Quality Assurance Surveillance Plan - SAA

View the file

Other files for this federal contract opportunity

Other files attached to USDA ARS South Atlantic Area Laboratories Operations & Maintenance, newest first.
File Type Posted
Amended_Solicitation_AG-32SC-S-15-0003-000001.pdf PDF
Contractor_Questions_ _Answers_-_Solicitation_AG-32SC-15-0003-3-13-2015.docx DOCX document
SAA_PWS-Modification_2_(Changes_Highlighted).docx DOCX document
CORRECTED_Contractor_Questions_ _Answers_-_Solicitation_AG-32SC-15-0003-3-11-2015.docx DOCX document
Contractor_Questions_ _Answers_-_Solicitation_AG-32SC-15-0003-3-11-2015.docx DOCX document
Revised_Solicitation_AG-32SC-S-15-0003.pdf PDF
Contractor_Questions_ _Answers_-_Solicitation_AG-32SC-15-0003_-2-26-2015.docx DOCX document
Notice_Regarding_Contractor_Questions_and_Answers.docx DOCX document
Deadline_for_Contractor_Questions.docx DOCX document
SAA_PWS-Modified_(Changes_Highlighted).docx DOCX document
Revised_Attachment_3_-_Preventive_Maintenance_-_RRC.pdf PDF
Revised_Attachment_2_-_Building_Space_-_RRC.xls XLS spreadsheet
Revised_Attachment_1_-_GFP_-_USHRL.xlsx XLSX spreadsheet
Revised_Attachment_3_-_Preventive_Maintenance_-_SEPRL.pdf PDF
Revised_Attachment_8_-_BioSecurity_ _BioSafety_-_SEPRL.pdf PDF
Revised_Attachment_6_-_Pest_Management_Plan_-_RRC_ _SEPRL.doc DOC document
Revised_Attachment_7_-_Mowed_Areas_-_RRC.pptx PPTX presentation
Revised_Attachment_2_-_Building_Space_-_USHRL.xlsx XLSX spreadsheet
Revised_Attachment_8_-_BioSecurity_ _BioSafety_-_RRC.docx DOCX document
Revised_Attachment_9_-_Vehicle_Inspection_Checklist_(ARS-45).docx DOCX document
Revised_Attachment_1_-_GFP_-_RRC_ _SEPRL.doc DOC document
Revised_Attachment_3_-_Preventive_Maintenance_-_USHRL.xlsx XLSX spreadsheet
Revised_Attachment_7_-_Mowed_Areas_-_SEPRL.pdf PDF
Revised_Attachment_2_-_Building_Space_-_Maps_ _Floor_Plans_-_USHRL.xlsx.pdf PDF
Revised_Attachment_4_-_Vehicle_Inventory_-_RRC.xlsx XLSX spreadsheet
Revised_Attachment_4_-_Vehicle_Inventory_-_SEPRL.xlsx XLSX spreadsheet
Revised_Attachment_12_-_Task_Report_Outlining_Minimum_Maintenance_for_Equipment_-_Ft._Pierce.xlsx XLSX spreadsheet
Revised_Attachment_5_-_Fire_Extinguishers_-_RRC_ _SEPRL.xlsx XLSX spreadsheet
Contractor_Sign-in_Sheet _Ft._Pierce _FL_Site_Visit.pdf PDF
Contractor_Sign-In_Sheet _Athens_Site_Visit _January_6 _2015.pdf PDF
Site_Visit_Notice.docx DOCX document
Attachment_A.11_-__List_of_Elevators_and_Hoisting_Devices _USHRL_Ft_Pierce.xlsx XLSX spreadsheet
Attachment_A.7_-_Historical_Pricing_Data_-_RRC.docx DOCX document
SAA_PWS_-_SR.docx DOCX document
Attachment_A.6.1_-_Historically_Maintained_Equipment_-_SEP.pdf PDF
Attachment_A.6_-_Historically_Maintained_Equipment_-_RRC.pdf PDF
Attachment_A.14_-__Special_Environmental_Rooms_-_USHRL_Ft_Pierce.xlsx XLSX spreadsheet
Attachment_A._4_-_Government_Furnished_Services_via_Contract_-USHRL_FT_Pierce.docx DOCX document
Attachment_A.12_-_List_of_Pressure_Vessels_-_USHRL_Ft_Pierce.xlsx XLSX spreadsheet
Attachment_A.12.1_-_List_of_Pressure_Vessels.docx DOCX document
Attachment_A.15_-_Schedule_of_Flooring_Surfaces_-_RRC.xlsx XLSX spreadsheet
Attachment_A.10_-_Historically_Subcontracted_Services.doc DOC document
Attachment_A.3_Government_Furnished_Property_ _Equipment.pdf PDF
Attachment_A.11.1_-_List_of_Elevators_RRC.docx DOCX document
South_Atlantic_Area_Solicitation-Part_B.docx DOCX document
Solicitation_AG-32SC-S-15-0003.pdf PDF
Attachment_A.9_-_Inventory_of_Government_Owned_Vehicles.xlsx XLSX spreadsheet
Attachment_A.5_-_Additional_Work_Order_History_Summary.xls XLS spreadsheet
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

