CIM-2423-02W-NRS-0903-01 DWGS.pdf

PDF 2 MB Posted

Attached to
RECOVERY: Design/Build to Replace Three Drainage Structures, Chippewa NF Federal contract opportunity
Solicitation number
AG-4419-S-10-0345
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center East

About this file

Drawings

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY: Design/Build to Replace Three Drainage Structures, Chippewa NF, newest first.
File Type Posted
04-CIM_2423_02W_NRS_0903_01_Rev1SPECS.pdf PDF
1442 Cont_0345.pdf PDF
SF 1442.pdf PDF
DBA_WD.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .