AG-32KW-S-17-0097-0001.pdf

PDF 206 KB Posted

Attached to
Reglazing greenhouse windows Federal contract opportunity
Solicitation number
AG-32KW-S-17-0097
Issued by
Department of Agriculture Animal and Plant Health Inspection Service Headquarters Headquarters Administrative Service Headquarterss Division

About this file

AMENDMENT 1

View the file

Other files for this federal contract opportunity

Other files attached to Reglazing greenhouse windows, newest first.
File Type Posted
001.pdf PDF
004.pdf PDF
002.pdf PDF
003.pdf PDF
REVISED_FINAL_SOW_Statement_of_Work_Greenhouses_A-H_(06-01-2017).docx DOCX document
AG-32KW-S-17-0097.pdf PDF
Solicitation_AG-32KW-S-17-0015__Revised_06-17.docx DOCX document
Wage_Determination-Prince_Georges-MD.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-32KW-S-17-0097

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

APHIS-ASD-SCB-32KW

RIVERDALE MD 20737

Unit 45

4700 RIVER ROAD

USDA-APHIS-ASD-SCB

07/19/2017000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/23/2017

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Tax ID Number: Not Available

DUNS Number: Not Available

Amendment one is issued to incorporate revisions to the solicitation:

1. Drawings are inserted into the solicitation.

2. Offerors are requested to submit a one page summary of their technical approach for accomplishing all the work identified in the solicitation.

3. The due date for proposals is extended until 10;00 am on July 26, 2017.

4. In accordance with statutory requirements in FAR part 19:702 subcontracting plans are required for construction requirements from large business that submit proposals for 1.5 million and above.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

HERBERT L. SUBER

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-32KW-S-17-0097/000001

5. If applicable complete and submit the attached subcontracting plan review and clearance sheet with your proposal.

6. There are no other changes to the solicitation. Insert revisions remove the originals.

7. All amendments must be acknowledged by completing blocks 8, 15 a-c and returning completed copy with your proposals.

Period of Performance: 08/07/2017 to 02/14/2019

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Solicitation No.: AG-32KW-S-17-0097-0001

L.11 PROPOSAL PREPARATION

A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements (SOW, Section C), in addition to those identified as evaluation factors or subfactors. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The response shall consist of three (3) separate parts; Part I - Price Proposal, Part II - Technical Proposal, and Part III - Past Performance Information.

B. The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer's opinion, adequate price competition exists no additional cost information will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists; offerors may be required to submit information to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price. Section M - Evaluation Factors for Award

C. Specific Instructions:

1. PART I – PRICE PROPOSAL - Submit electronic proposal via e-mail.

(a) Complete blocks 14, 15, 16, 17, 19, and 20a, 20b and 20c of the RFP Section A, SF1442...... In doing so, the offeror accedes to the contract terms and conditions as written in the RFP Sections A through K. These sections constitute the model contract.

(b) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN), including all add alternate/option. The extended amount must equal the whole dollar unit price multiplied by the number of units.

(c) Complete the necessary fill-ins and certifications in Sections I through K. . For Sections C through I, the offeror shall submit only those pages that require a fill-in.

(d) Complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned in its entirety. For Sections C through I, the offeror shall submit only those pages that require a fill-in.

PART II – TECHNICAL PROPOSAL - Limited to no more than __75_ pages. Submit one (1) electronic via e-mail, based on the Request for Proposal (RFP) and the Statement of Work obtained from the Federal Business Opportunities Solicitation No. AG‐32KW‐S‐17-0097 (section C) including all Amendments. Contractor shall provide a detailed technical approach that is at least one page long that demonstrates how they complete the tasks listed in the SOW.

a) Management Plan

Company Overview Understanding the Statement of Work Technical Approach List of Key personnel Proposed Schedule

b) Quality Assurance Plan Safety Plan Quality Control Plan Waste Management Plan

c) Licenses and Certificates

1. PART III – PAST PERFORMANCE INFORMATION - Only references for same or similar type contract desired. Submit ne (1) electronic copy.

(a) Quality and Satisfaction Rating for Contracts Completed in the Past Three Years: Provide any information currently available (letters, metrics, customer surveys, independent surveys, etc.) which demonstrates customer satisfaction with overall job performance and quality of completed product for same or similar type contract. In addition, explain corrective actions taken in the past, if any, for substandard performance and any current performance problems such as cost overruns, extended performance periods, numerous warranty calls, etc.

(b) Performance Surveys: The government will evaluate the quality and extent of offeror's performance deemed relevant to the requirements of this RFP.

The government will use information submitted by the offeror and other sources such as other Federal Government offices and commercial sources, to assess performance. Provide a list of no more than ten (10), of the most relevant contracts performed for Federal agencies and commercial customers within the last three (3) years. Relevant contracts include Design/Build Greenhouses and renovations, working in and around occupied space. The evaluation of past performance information will take into account past performance information regarding key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to the instant acquisition.