Operations and Maintenance Support Services at the South Atlantic Area Research Facilities

Richard B. Russell Agricultural Research Center Athens, GA

Southeast Poultry Research Laboratory Athens, GA

U.S. Horticultural Research Laboratory Ft. Pierce, FL i

TABLE OF CONTENTS

1.0INTRODUCTION1
1.1PURPOSE1
1.2PERFORMANCE MANAGEMENT APPROACH1
1.3PERFORMANCE MANAGEMENT STRATEGY2
2.0ROLES AND RESPONSIBILITIES2
3.0IDENTIFICATION OF SERVICES TO BE PERFORMED2
4.0METHODOLOGIES TO MONITOR PERFORMANCE2
5.0QUALITY ASSURANCE REPORTING3
6.0ANALYSIS OF QUALITY ASSURANCE MONITORING RESULTS3
7.0.FAILURE TO PERFORM4

LIST OF ATTACHMENTS

ATTACHMENT 1 Performance Requirements Summary (PRS) Table ATTACHMENT 2 Quality Assurance Monitoring Form ATTACHMENT 3 Quality Assurance Monitoring Form - Customer Complaint Investigation

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

1.0 INTRODUCTION

This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the performance-based Performance Work Statement (PWS) entitled “Operations and Maintenance Support Services at the South Atlantic Area Research Facilities.” This performance-based plan sets forth the procedures and guidelines that the Richard B. Russell Agricultural Research Center (RRC), Southeast Poultry Research Laboratory (SEPL), and U.S. Horticultural Research Laboratory (USHRL) will use in evaluating the technical performance of the operations and maintenance (O&M) service contractor.

1.1 PURPOSE

1.1.1. The purpose of the QASP is to describe the systematic methods used to measure performance and to identify the reports required and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards identified in the PWS.

1.1.2 This QASP is designed to define roles and responsibilities, identify the performance objectives, define the methodologies used to monitor and evaluate the contractor’s performance, describe quality assurance reporting, and describe the analysis of quality assurance monitoring results.

1.2 PERFORMANCE MANAGEMENT APPROACH

1.2.1 The performance-based PWS structures the acquisition around “what” service is required as opposed to “how” the contractor should perform the work. This QASP will define the performance management approach taken by the South Atlantic Area Research Facilities to monitor, manage, and take appropriate action on the contractor’s performance against expected outcomes or performance objectives communicated in the PWS. Performance management rests upon developing a capability to review and analyze information generated through performance metrics. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management. The data generated in a performance management approach provides information that indicates whether or not expected outcomes for required services are being achieved adequately by the contractor.

1.2.2 Performance management also represents a significant shift from the more traditional Quality Assurance (QA) concepts in several ways. Performance management focuses on assessing whether or not outcomes are being achieved and migrates away from scrutiny on compliance with the processes and practices used to achieve the outcome. The only exceptions to process reviews are those required by law (Federal, State, and local) and compelling business situations such as safety and health. An outcome focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved at the desired levels of performance.

1.3 PERFORMANCE MANAGEMENT STRATEGY

1.3.1 The contractor’s Quality Control Plan (QCP) will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report their performance to the designated Government representative.

1.3.2 The Government representative will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The Government will make decisions based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.

2.0 ROLES AND RESPONSIBILITIES

2.1. The Contracting Officer (CO) is responsible for monitoring contract compliance, contract administration and cost control; and resolving any differences between the observations documented by the Administrative Contracting Officer (ACO), and the contractor’s performance.

2.2 The CO will designate one full-time ACO as the Government authority for performance management. The number of additional representatives serving as Technical Inspectors depends upon the complexity of the services measured as well as the contractor’s performance.

2.3 The ACO is responsible for monitoring, assessing, and communicating the technical performance of the contractor and assisting the contractor. The ACO will have the responsibility for completing QA monitoring forms (refer to Attachments 2 and 3) used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the Inspection of Services clause for any service relating to the contract.

3.0 IDENTIFICATION OF SERVICES TO BE PERFORMED

The contractor shall provide operations and maintenance support in accordance with the PWS.

The performance standards are established in the paragraph of the PWS that covers the specific category of work. The acceptable level of performance is set in the acceptable quality level related to that paragraph.

