Additional_Amendment_One_Details.pdf

PDF 31 KB Posted

Attached to
Wetland Restoration Project - Halifax County Federal contract opportunity
Solicitation number
AG-2B46-S-16-0014
Issued by
Department of Agriculture National Resources Conservation Service Southeast Region

About this file

Additional Amendment Details

View the file

Other files for this federal contract opportunity

Other files attached to Wetland Restoration Project - Halifax County, newest first.
File Type Posted
SF_30_-_Site_Visit.pdf PDF
Vendor_Sign_in_Sheet.pdf PDF
Site_Visit_Minutes.pdf PDF
20160822_TILLARY_ISSUED_FOR_CONSTRUCTION_REV_4_Pages_47_TO_59.pdf PDF
EG_Surface_20160711.xml XML file
20160822_TILLARY_ISSUED_FOR_CONSTRUCTION_REV_4_Pages_32_TO_34.pdf PDF
20160711_Planting_Areas_and_LOD.dwg DWG drawing
20160822_TILLARY_ISSUED_FOR_CONSTRUCTION_REV_4_Pages_16_TO_31.pdf PDF
20160822_TILLARY_ISSUED_FOR_CONSTRUCTION_REV_4_Pages_44_TO_46.pdf PDF
20160822_TILLARY_ISSUED_FOR_CONSTRUCTION_REV_4_Pages_41_TO_43.pdf PDF
SF_30_-_Amendment_1.pdf PDF
SURFACES_and_ALIGNMENTS.xml XML file
20160822_TILLARY_ISSUED_FOR_CONSTRUCTION_REV_4_Pages_01_TO_15.pdf PDF
20160822_TILLARY_ISSUED_FOR_CONSTRUCTION_REV_4_Pages_35_TO_37.pdf PDF
20160822_CONSTRUCTION_SPECIFICATIONS_ISSUE_FOR_CONSTRUCTION_REV_-_4.pdf PDF
20160822_TILLARY_ISSUED_FOR_CONSTRUCTION_REV_4_Pages_38_TO_40.pdf PDF
CONSTRUCTION_DRAWINGS_REV_1_20150416_SHEETS_41_THROUGH_43.pdf PDF
CONSTRUCTION_DRAWINGS_REV_1_20150416_SHEETS_35_THROUGH_37.pdf PDF
CONSTRUCTION_DRAWINGS_REV_1_20150416_SHEETS_47_THROUGH_59.pdf PDF
CONSTRUCTION_DRAWINGS_REV_1_20150416_SHEETS_01_THROUGH_31.pdf PDF
CONSTRUCTION_DRAWINGS_REV_1_20150416_SHEETS_38_THROUGH_40.pdf PDF
Page_56_from_20150827_Rev_3_TILLARY_COMBINED_ISSUED_FOR_CONSTRUCTION.pdf PDF
SF-1442.pdf PDF
DBA_Wage_Determination_-_Halifax_County.pdf PDF
Solicitation_-_Construction_-_WRP_-_Easement_6645320900RQJ.pdf PDF
Vicinity_Map.jpg JPG image
CONSTRUCTION_DRAWINGS_REV_1_20150416_SHEETS_44_THROUGH_46.pdf PDF
Construction_Specifications.pdf PDF
CONSTRUCTION_DRAWINGS_REV_1_20150416_SHEETS_32_THROUGH_34.pdf PDF
Synopsis_Pre-Solicitation_Notice_(ROUND_2).pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment One - Additional Detail

AG-2B46-S-16-0014

Special Bid Instructions:

Contractor pre-qualifications: Contractors must demonstrate qualifications to perform the work, as defined in the Contract Documents. The information below shall be submitted in a typewritten format accompanying the bid as scheduled. Failure to meet these qualifications will result in rejection of the bid.

- At least one the Contractor’s on site personnel (Site Superintendent, Foreman, Equipment Operator Consultant) shall have completed a minimum of four (4) weeks training in Natural Stream Restoration, Natural Channel Design, or Fluvial Geomorphology as approved by North Carolina NRCS. Conferences shall not count towards this four weeks.

- At least one of the Contractor’s employees directly involved with the project shall have completed a minimum of six (6) weeks training in Natural Stream Restoration, Natural Channel Design, or Fluvial Geomorphology as approved by North Carolina NRCS. Conferences shall not count towards this six weeks.

- Company must have completed 20,000 linear feet of stream restoration utilizing in-stream natural channel stabilization structures (i.e. cross vanes, j-hooks, log vanes, root wads, bioengineering).

- Contractor must have completed at least one significant stream restoration project exceeding $1,000,000 in contract price.

- Experience with plant materials and transplanted vegetation (i.e. native seed mix, bare root seedlings, live stakes, container and balled burlap trees).

- Contractor shall provide verifiable evidence of staff familiarity with construction of stream channels based on principles of natural channel design.

- Contractor shall have an equipment operator on site at all times with at least 2 years of experience constructing streams and in-streams based on natural channel design principles.

- Contractor shall have an operator on site at all times who has completed at least one project of at least 5,000 linear feet in length.

File details come from the government source that posted it. Updated .