Furnish the following information for each contract listed:

(i) Company/Division name

(ii) Product/Service

(iii) Contracting Agency/Customer

(iv) Contract Number

(v) Contract Dollar Value

(vi) Period of Performance

(vii) Verified, up-to-date name, address, FAX & telephone number of the contracting officer.

© Offeror shall certify company establishment of data on website:

http://www.sam.gov, All vendors seeking to do business with the federal Government shall be registered in the SAM system.

M.1 AWARD DETERMINATION:

BASIS FOR CONTRACT AWARD 1: This is a competitive lowest priced technically acceptable source selection in which competing offerors' past performance history will be evaluated on a basis of approximately equal to cost or price considerations. By submission of its offer, the offeror accedes to all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. All technically acceptable offers shall be treated equally except for their prices and performance records. Failure to meet a requirement may result in an offer being determined technically unacceptable. . The evaluation process shall proceed as follows:

A. Technical Acceptability. Initially, the government technical evaluation team shall evaluate the technical proposals on a pass/fail basis, assigning ratings of Acceptable, or Unacceptable. The proposals shall be evaluated against the following subfactors:

http://www.sam.gov/

a. Management Plan Company Overview Understanding the Statement of Work Technical Approach List of Key personnel Proposed Schedule

b. Quality Assurance Plan Safety Plan Quality Control Plan Waste Management Plan

c. Licenses and Certificate

B. Price Evaluation. Next, the government shall rank all technically Acceptable offers by price, including any add alternate prices if applicable.

C. Performance Confidence Assessment. Using questionnaires, the contracting officer shall seek relevant performance information on all (or a specified number of lowest priced offerors i.e., five to seven) based on (1) the past and present efforts provided by the offeror and (2) data independently obtained from other government and commercial sources.

D. Relevant performance includes performance of efforts involving design/build greenhouses that are similar or greater in scope, magnitude and complexity than the effort described in this solicitation. The purpose of the past performance evaluation is to allow the government to assess the offeror’s ability to perform the effort described in this RFP, based on the offeror’s demonstrated present and past performance. The assessment process will result in an overall performance confidence assessment of Substantial Confidence, Satisfactory Confidence, , No Confidence, or Unknown Confidence. Past performance regarding key personnel who have relevant experience, or sub-contractors that will perform major or critical aspects of the requirement will be rated as highly as past performance information for the principal offeror.

Offerors with no relevant past or present performance history or the offeror’s performance record is so limited that no confidence assessment rating can be reasonably assigned shall receive the rating "Unknown Confidence," meaning the rating is treated neither favorably nor unfavorably.

E. In evaluating past performance, the Government reserves the right to give greater consideration to information on those contracts deemed most relevant to the effort described in this RFP.

F. If the lowest priced evaluated technically acceptable offer is judged to have a Substantial Confidence performance confidence assessment, that offer represents the best value for the government and the evaluation process stops at this point. Award shall be made to that offeror without further consideration of any other offers.

G. The government reserves the right to award a contract to other than the lowest priced offer if the lowest priced offeror is judged to have a performance confidence assessment of "Satisfactory Confidence" or lower. In that event, the Source Selection Authority shall make an integrated assessment best value award decision.

H. Offerors are cautioned to submit sufficient information and in the format specified in Section L and Section C. 4.10. Offeror’s may be asked to clarify certain aspects of their proposal (for example, the relevance of past performance information) or respond to adverse past performance information to which the offeror has not previously had an opportunity to respond. Adverse past performance is defined as past performance information that supports a less than satisfactory rating on any evaluation element or any unfavorable comments received from sources without a formal rating system. Communication conducted to resolve minor or clerical errors will not constitute discussions and the contracting officer reserves the right to award a contract without the opportunity for proposal revision.

I. The government intends to award a contract without discussions with respective offerors. The government, however, reserves the right to conduct discussions if deemed in its best interest.

AMENDMENT 0`

July 17, 2017

U.S. Department of Agriculture

SUBCONTRACTING PLAN REVIEW AND CLEARANCE SHEET

SOLICITATION NO: Dollar Value: NAICS Code: TYPE OF ACQUISITION: SEALED BID

_____ NEGOTIATED

AGENCY CONTRACTING OFFICE TEL: ( ) Performance Period: From To OPTIONS

MAILING ADDRESS

DESCRIPTION

CONTRACTOR: TELEPHONE:

CONTRACTOR IDENTIFICATION CODE:

PLAN SIGNED BY:

TITLE:

INDIVIDUAL CONTRACT PLAN

COMMERCIAL PRODUCT PLAN

SUBCONTRACTING OPPORTUNITIES OFFERED:

SUBCONTRACTING ELEMENTS ACCEPT COMMENTS

1. PROPOSED GOALS (All percentages derived from TOTAL SUBCONTRACTS)

DOLLAR VALUE

WHOLE

NUMBERS

PERCENTAGE

OF TOTAL YES NO

Large Business ____

Small Business (SB) ____

TOTAL SUBCONTRACTS 100%

HUBZone Small Business (HUBZone SB)

Small Disadvantaged Business (SDB)

Women-Owned Small Business (WOSB)

Veteran-Owned Small Business (VOSB)

Service-Disabled Veteran-Owned Small Business

(SDVOSB)

2. Descriptions of: (a) principal products/services to be subcontracted including those planned for SB, HUBZone SB, SDB, WOSB, VOSB and SDVOSB; (b) method used to develop goals; (c) method used to identify potential sources; and (d) offeror’s efforts to ensure equitable opportunities for SB, HUBZone SB, SDB, WOSB, VOSB and SDVOSB. In addition, the offeror must provide a statement as to whether or not indirect costs were included in establishing goals. See Note below.

