends of the guardrail.
The anchor shall be in accordance with VTrans Standard detail G-1d and be paid for incidental to item 61701, "Guardrail System (Weathering Steel)".
Q: How is the erosion and sediment control plan paid for?
A: The erosion and sediment control plan shall be paid for incidental to item 15713, "Soil Erosion and Pollution Control".
The closing date for receipt of proposals remains as March 10, 2010, 2:00 p.m.
eastern time. The address for mailing proposals is: USDA FS, NEAT, Attn: Teresa
Corse, 4 Farm Colony Drive, Warren, PA 16365