SOW_Install_Generator_and_Automatic_Transfer_Switches_-_Parlier_CA_7-13.pdf
PDF 1 MB Posted
- Attached to
- Install 45kw Generator and Transfer Switches Federal contract opportunity
- Solicitation number
- AG-32SD-S-16-0044
About this file
SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-32SD-S-16-0044_000002.pdf | ||
| Wage_Determination_CA160029_8-12-2016_CA29.pdf | ||
| AG-32SD-S-16-0044-000001.pdf | ||
| AG-32SD-S-16-0044_Sign_In_Sheet.pdf | ||
| RFI_FORM.pdf | ||
| Contractor_Certification_Regarding_EMR.pdf | ||
| AG-32SD-S-16-0044.pdf | ||
| CALCULATION_OF_SELF_PERFORMED_WORK.pdf | ||
| Wage_Determination_CA160029_7-22-2016.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Install Generator & Automatic Transfer Switches
USDA Agricultural Research Service
San Joaquin Valley Agricultural Sciences Center
9611 Riverbend Ave.
Parlier, CA
Install Generator and Automatic Transfer Switches
1. Project Title: “Install Generator and Automatic Transfer Switches”
2. Government Points of Contact
a) Contracting Officer (CO):
Jeffery Ridenour
(309) 681‐6616 jeffery.ridenour@ars.usda.gov
b) Research Program Representative (RPR):
Dr. Ray Yokomi
(559) 596‐2990 Ray.yokomi@ars.usda.gov
c) Occupational Health and Safety Representative:
Ken Cushman
(510) 559 6002 ken.cushman@ars.usda.gov
d) Engineer Project Manager (EPM)/Contracting Officer’s Representative (COR):
Mark McWilliams
(970) 631‐7513 mark.mcwilliams@ars.usda.gov
e) Location Monitor(LM):
Ronald Colby
(559) 596‐2960 ronald.colby@ars.usda.gov
3. Location: The site of work is located at the San Joaquin Valley Agricultural Sciences Center, 9611 Riverbend Ave. Parlier, CA.
4. Site Visit: A site visit and inspection tour is required. Vendor will be notified of the exact time and date to attend the site visit.
5. Scope of Service: The contractor shall provide all professional services necessary for the accomplishment of the contract project and such required services shall be in accordance with requirements as described herein.
a) The Contractor shall provide services for the following tasks marked by an “X”.
[X] Provide a technical and cost proposal to complete the project as per project requirements.
[X] Provide and install all material to complete the project as per project requirements.
6. Project Requirements: Contractor shall furnish a technical and cost proposal to provide services to install and operate a government furnished 60Hz – 45Kw emergency power natural gas generator, (2) automatic transfer switches. The contractor shall also provide supporting electrical cabling, conduit, and accessories as required for complete installation.
The contractor will provide a turn‐key product including proper installation of all material and equipment per manufacturer’s recommendations.
a) The contractor shall work with the site personnel to ensure project is accomplished in a timely manner.
b) Davis Bacon Wage Rates apply to all construction contracts in excess of $2,000.
Employee payroll logs for the project will be required to verify application of accurate wage rates.
c) Projects in excess of $150,000 will require a bid bond. Payment bond with additional security ($35,000‐ $150,000), or Payment bond (over $150,000) and Performance bond (over $150,000) will be required. Obtaining and the cost of these bonds is the responsibility of the Contractor. Contractor shall provide proof of Insurance.
7. Photos:
Photo (1): Site Layout
Photo (2): Electrical Panel System (1)
Photo (3): Electrical Panel System (2)
8. Description of work:
a) Contractor shall install (2) government furnished Automatic Transfer Switch (ATS) equipment items. Location shall be coordinated with and approved by the Location Monitor (LM).
b) Contractor shall appropriately size and install electrical cabling and conduit from the emergency power generator pad to installed ATS equipment locations and make electrical connections.
c) Contractor shall install and provide proper feed and fuel connections to government furnished 60Hz – 45Kw emergency generator in order to provide steady stream power for the following:
i) Air handling systems for GH68, Panel D fed from 400 AMP 120/240, single Phase Power Main.
ii) Air handling system for GH 71 Panel by extra breaker in 400 Amp 120/240 1 PH power main
iii) Cold room refrigeration system by connection to a sub panel from Panel D in GH68 fed from 400 Amp 120/240 1 PH power main.
iv) Split A/C system in Bldg 71A by connection to panel in 71A fed from a 100 Amp 120/240 1PH power main
d) Contractor shall install (6) concrete embedded traffic bollards into existing generator pad surrounding the generator (reference photo above). Installation points shall be approximately as demonstrated in the overhead view below:
Existing Bollard
Contractor shall identify installation points and drill holes to implement new bollards.
The vacant holes must be sized to accommodate rebar reinforcement and filling of the area around the bollard with concrete. Contractor shall install cylindrical rebar cage to provide reinforcement for the bollard installed. Bollard height shall stand 36” above the concrete surface.
9. References & Standards: All construction shall comply with ARS Facilities Design Standards (ARS Manual 242.1, 5‐01‐12), ARS Energy, Water, and Sustainability Policy (ARS Policy & Procedures 134.2, 11‐12‐13), ARS Energy, Water, and Sustainability Policy Bulletin (ARS Policy & Procedures Bulletin 15‐134.2), governing Building Codes, and all applicable local, regional, State, and Federal regulations. Where one or more Codes or regulations conflict, the more stringent shall apply.
10. Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor.
11. Existing Installations/Demolition:
a) Contractor shall modify existing installations as needed to accommodate the new installation. Where applicable contractor shall coordinate demolition or modification of existing installations with the Owner. All disturbances of existing systems shall be thoroughly coordinated with the Owner to prevent disconnecting equipment that may potentially jeopardize in‐progress research.
b) The Owner reserves the right to retain any equipment or materials removed as part of this scope of work. The Contractor shall coordinate any equipment or materials to be retained with the Owner prior to starting demolition operations. The Contractor shall legally dispose all equipment or material removed that will not be retained.
c) The contractor shall divert project waste to recycle where practical. The Contractor shall track and document the amount of waste diverted to recycle. The contractor shall submit diversion documentation as part of closeout. If no waste is diverted to recycle, the contractor shall submit a letter stating so and why diversion was not practical.
12. Submittals:
a) Where applicable, contractor shall provide relevant illustrations, standard schedules, performance charts, instructions, brochures, diagrams, manufacturer descriptive literature, catalog data.
b) The descriptive literature shall be annotated/highlighted to show its conformance with contract requirements.
c) Submittals are required for all building materials and equipment and will be stamped and/or signed by the general contractor prior to submission to the Government.
d) Contractor is responsible for any costs incurred for equipment ordered without prior approval.
13. Quality Control: The work performed under this contract shall be subject to continuous audit by the COR. Quality control is the exclusive responsibility of the Contractor.
14. Temporary Facilities:
a) Temporary utilities (water and electricity) may be furnished to the Contractor by the
Government, if so requested. The Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through its own negligence.
b) Should the Contractor require any power or utility shutdowns during construction, the Contractor shall obtain approval for such shutdown from the Location Monitor three working days prior to the need
15. Site Cleanup: The construction site shall be kept clean and free of debris at all times.
Restore areas disturbed as nearly as possible to the original appearance and condition.
Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the COR.
16. O&M Manuals
a) O&M manuals shall be submitted upon completion and acceptance of the project.
b) O&M manuals shall identify parts of the equipment for future procurement.
17. Training/Start‐up/Commissioning:
a) Contractor is responsible for start‐up, testing, and commissioning of all installed systems.
b) Contractor shall provide user training to cover all safe operation and preventative maintenance actions/frequencies/schedules of equipment included in this solicitation.
18. Final Inspection:
a) The Contractor shall notify the Contracting Officer and Owner in writing 10 days prior to the date that the project will be ready for final inspection. An inspection of the project will be made by the Contracting Officer and Contractor at a mutually agreed upon time.
COR and contractor shall compile a “punch list” prior to final acceptance of the installation and submit completed warranty documentation to manufacturer.
19. Warranty:
a) In addition to any other warranties set out elsewhere in this contract, the Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect of equipment, material or design furnished, or workmanship performed by the Contractor or any of his subcontractors or suppliers at any tier. Such warranty shall continue for a period of one year from the date of final acceptance of the project. Under this warranty, the Contractor shall remedy at his own expense any such failure to conform or any such defect. In addition, the Contractor shall remedy at his own expense any damage to Government owned or controlled real or personal property, when that damage is the result of the Contractor's failure to conform to contract requirements or any such defect of equipment, material, workmanship, or design. The Contractor shall also restore any work damaged in fulfilling the terms of this clause. The Contractor's warranty with respect to work repaired or replaced hereunder will run for one year from the date of such repair or replacement.
20. Notification and Compliance: The Government shall notify the Contractor in writing within a reasonable time after the discovery of any failure, defect, or damage. Should the Contractor fail to remedy any failure, defect, or damage within a reasonable time after receipt of notice thereof, the Government shall have the right to replace or repair and have the cost billed to the Contractor.
21. Latent Defects:
a) The Warranty specified herein shall not limit the Government’s rights with respect to latent defects, gross mistake, or fraud.
22. Acceptance:
a) Upon satisfactory submittal of the above documents the Contracting Officer shall issue to the Owner a certificate recommending final acceptance of the project. Minor unfinished items of work may be listed on the certificate and excepted from final acceptance. A sum sufficient to cover the cost of completing these unfinished items of work will be withheld by the Owner from the final payment. All other funds including retainage shall be due and payable upon receipt by the Owner of the Contracting Officer's certificate. Upon certification by the Contracting Officer that the items of work have been completed, all monies withheld by the Owner shall be due the Contractor
END