Pit Report
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Experience_Capability Statement.doc | DOC document | |
| construction_details.pdf | ||
| kef.pdf | ||
| SF 1442 Cont_0076.pdf | ||
| FS ARRA SIGN DETAILS.pdf | ||
| DBA_WD.pdf | ||
| FR123_and_FR294_culvert_details.pdf | ||
| turnout_details.pdf | ||
| riprap_outlet_detail.pdf | ||
| Pit-Plan.pdf | ||
| SF 1442 cvr pgs.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1/3
Pit: FR 459
Marienville Ranger District Date: 06/15/2009
Jones Township, Elk County
Management Area 3.0, Warrant 3220
Brush Hollow Salvage Project - Pit Development Plan
The current pit size is 2.0 acres. This is an inactive pit that is partially reclaimed and vegetated.
The 2008 Brush Hollow NEPA decision permits a 2.0 acre pit expansion. The proposed
Brush Hollow excavation area will be 1.5 acres and the remaining 0.5 acre area will be used for future projects. Based on test data, the proposed 1.5 expansion area should yield approximately 18,000 cy of good material at a 7.5 foot excavation depth.
A. Initial Pit Development:
1. The proposed excavation area is depicted on the plan map and shall be field delineated with two-stripe flagging tape by a Forest Service representative. All excavation activity shall take place within the existing clearing limits and the proposed excavation area.
2. Operations shall begin with tree removal within the proposed excavation area followed by clearing and grubbing.
3. Excavation shall begin in the eastern side of the pit and progress in same direction.
4. As excavation progresses, overburden shall be removed and stockpiled in a designated area or as directed by a Forest Service representative.
B. Operational Requirements and Constraints:
1. Overburden, logs, stumps, or oversized material that is encountered will be stockpiled in a designated area or as directed by a Forest Service representative.
2. Do not stockpile overburden beyond the designated excavation area or at the base of any standing trees.
3. Only one face is to be open and worked at any given time during operations.
4. Do not undermine the roots of boundary trees during development work.
5. Maintain a 10 foot buffer distance between boundary trees and excavation.
6. No disposed equipment, trash, vehicles, pipe, or miscellaneous supplies are to be stored in the pit or the surrounding area.
7. Subsequent changes in this pit development plan due to efficiency, logistics, or unforeseen circumstances may be permitted only with the written approval from a designated Forest Service representative.
C. Timber and Resource Utilization:
1. Large boulders encountered during the excavation process shall be stockpiled in a location designated by the Forest Service representative.
2. Slash will be scattered outside the proposed clearing limits of the roads and pit.
CIM-0919-8R-413-0919-02
(ANF DEFERRED ROAD MTCE & WATERSHED HEALTH II – FR 123)
CIM-2423-01R-NRS-0919-01
(KANE EXPERIMENTAL FOREST ROAD MTCE AND IMPROVEMENT – FR294)
2/3
3. Stumps will be stockpiled in a location designated by a Forest Service representative and set upright for use in future reclamation work.
4. Timber will not be cut or pushed over unless it is marked and tallied by the
Forest Service.
5. Timber stored within the pit area shall not be damaged or buried and decked in a location designated by the Forest Service.
D. Short Term Pit Reclamation:
1. As each open face is depleted or closed, that area will be reclaimed promptly to a slope of (1.5 : 1) or flatter, using the designated overburden stock pile material.
2. The sloped/reclaimed area will then be promptly seeded, fertilized, and mulched using a non-exotic seed mixture designated by the Forest Service.
3. Seed and mulch during favorable weather conditions or as directed by a Forest
Service representative.
4. Depending on the location and safety issues, the Forest Service may request to leave one face open after material excavation has ceased.
E. Forest Road and Trail Access:
1. The contractor shall monitor the condition of all Forest Service roads or trails used for stone haul during the development process. If rutting, potholes deeper than 3 inches, crushing or blocking of culverts occurs, the contractor must cease all hauling operations and immediately notify a Forest Service representative or the Forest District Ranger for assessment of damage and necessary repairs needed.
2. After the development work is complete the contractor is required to restore all access roads to the previous condition.
CIM-0919-8R-413-0919-02
(ANF DEFERRED ROAD MTCE & WATERSHED HEALTH II – FR 123)
3/3
Pit Exploration: 12/20/07 Backhoe: Deere Turbo4X4 310SE with 2.0’ bucket supplied by C & M Crew
FS administrator on site: Vincent Barandino
Exploration holes were gps’d and marked with pink ribbon on trees
Master copy of the GPS files, pit plan and pictures for this project:
\\j:Drive\fsfiles\office\7700_transportation\Pits\Pit_COR\Pits Vincent\FR459
Exploration summary data
Hole # 1 (along the face of the pit)
Overburden: 0 (No Overburden)
Sandstone Depth: 0.0’- 9.0’ hit bedrock
Sandstone Quality: TSL D road- good
Rating: 7.5
Hole # 2
Overburden: 0-1.5’
Sandstone Depth: 1.5’- 9.0’ bedrock not reach
Hole # 3
Overburden: 0-1.0’
Sandstone Depth: 1.0’- 8.0’ bedrock not reach
Hole # 4
Overburden: 0’-1.5’
Sandstone Depth: 1.5’- 8.5’ bedrock not reach
Rating: 7.0
Hole # 5
Overburden: 0’-1.0’
Sandstone Depth: 1.0’- 8.0’ bedrock not reach
CIM-0919-8R-413-0919-02
(ANF DEFERRED ROAD MTCE & WATERSHED HEALTH II – FR 123)