Amendment 1, Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-2B46-S-17-0056_Combined_SS_Facilitator_Svcs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-2B46-S-17-0056
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
NRCS-PR-12F352
HATO REY PR 00918
Suite 604
654 MUNOZ RIVERA AVENUE
USDA-NRCS CARIBBEAN AREA OFFICE
WASHINGTON DC 20250
NRCS-HQ-122B46
ROOM 6801-S
1400 INDEPENDENCE AVENUE, SW
USDA-NRCS CONTRACTING TEAM 2
NRCS-HQ-122B46
07/14/2017000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/23/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
ORIEL VELEZ
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment is issued to provide the following Q&A on this project:
Q1.What is the expected Level of Effort for the Facilitator?
A1.The Facilitator should conduct four (4)two-day workshops consisting of outreach, classroom activities and field activities in South Carolina counties identified as having a significant HU producer, socially disadvantaged, new and beginning, limited resource, veteran farmer/rancher and landowner population. The workshop locations shall be determined by USDA Census of Agriculture data, and/or identified by NRCS South Carolina as having low minority and limited resource producer and landowner participation in NRCS programs.
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
X 1
7/14/2017
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-2B46-S-17-0056/000001
This includes the facilitator to conduct necessary outreach and marketing to reach HU farmers/ranchers and landowners who may not have had any previous knowledge or contact with NRCS.
Design and produce electronic and print promotional material including flyers, newspaper advertisements, and other promotion products as necessary to promote the workshops. Disseminate and place flyers, newspaper advertisements, and promotional materials in target area using multiple media and information outlets through websites, newspapers, area newsletters, and other sources as needed to promote the workshops.
Distribute the workshop flyers and promotional material throughout the local community, including farm supply and equipment stores, feed stores, libraries, churches, and community buildings. Encourage area media outlets to publish articles about the workshops. Provide flyers and promotional materials to NRCS staff in target areas for distribution to NRCS partners and other sources. The targeted number of attendees at each workshop is a minimum of 25 individuals.
Classroom activities shall consist of the first part or day one of the two-day workshop. Secure meeting facility, all logistics, equipment, materials, presentation needs, and other items as needed to conduct a professional, well delivered, and comprehensive outreach meeting. Through consultation with NRCS South Carolina staff
(predetermined by NRCS) and producers and landowners, develop workshop agenda that encompasses priority programs and services from the NRCS perspective, and also covers the priority needs and services from the producers and landowners perspective. Identify and secure appropriate speakers/presenters. Provide workshop participants with comprehensive NRCS information packets consisting current Farm Bill programs, eligibility requirements, point of contacts for
USDA Service Centers, and other NRCS related program information such as pollinators, soil health, conservation practices, and other relevant info as it relates to the workshop agenda. Develop and provide agendas, coordinate with speakers/presenters as necessary, and arrange all other classroom activities accommodations as necessary. Topics should include NRCS programs and program eligibility, cost-share, conservation easements, and other information identified during meetings as outlined in the statement of work.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 4CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-2B46-S-17-0056/000001
Moderate classroom activities.
Perform a high tunnel construction demonstration, ensure the site is prepared and ready to meet the objectives of the demonstration. Adequate facilities to include potable water, restrooms, and shelter must be provided. The demonstration shall be conducted using at least a three-person construction crew to build a high tunnel from the ground up that meets NRCS guidelines. Engage producers and landowners in a discussion of planning, construction and use of high tunnels.
The facilitator will be responsible for providing all materials and personnel required to conduct the demonstration, which includes installing a
20¿ x 24¿ high tunnel meeting NRCS practice specifications. Under the supervision of the construction crew, invite participants, if possible, to assist in constructing the high tunnel so they may gain hands on experience. Meet all safety requirements and provide participants with any required safety briefings as necessary.
At the conclusion of the demonstration, ensure the site is clean and clear of construction debris, and any trash or material left behind by participants. Perform all tasks as required by the statement of work.
Q2. How many High Tunnels does the Government expect to be installed?
A2. Four (4) high tunnels, one for each workshop conducted.
Q3. Once installed, what is the anticipated disposition of the High Tunnel?
A3. Used by landowner as a demonstration of a successful of high tunnel installation.
Q4. Is this a new contract? If not, what is the current contract number and the value, and Name of the existing contractor?
A4. Yes, a new contract.
Q5. If there is an existing contract, is the existing contractor eligible to bid as the prime?
A5. N/A
Q6. What are the dimensions for the required High Tunnel?
A6. A high tunnel meeting NRCS specifications, Natural Resources Conservation Service
CONSERVATION PRACTICE STANDARD HIGH TUNNEL SYSTEM
Code 325. Minimum size 20¿ x 24¿ meeting NRCS practice specifications.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 4CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-2B46-S-17-0056/000001
Q7. Section 1.2.5, 3rd sentence states ¿Share findings with NRCS South Carolina staff
(predetermined by NRCS) to help determine workshop locations. Identify, contact, visit and evaluate possible venues to host each workshop component as specified in sections 1.2.3 and
1.2.4. The contractor shall be responsible to
contact and gain input from local NRCS county staff, local Chambers of Commerce, Visitor
Bureaus and local farmers¿. Question is, since the location of the workshop, nor the selection of the venue for the field activities can be decided until after consultation with the above mentioned parties, will the Government establish an estimated cost of the transportation, facility cost, feeding cost for the day? If no, please explain the method of estimation to determine reasonable cost.
A7. This is a fixed price contract. The contractor is responsible to determine their own costs. Costs shall include labor, travel, meals and incidentals.
Q8. Section 1.2.5 goes on to say, ¿Once a venue has been selected, the contractor shall execute a contract if necessary with the facility manager or responsible party. Prior to the event, the contractor shall conduct a pre-workshop site visit to ensure the location is as specified, including having the appropriate number of tables and chairs, signage, lighting, and audio visual/presentation equipment when applicable.¿
The question is, since it is impossible to know unless the Government tells us, or we have performed it previously and have historical information we are unable to identify who the Facility Manager is in order to negotiate an acceptable fee, will the Government give this historical information necessary for forecasting the cost involved?
A8. It is the responsibility of the contractor to identify adequate facilities to meet the specifications as outlined in the statement of work. The contractor will need to determine the appropriate parties to execute a contract if necessary with the facility manager or responsible party. The Government cannot provide any historical information as the places for the events occur in different locations.
2. All other terms and conditions of this solicitation remain unchanged. No additional questions will be allowed at this time. Offers due date remain unchanged.