Attachment_2_Quote_Submittal_Worksheet.docx
DOCX document 18 KB Posted
- Attached to
- Lighting Upgrade at Mississippi PMC Federal contract opportunity
- Solicitation number
- AG-2B46-S-17-0025
About this file
Attachment 2 Quote Submittal Worksheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-2B46-S-17-0025_Amendment_0001_Q&A.pdf | ||
| Attachment_3_Frequently_Asked_Questions_and_Answers.pdf | ||
| Attachment_1_Statement_of_Work.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ Number: AG-2B46-S-17-0025 Attachment 2
Quote Submittal Worksheet
These services are for the USDA NRCS to upgrade lighting in the shop and adjacent equipment storage shed at the Jamie L. Whitten Plant Materials Center
| Line Item |
| Service |
| Quantity |
| Unit |
(ea/lot/job)
| Unit Cost |
| Extended Cost |
| 1 |
| Retrofit T8 fluorescent lights in equipment bays (5) and in shop (8) into light-emitting diode (LED) fixtures |
| 13 |
| Each |
| $ |
| $ |
| 2 |
| Repair conduit line that carries compressed air and electricity to end of equipment shed and add new hose and reel. Replace electrical outlets if needed. |
| 1 |
| Job |
| $ |
| $ |
| 3 |
| Replace bathroom bulbs with LED troffer lights (3). |
| 3 |
| Each |
| $ |
| $ |
| 4 |
| Replace exterior lights (2) with LED dusk/dawn automatic lights outside shop office. |
| 2 |
| Each |
| $ |
| $ |
| 5 |
| Replace flood lights (mounted on front of bays and one in front of shop office) with LED dusk/dawn automatic lights outside equipment storage shed (2) |
| 2 |
| Each |
| $ |
| $ |
1. Retrofit T8 fluorescent lights in equipment bays (5) and in shop (8) from T8 into LED.
Lighting color temperature will be Daylight (5000k). Existing troffers should be used (if feasible). Existing light switches should be examined and replaced if necessary. Lights will be sized appropriately to completely light each area at or exceeding level of existing light fixtures.
2. Repair conduit line that carries compressed air and electricity to end of equipment shed and add new hose and reel. Replace electrical outlets if needed.
Repair damaged conduit line to make compressed air and electrical outlets functional throughout equipment shed. Add air hose line and new 50ft reel. Reel and hose should be of premium commercial quality.
3. Replace single bulbs with LED troffer lights in two bathrooms (3 fixtures).
Replace bathroom bulbs with LED troffer lights (3). Lighting color temperature will be Daylight (5000k). Existing light switches should be examined and replaced if necessary. Lights will be sized appropriately to completely light each area at or exceeding level of existing light fixtures.
4. Replace two exterior lighting fixtures with LED dusk/dawn automatic lights outside shop office.
Existing fixtures will be replaced with downward-facing lights to limit light pollution and be equipped with automatic sensors that will engage during periods of low light (dawn/dusk or sundown sensors). Lights will be sized appropriately to completely light each area at or exceeding level of existing fixtures.
5. Replace three flood lights (mounted on front of bays) with LED dusk/dawn automatic lights outside equipment storage shed.
Existing fixtures will be replaced with downward-facing lights to limit light pollution and be equipped with automatic sensors that will engage during periods of low light (dawn/dusk or sundown sensors). Lights will be sized appropriately to completely light each area at or exceeding level of existing fixtures.
Quotes due to Denise Brooks Not Later than 2 p.m. Eastern Time, Friday, April 14, 2017
File details come from the government source that posted it. Updated .