FS ARRA SIGN DETAILS.pdf

PDF 1 MB Posted

Attached to
RECOVERY: Road Maintenance Federal contract opportunity
Solicitation number
AG-4419-S-09-0076
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center East

About this file

ARRA Signage

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY: Road Maintenance, newest first.
File Type Posted
DBA_WD.pdf PDF
FR123_and_FR294_culvert_details.pdf PDF
turnout_details.pdf PDF
Experience_Capability Statement.doc DOC document
construction_details.pdf PDF
Pit-report.pdf PDF
kef.pdf PDF
SF 1442 Cont_0076.pdf PDF
riprap_outlet_detail.pdf PDF
Pit-Plan.pdf PDF
SF 1442 cvr pgs.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4/2/2009

PROJECT FUNDING SOURCE SIGN ASSEMBLY

AMERICAN RECOVERY AND REINVESTMENT ACT

SIGN LAYOUT DETAILS

for use on

USFS PROJECTS

PROJECT FUNDING SOURCE

SIGN ASSEMBLY

CIM-0919-8R-413-0919-02

(ANF DEFERRED ROAD MTCE & WATERSHED HEALTH II – FR 123)

CIM-2423-01R-NRS-0919-01

(KANE EXPERIMENTAL FOREST ROAD MTCE AND IMPROVEMENT – FR294)

Project Funding Source Sign Assembly American Recovery And Reinvestment Act

Sign Layout Details USFS Projects

FOR USE ON HIGH SPEED ROADS

PROJECT FUNDING SOURCE SIGN

OTE: SIGN SHALL NOT BE INSTALLED WITHOUT PROJECT FUNDING SOURCE PLAQUE (SEE SHEET 3).

N

A B C D E F G H J K L M N P

120 72 1.5 3.75 6 5 D 4.5 8 D* 6D*(4.5 L.C.) NA NA 27.917 5 10.831

84 54 1 5 4 C 3.5 6 C* 3 4 D*(3 L.C.) NA NA 19.047 4 7.362

C Q R S T U V W X Y Z AA BB C DD

14.087 8.106 11.556 49.42 2.742 5.258 46.904 6.812 46.76 22.472 8 16.288 4 21

9.484 5.162 7.763 31.722 2.415 3.585 30.552 4.542 30.911 14.737 6 10.175 3 15

*** See Pictograph page 7

BACKGROUND — GREEN (RETROREFLECTIVE)

G * Increase character spacing 50% ** See Pictograph page 6

EE FF G

8 3 3

COLORS: LEGEND, BORDER — WHITE (RETROREFLECTIVE)

6 2.25 2.25

CIM-0919-8R-413-0919-02

(ANF DEFERRED ROAD MTCE & WATERSHED HEALTH II – FR 123)

American Recovery And Reinvestment Act

Sign Layout Details

FOR USE ON HIGH SPEED ROADS

PROJECT FUNDING SOURCE PLAQUE

NOTE: SIGN SHALL NOT BE INSTALLED * See Standard Highway Signs WITHOUT SIGN (SEE SHEET 2). Page 6-59 for symbol design

120 24 0.625 0.875 4 6 D 22.349 20.370 17.281 13.28 6 34.22 6.5 8.765

84 18 0.375 0.625 3.5 4 D 16.607 15.686 9.707 10.667 4 22.813 5 5.843

Q R S T U V W X Y Z

21.013 3 24 0.375 0.625 1.5 11 8 1.5 12

14.009 2.25 18 0.375 0.625 1 7 6 1.5 9

COLORS: LEGEND, BORDER — BLACK

BACKGROUND — ORANGE (RETROREFLECTIVE)

American Recovery And Reinvestment Act

Sign Layout Details

FOR USE ON LOW SPEED ROADS OR NON-ROAD PROJECTS

PROJECT FUNDING SOURCE SIGN

OTE: SIGN SHALL NOT BE INSTALLED WITHOUT PROJECT FUNDING SOURCE PLAQUE (SEE SHEET 5).

N

60 36 0.75 3 3 C 2.25 4 C 1 1 .625 3 C* NA NA 4.393 3 5.416

42 27 0.5 2.5 2 C 1.75 3 C 1.5 2 C* NA NA 9.60 2 3.681

C Q R S T U V W X Y Z AA BB C DD

7.044 4.02 5.78 24.71 1.371 2.629 23.452 3.406 23.38 11.236 4 8.144 2 10

4.742 2.68 3.85 15.861 1.207 1.792 15.276 2.271 15.455 7.369 3 5.0875 1.5 7

*** See Pictograph page 7

BACKGROUND — GREEN (RETROREFLECTIVE)

* Increase character spacing 50% ** See Pictograph page 6

EE FF GG

4 1.5 1.5

COLORS: LEGEND, BORDER — WHITE (RETROREFLECTIVE)

3 1.125 1.125

American Recovery And Reinvestment Act

Sign Layout Details

FOR USE ON LOW SPEED ROADS OR NON-ROAD PROJECTS

PROJECT FUNDING SOURCE PLAQUE

ALLED *

ITHOUT SIGN (SEE SHEET 4). Page 6-59 for symbol design

NOTE: SIGN SHALL NOT BE INST See Standard Highway Signs W

60 12 0.312 0.437 2 3 C 11.174 10.185 8.640 6.64 3 17.11 3.25 4.3825

42 9 0.187 0.312 1.67 2 C 8.303 7.843 4.853 5.334 2 11.406 2.5 2.922

Q R S T U V W X Y Z

10.507 1.5 12 0.375 0.5 0.75 5.5 4 1.5 6

7.005 1.125 9 0.375 0.5 0.5 3.5 3 1.5 4.5

COLORS:

BACKGROUND — ORANGE (RETROREFLECTIVE)

LEGEND, BORDER — BLACK

American Recovery And Reinvestment Act

Sign Layout Details

RECOVERY

Vector-Based, Vinyl-Ready Pictograph

COLORS: LEGEND, OUTLINE — WHITE (RETROREFLECTIVE)

BORDER — BLUE (RETROREFLECTIVE)

BACKGROUND (UPPER) — BLUE (RETROREFLECTIVE)

BACKGROUND (LOWER RIGHT) — RED (RETROREFLECTIVE)

BACKGROUND (LOWER LEFT) — GREEN (RETROREFLECTIVE)

American Recovery And Reinvestment Act

FOREST SERVICE SHIELD

NOTE: Shield artwork supplied by Government.

Shield is also available in decals sizes 2, 2 ½, 3, 4, 5, 6, and 8 inches.

COLORS: LEGEND, OUTLINE — WHITE (RETROREFLECTIVE)

BORDER — WHITE (RETROREFLECTIVE)

BACKGROUND — BROWN (RETROREFLECTIVE)

American Recovery And Reinvestment Act

The Forest Service Shield is fully detailed in EM 7100-15, Sign and Poster Guidelines for the Forest Service.

Sign Layout Details are based on FHWA guidance for an MUTCD compliant construction sign to use to on ARRA projects. Additional information may be found at the links below http://www.fhwa.dot.gov/economicrecovery/arrasignguidance.htm http://www.fhwa.dot.gov/economicrecovery/arrasigndetail.pdf

CIM-2423-01R-NRS-0919-01

(KANE EXPERIMENTAL FOREST ROAD MTCE AND IMPROVEMENT – FR294)

http://www.fhwa.dot.gov/economicrecovery/arrasignguidance.htm http://www.fhwa.dot.gov/economicrecovery/arrasignguidance.htm

File details come from the government source that posted it. Updated .