4.0 METHODOLOGIES TO MONITOR PERFORMANCE

4.1 In an effort to minimize the contract administration burden, simplified methods of surveillance techniques shall be used by the Government to evaluate contractor performance. The primary methods of surveillance are random checks, observations, inspections, complaints and review of those records and files that are required to be maintained and delivered under this statement of work. The Government will use appointed representatives, as well as reports and input from employees and visitors as sources of comments on the contractor’s performance.

4.2 The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of professional communication between employees and customers is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints. Performance management drives the contractor to be customer focused through initially addressing customer complaints and investigating the issues and/or problems.

NOTE: The customer always has the option to communicate complaints to the ACO as opposed to the contractor. The ACO will accept the customer complaints and will investigate using the Quality Assurance Monitoring Form – Customer Complaint Investigation identified in Attachment 4.

4.3 The acceptable quality levels (AQL) for contractor performance, located in Attachment 1, Performance Requirements Summary (PRS) Table, are structured to allow the contractor to manage how the work is performed. For certain critical activities such as those involving facility environment, security, chemical biological, radiological, and toxin activities, and accident control, the desired performance level is established at one hundred percent (100%). Other levels of performance are keyed to the relative importance of the task to the overall mission performance at the South Atlantic Area Research Facilities.

5.0 QUALITY ASSURANCE REPORTING

5.1 The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and measured by the performance objectives in Attachment 1.

5.2 The Government’s QA monitoring, accomplished by the COR, will be reported using the monitoring forms in Attachments 2 and 3. The forms, when completed, will document the ACO’s understanding of the contractor’s performance under the contract to ensure that the PWS requirements are being met.

5.2.1 The ACO will retain a copy of all completed QA monitoring forms.

6.0 ANALYSIS OF QUALITY ASSURANCE MONITORING RESULTS

6.1 The Government shall use the observation methods cited to determine whether the AQLs have been met. The Government will evaluate the results which then may be translated into the specific negative incentives that cause adjustments to the contractor’s monthly payments, should performance not meet the AQL’s.

6.2 At the end of each month, the QAS will prepare a written report for the ACO summarizing the overall results of the quality assurance monitoring of the contractor’s performance. This written report which consists of the contractor’s submitted monthly report and the completed Quality Assurance Monitoring Forms (Attachment 3) will become part of the QA documentation.

6.3 The ACO may require the contractor’s project manager, or a designated alternate, to meet with the ACO, QAS, and other Government personnel as deemed necessary to discuss performance evaluation. The ACO will define a frequency of in-depth reviews with the contractor, however if the need arises, the contractor will meet with the ACO as often as required or per the contractor’s request. The agenda of the reviews may discuss:

· Monthly performance measured by the metrics and trends

· Issues and concerns of both parties

· Projected outlook for upcoming months and progress against expected trends

· Recommendations made by the QAS based on contractor information

· Issues arising from independent reviews and inspections

6.4 In addition to QA monitoring, the QAS will use the information contained in the contractor’s monthly report to assess the contractor’s level of performance for each objective measured in this QASP (detailed in Attachment 1). The QAS must coordinate and communicate with the contractor to resolve issues and concerns of marginal or unacceptable performance. The contractor will discuss with the ACO/QAS satisfaction ratings receiving a “less than acceptable” rating. For such cases, the contractor should highlight its perspective on factors driving customer satisfaction and present plans to adjust service levels accordingly to bring the satisfaction rating up to an acceptable level.

6.5 The ACO/QAS and contractor should jointly formulate tactical and long–term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the PCO/ACO.

7.0. FAILURE TO PERFORM

7.1 The contractor may receive deductions or even termination based on failure to perform. The following criteria apply for determining appropriate action:

1. Notifications. Consistent with FAR Part 49, the CO and/or ACO shall notify the service provider of failure to meet standards through QA monitoring forms, cure notices, or show cause notices and shall inform the service provider manager or designated alternate of such notices.

2. Deductions. The Government has the right to deduct a specified dollar for failure to meet performance standards.

3. Termination. If the CO and/or ACO determines that the contractor has failed to perform to the extent that a termination for default is justified, the CO shall issue a notice of termination, consistent with FAR Part 49.

ATTACHMENT 1

PERFORMANCE REQUIREMENTS SUMMARY (PRS) TABLE

Performance Objective
PWS Para
Acceptable Quality Levels
Method

1. Provide all labor, supervision, equipment, materials to provide efficiently and effectively the O&M services identified in the PWS. Processes and outputs ensure no failed research and that emergencies are met within 1 hour.

All
Shall not exceed 2 failed inspections per month.
Random inspections
2. Provide all services to comply with sound environmental policy including Executive Orders and EPA and USDA guidelines.
1.4
Shall not exceed 1 failed inspection per month.
Random inspections, review of Contractor documentation

3. Provide and maintain a fully operational automated work management system for accurately tracking all work requests, planning, estimating, requisitioning, work assignments, scheduling, report and quality control of all work in efficient, effective, accurate and reliable manner. This includes routine and additional task orders.

