Blue Bend Beach Repairs on the Monongahela NF Federal contract opportunity
Solicitation number
AG-3434-S-17-0043
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

See attached amendment document. Offer due date is not extended. Revised schedule of items is enclosed and must replace the original schedule in your offer submission. Using the revised schedule will constitute acknowledgement of the amendment.

View the file

Other files for this federal contract opportunity

Other files attached to Blue Bend Beach Repairs on the Monongahela NF, newest first.
File Type Posted
SiteVisitNotes_8.21.17.docx DOCX document
Final_Plans_and_Drawings.pdf PDF
WageDetermination_Heavy.pdf PDF
SF24-Bid_Bond_Form.pdf PDF
GovtProvidedTechnicalProposalForms.rtf RTF text file
FS_Supplemental_Specifications.docx DOCX document
FBOSolicitation_Blue_Bend.pdf PDF
Pictures.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-3434-S-17-0043

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

56A1

MILWAUKEE WI 53202

626 E WISCONSIN AVE SUITE 300

ATTN ACQUISITION MANAGEMENT

EASTERN REGION USDA FOREST SERVICE

09/01/2017000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/17/2017

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Monongahela National Forest

Blue Bend Beach Repairs

Amendment 1

Changes incorporated into Amendment 1 -

-Updated Plan Sheets 2, 3, and 5 (attached)

*Sheet 2: Added note about 20304(b)

*Sheet 3: Updated Schedule of Items

*Sheet 5: Added notes regarding tree removal, stream bedding removal, additional 200 sf of repair area.

-Base Bid

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

MELISSA JOHNSON

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-3434-S-17-0043/000001

*Added to Schedule of Items: 20304(b) Removal of Structures and Obstructions: Tree/Stream

Bedding/Flagstone (see sheet 2 note)

*Item No. 20908(b): Include additional 200 sf of surface area to prepare for flagstone repair.

-Option 1:

*Item 25204: Include an additional 200 sf of area for rock placement of flagstones.

*Item 55201: Include an additional 2 cy of structural concrete.

-Option 2:

*Item 55201: Include an additional 4 cy of structural concrete.

*Item 61305: Include an additional 200 sf of concrete surface finishing.

-Option 3:

*Item 55201: Include an additional 4 cy of structural concrete.

*Item 61305: Include an additional 200 sf of concrete surface finishing.

A revised schedule of items is attached and shall be submitted with your offer. Offer due date is not extended. The site visit notes are also attached for your information.

Period of Performance: 10/01/2017 to 11/30/2017

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Construction RFP AG-3434-S-17-0043 Blue Bend Beach Repairs

BLUE BEND BEACH REPAIR Amendment 1 (9/1/2017)

SCHEDULE OF ITEMS

BASE

ITEM

NO. DESCRIPTION MEASUREMENT

METHOD UNIT TOTAL

UNITS

UNIT

COST TOTAL

15101 MOBILIZATION LSQ LS 1

15701 EROSION CONTROL & POLLUTION

CONTROL LSQ LS 1

20304(a)

CONCRETE SLAB REMOVAL AND

DISPOSAL, INCLUDE ALL AREAS

WHERE NEW CONCRETE SLAB WILL

BE CONTRUCTED AND OTHER

EXISTING CONCRETE WASTE STORED

ON SITE

CQ CY 42

20304(b)

REMOVAL OF STRUCTURES AND

OBSTRUCTIONS: TREE/STREAM

BEDDING/FLAGSTONES

LSQ LS 1

20908(a) STRUCTURE EXCAVATION, RETAINING WALL CQ CY 124

20908(b) STRUCTURE EXCAVATION, FLAG

STONE REPAIR AREA PREPARATION CQ SF 4740

20910(a) STRUCTURE BACKFILL, RETAINING

WALLS CQ CY 106

25105 KEYED RIPRAP, CLASS 6,

COMMERCIAL SOURCE CQ CY 20

25802(a) RETAINING WALL CONSTRUCTION, INCLUDES ALL STEEL REINFORCING CQ SF 112

25802(b)

SHEET PILE WALL CAP

CONSTRUCTION, INCLUDES ALL

STEEL REINFORCING

CQ CY 18

30804(b)

MINOR CRUSHED AGGREGATE,

RETAINING WALL AND SLAB

BEDDING

CQ CY 46

55101 DRIVEN PILES, SHEET PILES CQ SF 1440

61804(a) CONCRETE BARRIERS, PRECAST, RETAINING WALL INSTALLATION CQ EA 5

Total:

OPTION

1 FLAG STONE INSTALLATION

ITEM

NO. DESCRIPTION MEASUREMENT

METHOD UNIT TOTAL

UNITS

UNIT

COST TOTAL

25204 ROCK PLACEMENT, FLAG STONES CQ SF 4740

55201

STRUCTURAL CONCRETE, INCLUDING

ALL SPECIFIED STEEL

REINFORCEMENT

CQ CY 44

OPTION

HAND CUT PATTERN IN CONCRETE

SLAB

ITEM

NO. DESCRIPTION MEASUREMENT

METHOD UNIT TOTAL

UNITS

UNIT

COST TOTAL

55201

STRUCTURAL CONCRETE, INCLUDING

ALL SPECIFIED STEEL

REINFORCEMENT

CQ CY 95

61305 CONCRETE SURFACE FINISHING CQ SF 4740

Total:

OPTION

STAMPED CONCRETE STONE PATTERN AND

SURFACE DYE

ITEM

NO. DESCRIPTION MEASUREMENT

METHOD UNIT TOTAL

UNITS

UNIT

COST TOTAL

55201

STRUCTURAL CONCRETE, INCLUDING

ALL SPECIFIED STEEL

REINFORCEMENT

CQ CY 95

61305 CONCRETE SURFACE FINISHING CQ SF 4740

Contractor Notes:

1. Contractor must be registered in www.sam.gov in order to submit an offer on this project.

THIS IS A FREE REGISTRATION.

2. There is a pre-bid meeting at the site on August 21, 2017 at 1 PM ET.

3. There is a requirement to submit a technical proposal with your offer. See Section L and M.

3. This is a construction project which has the following bonding requirements:

http://www.sam.gov/

The amount of the bid guarantee shall be 20 percent of the base bid price plus the most expensive option or $40,000, whichever is less. 100% performance and payment bonds required for awards over $150,000 upon award. 100% payment bond required for awards under $150,000. See Section I for details.

4. Award will be made to one contractor. You must submit pricing for all items, including any option items in order to be considered. Only one of the options will be awarded. The government will decide upon which option to exercise at the time of contract award.

AG-3434-S-17-0043 Amendment 1
Revised Schedule of Items - Amendment 1
BLUEBENDBEACH - updated Sht 2
BLUEBENDBEACH - updated Sht 3
BLUEBENDBEACH - updated Sht 5