3. Plan Administrator (Name and Duties)

4. Clause Flow-down:

5. Reporting:

6. Record Keeping:

I have reviewed the plan and found it to provide maximum opportunities for small business, HUBZone small business, small disadvantaged business, women-owned small business, veteran-owned small business, and Service-disabled veteran-owned small business concerns.

Contracting Officer Signature: Date: OSDBU Coordinator Signature: Date:

Office of Small and Disadvantaged Business Utilization Small Business Administration

Concur Concur With the Following Comments: ____Concur _____Concur With the Following Comments: Date:

Comments: Comments:

By: Date: By:

NOTE: If indirect costs were included in establishing the goals, the offeror must explain the method used to determine the proportionate share of indirect costs to be incurred as subcontracts to SB concerns, HUBZone SB concerns, SDB concerns, WOSB concerns, VOSB concerns, and SDVOSB concerns. 2/01

ADPBCD5.tmp
A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and te...
B. The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer...
C. Specific Instructions:
1. PART I – PRICE PROPOSAL - Submit electronic proposal via e-mail.
(a) Complete blocks 14, 15, 16, 17, 19, and 20a, 20b and 20c of the RFP Section A, SF1442...... In doing so, the offeror accedes to the contract terms and conditions as written in the RFP Sections A through K. These sections constitute the model con...
(b) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN), including all add alternate/option. The extended amount must equal the whole dollar unit price multiplied by the number of units.
(c) Complete the necessary fill-ins and certifications in Sections I through K. . For Sections C through I, the offeror shall submit only those pages that require a fill-in.
(d) Complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned in its entirety. For Sections C through I, the offeror shall submit only those pages that require a fill-in.
b) Quality Assurance Plan
c) Licenses and Certificates
1. PART III – PAST PERFORMANCE INFORMATION - Only references for same or similar type contract desired. Submit ne (1) electronic copy.
(a) Quality and Satisfaction Rating for Contracts Completed in the Past Three Years: Provide any information currently available (letters, metrics, customer surveys, independent surveys, etc.) which demonstrates customer satisfaction with overall job ...
(b) Performance Surveys: The government will evaluate the quality and extent of offeror's performance deemed relevant to the requirements of this RFP. The government will use information submitted by the offeror and other sources such as other Federa...
(i) Company/Division name
(ii) Product/Service
(iii) Contracting Agency/Customer
(iv) Contract Number
(v) Contract Dollar Value
(vi) Period of Performance
(vii) Verified, up-to-date name, address, FAX & telephone number of the contracting officer.
© Offeror shall certify company establishment of data on website:
Uhttp://www.sam.govU, All vendors seeking to do business with the
federal Government shall be registered in the SAM system.
a. Management Plan
Company Overview
Understanding the Statement of Work
Technical Approach
List of Key personnel
Proposed Schedule
b. Quality Assurance Plan
Safety Plan
Quality Control Plan
Waste Management Plan
c. Licenses and Certificate
B. Price Evaluation. Next, the government shall rank all technically Acceptable offers by price, including any add alternate prices if applicable.
C. Performance Confidence Assessment. Using questionnaires, the contracting officer shall seek relevant performance information on all (or a specified number of lowest priced offerors i.e., five to seven) based on (1) the past and present efforts pro...
D. Relevant performance includes performance of efforts involving design/build greenhouses that are similar or greater in scope, magnitude and complexity than the effort described in this solicitation. The purpose of the past performance evaluation i...
E. In evaluating past performance, the Government reserves the right to give greater consideration to information on those contracts deemed most relevant to the effort described in this RFP.
F. If the lowest priced evaluated technically acceptable offer is judged to have a Substantial Confidence performance confidence assessment, that offer represents the best value for the government and the evaluation process stops at this point. Awar...
G. The government reserves the right to award a contract to other than the lowest priced offer if the lowest priced offeror is judged to have a performance confidence assessment of "Satisfactory Confidence" or lower. In that event, the Source Selecti...
H. Offerors are cautioned to submit sufficient information and in the format specified in Section L and Section C. 4.10. Offeror’s may be asked to clarify certain aspects of their proposal (for example, the relevance of past performance information) o...
I. The government intends to award a contract without discussions with respective offerors. The government, however, reserves the right to conduct discussions if deemed in its best interest.

File details come from the government source that posted it. Updated .