2.1, 3.1, 4.1
Shall not exceed 2 failed inspections per month.
Random sampling
4. Implement and maintain an automated Preventive Maintenance and Inspection (PMI) Program to correct and prevent malfunctions and maximize the overall operating efficiency.
2.1.2, 3.1.2, 4.1.2
Shall not exceed 2 failed inspections per month.
Random inspections, review of Contractor logs, interviews, review of customer feedback

5. Provide Maintenance, Alteration and Repair of Buildings and Structures in accordance with OSHA standards and applicable recommendations, standards, codes and practices. Install, modify, repair, replace, and maintain fully operational services for electrical systems, facilities and distribution equipment. Maintain and submit repair report logs.

2.2, 3.2, 4.2
Shall not have any failed inspections per month.
Random inspections; review of customer feedback

6. Maintain HVAC and refrigeration systems in accordance with PWS to prevent damage or loss of research.

2.4, 3.2.3, 4.4
Shall not have any failed inspections per month.
Inspection of logs, monthly inspections

7. Install, modify, repair, replace, and maintain fully operational services for electrical systems, facilities and distribution equipment. Maintain and submit repair report logs.

2.5, 3.2.4, 4.5

Shall not have any failed inspections per month.
Periodic inspections, customer feedback

8. Perform all work in a manner that will keep the facility, government and contractor employees safe from harm. Comply with all bio-safety and safety requirements in accordance with EPA, OSHA, Federal, State, County and USDA regulations as required in PWS.

2.7, 3.5, 4.7
Shall not have any failed inspections per month.
Random inspections, review of customer feedback
9. Provide services that keep the facilities clean, well-stocked, and ready for use by employees.
2.6, 4.6
Shall not exceed 2 failed inspections per month.
Periodic inspections, customer feedback

10. Provide administrative support services. Maintain a fully operational and accurate computerized inventory and accounting system. Maintain stockroom supply level to ensure availability. Avoid unsafe conditions by safely maintaining the security of the hazardous chemical storage building at all times. Ensure Government property is properly labeled.

2.8
Shall not exceed 1 failed inspection per month.
Review of reports, customer feedback, random inspections

11. Provide visitor/information support. Answer all incoming calls and refer to appropriate research unit or staff member or take message. Ensure all visitors are properly registered to avoid unauthorized entry. Issue in and out identification badges. Take messages, receive packages and make telephone calls, when necessary.

2.8.2.5
Shall not exceed 2 failed inspections per month.
Periodic review of Visitor Log, periodic inspections, customer feedback
12. Provide facility security necessary to safeguard center against threats identified in the PWS as well as safeguard materials and information against espionage and unauthorized disclosure. Visitors are screened, issued a parking permit and instructed to go to the Receptionist to be issued a visitors badge. Notify ACO immediately of breach of security, with incident report submitted to ACO within one hour of incident.
2.10
Shall not have any failed inspections per month.
Random inspections, review of customer feedback

ATTACHMENT 2

QUALITY ASSURANCE MONITORING FORM

SERVICE or STANDARD: _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

SURVEY PERIOD:___________________
SURVEILLANCE METHOD (Check):_____Random Sampling
_____100% Inspection
_____Periodic Inspection
_____Customer Complaint

LEVEL OF SURVEILLANCE SELECTED (Check):

_____Monthly
_____Quarterly
_____As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD:______ %

ANALYSIS OF RESULTS:

OBSERVED SERVICE PROVIDER PERFORMANCE MEASUREMENT RATE = ______%

SERVICE PROVIDER’S PERFORMANCE (Check):____Meets Standards
____Does Not Meet Standards

NARRATIVE OF PERFORMANCE DURING SURVEY PERIOD: ______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PREPARED BY: ___________________________________ DATE: _____________________

ATTACHMENT 3

QUALITY ASSURANCE MONITORING FORM –

CUSTOMER COMPLAINT INVESTIGATION

SERVICE or STANDARD: _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

SURVEY PERIOD:___________________
DATE/TIME COMPLAINT RECEIVED:_____________________ AM / PM
SOURCE OF COMPLAINT:_______________________________ (NAME)
_______________________________ (ORGANIZATION)
_______________________________ (PHONE NUMBER)
_______________________________ (EMAIL ADDRESS)

NATURE OF COMPLAINT: ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ RESULTS OF COMPLAINT INVESTIGATION: ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ DATE/TIME SERVICE PROVIDER INFORMED OF COMPLAINT: _____________ _________ AM / PM CORRECTIVE ACTION TAKEN BY SERVICE PROVIDER: ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

RECEIVED AND VALIDATED BY: __________________________________________________

PREPARED BY: ___________________________________ DATE: _____________________