About this file

SF 1442

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY: Design/Build to Replace Three Drainage Structures, Chippewa NF, newest first.
File Type Posted
04-CIM_2423_02W_NRS_0903_01_Rev1SPECS.pdf PDF
1442 Cont_0345.pdf PDF
CIM-2423-02W-NRS-0903-01 DWGS.pdf PDF
DBA_WD.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

358955

US FOREST SERVICE

EROC EAST

1720 PEACHTREE ROAD NW

ATLANTA GA 30309

US FOREST SERVICE

ATTN: D.E. HILL

1720 PEACHTREE ST. NW. STE. 700

ATLANTA, GA. 30309

DWIGHT HILL 404-347-3847

1x 02/17/2010

AG-4419-S-10-0345

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

TAS::12 1102::TAS AAP#: CIM-2423-02W-NRS-0903-01 RECOVERY FUNDS

Experimental Forest Road-Related Ecosystem Enhancements.This project involves the replacement of three structures on the Eagle Nest Road, National Forest System Road

(NFSR) 2198, on the Chippewa National Forest. One bridge will be replaced with a new bridge, one culvert will be replaced with a new bridge, and one culvert will be replaced with a new culvert. Both bridges will be the same design using the same materials.

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 90 calendar days and complete it within ________________ ________________ calendar days after receiving

04/05/2010

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

US FOREST SERVICE

EROC EAST

1720 PEACHTREE ROAD NW

ATLANTA GA 30309

BRUCE M. BLACKBURN

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

AG-4419-S-10-0345

TAS::12 1102::TAS *RECOVERY* AAP#:

CIM-2423-02W-NRS-0903-01 RECOVERY FUNDS

Experimental Forest Road-Related Ecosystem

Enhancements.

Delivery: 90 Days After Notice to Proceed

Delivery Location Code: 6392

CHIPPEWA NATIONAL FOREST

200 ASH AVENUE

CASS LAKE MN 56633 US

FOB: Destination

001 TAS::12 1102::TAS *RECOVERY* 001 Driven Piling -

Furnish, Deliver and Install

Product/Service Code: Y222

Product/Service Description:

CONSTRUCT/HIGHWAYS-RDS-STS-BRDGS-RA

002 TAS::12 1102::TAS *RECOVERY* 002 Prefabricated bridge superstructure and substructure - Complete design including Geotechnical investigation (for both bridges).

Product/Service Code: Y222

Product/Service Description:

CONSTRUCT/HIGHWAYS-RDS-STS-BRDGS-RA

003 TAS::12 1102::TAS *RECOVERY* 003 Prefabricated bridge superstructure and substructure -fabricate, deliver and install.

Product/Service Code: Y222

Product/Service Description:

CONSTRUCT/HIGHWAYS-RDS-STS-BRDGS-RA

004 TAS::12 1102::TAS *RECOVERY* 004 84 inch pipe culvert, 70 feet long.

Product/Service Code: Y222

Product/Service Description:

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

4 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

AG-4419-S-10-0345

CONSTRUCT/HIGHWAYS-RDS-STS-BRDGS-RA

005 TAS::12 1102::TAS *RECOVERY* 005 State of

Minnesota asphalt concrete pavement, LVWE25030B

336 feet at each bridge site.

Product/Service Code: Y222

Product/Service Description:

CONSTRUCT/HIGHWAYS-RDS-STS-BRDGS-RA

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .