AG-32SD-S-16-0044-000001.pdf

PDF 88 KB Posted

Attached to
Install 45kw Generator and Transfer Switches Federal contract opportunity
Solicitation number
AG-32SD-S-16-0044
Issued by
Department of Agriculture Agricultural Research Service Central Program Planning Coordination and Support

About this file

SF 30

View the file

Other files for this federal contract opportunity

Other files attached to Install 45kw Generator and Transfer Switches, newest first.
File Type Posted
AG-32SD-S-16-0044_000002.pdf PDF
Wage_Determination_CA160029_8-12-2016_CA29.pdf PDF
AG-32SD-S-16-0044_Sign_In_Sheet.pdf PDF
RFI_FORM.pdf PDF
Contractor_Certification_Regarding_EMR.pdf PDF
AG-32SD-S-16-0044.pdf PDF
CALCULATION_OF_SELF_PERFORMED_WORK.pdf PDF
Wage_Determination_CA160029_7-22-2016.pdf PDF
SOW_Install_Generator_and_Automatic_Transfer_Switches_-_Parlier_CA_7-13.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-32SD-S-16-0044

x x

0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ARS-PWA-5302-01

PARLIER CA 93648-9757

9611 S. RIVERBEND AVE

USDA ARS PWA PARLIER ADMIN OFFICE

PARLIER ADMIN OFFICE

ARS-WBSC-0330-05-T

Peoria IL 61604 1815 N University St ARS WBSC Contracting, Acquisition, ARS WBSC Contracting, Acquisition, 08/25/2016000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/02/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Period of Performance: 09/05/2016 to 10/15/2016

This amendment is to provide responses to RFI's received, provide an updated wage determination, and provide the site visit sign-in sheet.

The Bid due date has not changed. All other terms and conditions remain unchanged.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JEFFERY A. RIDENOUR

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-32SD-S-16-0044/000001

Q1: Where in the circuitry are the transfer switches going? I assume we are interrupting the main feeds to the panels. (1) 400 amp and (1) 100 amp.

A1: The transfer switches will be located next to the main feed panels.

Q2: Is there a black out time for shut downs?

Particular dates or days of the week?

A2: No. However, the shutdown period should avoid the hottest portion of the day and needs to be coordinated with the location scientist.

Q3: Is there a preferred location for the transfer switches?

A3: The transfer switches will be located next to the main feed panels.

Q4: Is exposed above ground conduit acceptable?

A4: There is local foot, cart, and small vehicle traffic (forklift) all around the proposed generator and transfer switch site, so above ground conduit is not preferred for safety reasons.

Q5: Is overhead gas line feed to generator acceptable?

A5: There is local foot, cart, and small vehicle traffic (forklift) all around the proposed generator and transfer switch site, so above ground gas line is not preferred for safety reasons.

Q6: If underground installation is required will the government be furnishing radar of area to be excavated?

A6: The location can get USA (or other vendor) to mark underground utility lines in areas to be excavated.

Q7: Who is the local authority that will provide inspections?

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-32SD-S-16-0044/000001

A7: The Government designated representative

(Location Monitor) will participate in final inspection and acceptance. If local codes require local authority participate for commissioning/start-up, the contractor shall coordinate such participation.

Q8: Will you please verify that the gas supply lines are sufficient at the site to supply the generator as specified? Will you designate the location that we are to tie in the piping and what pressure it needs to be regulated to?

A8: The contractor shall connect to the gas source within 25¿ of the installation site.

Connection to the main gas supply line is not necessary.

Attachments:

Wage Determination CA160029 8-12-2016 CA29

Site Visit Sign-in sheet

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)