J4-Specifications.doc

DOC document 3 MB Posted

Attached to
Green Mountain NF - Workshop Addition and Renovation Project Federal contract opportunity
Solicitation number
AG-1681-S-17-0014
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

J4 - Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Green Mountain NF - Workshop Addition and Renovation Project, newest first.
File Type Posted
Pre-bid_meeting_questions.docx DOCX document
SF_30-Amendment2.pdf PDF
OfferorsCopy-Corrected.rtf RTF text file
SF_30.pdf PDF
SolicitationCopy.rtf RTF text file
OfferorsCopy.rtf RTF text file
J1_Project_Plans.pdf PDF
J2_General_Decision_Number.docx DOCX document
J3_Attch_GovtProvidedTechnicalProposalForms.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GREEN MOUNTAIN NATIONAL FOREST ROCHESTER DISTRICT OFFICE

WORKSHOP ADDITION AND RENOVATION TECHNICAL SPECIFICATIONS

TABLE OF CONTENTS

DIVISION 01 – GENERAL REQUIREMENTS 01100 – SUMMARY OF WORK

017419 – CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

018113.36 – SUSTAINABLE DESIGN REQUIREMENTS - NATIONAL GREEN BUILDING STANDARD

018113.43 – SUSTAINABLE DESIGN REQUIREMENTS - ASHRAE 189.1

DIVISION 02 – EXISTING CONDITIONS 024119 – SELECTIVE DEMOLITION

DIVISION 03 – CONCRETE

033000 – CAST-IN-PLACE CONCRETE

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES 061000 – ROUGH CARPENTRY

061600 – SHEATHING

062000 – FINISH CARPENTRY

DIVISION 07 – THERMAL AND MOISTURE PROTECTION 072100 – THERMAL INSULATION

074623 – WOOD SIDING

076100 – SHEET METAL ROOFING

076200 – SHEET METAL FLASHING AND TRIM

DIVISION 08 – OPENINGS

081113 – HOLLOW METAL DOORS AND FRAMES

083613 – SECTIONAL DOORS

085200 – WOOD WINDOWS

DIVISION 09 – FINISHES 092900 – GYPSUM BOARD

099123 – INTERIOR PAINTING

099300 – STAINING AND TRANSPARENT FINISHING

DIVISION 22 – PLUMBING 221613 – FUEL GAS PIPING

DIVISION 23 – HVAC

235533.16 – GAS-FIRED UNIT HEATER

DIVISION 26 – ELECTRICAL 260000 – ELECTRICAL

262416 – PANEL BOARDS

265116 – FLUORESENCT INTERIOR LIGHTING

265619 – LED EXTERIOR LIGHTING

DIVISION 31 – EARTHWORK 312200 – GRADING

312316 – EXCAVATION

312323 – FILL

END OF INDEX

Green Mountain NF Rochester Workshop Addition and Renovations 01/17

SUMMARY OF WORK

01100 - 2

SECTION 01100 - SUMMARY OF WORK PART 1 – GENERAL

PROJECT IDENTIFICATION

Rochester District Office Workshop Addition and Renovation. Located at 99 Ranger Road, Town of Rochester, and Windsor County, VT.

SUMMARY OF WORK

Accomplishing a renovation and addition to the existing workshop at the Rochester District Office. This includes, but is not limited, to selective demolition, site work, concrete work, rough and finish carpentry, thermal shell work, electrical work, HVAC work, and finishing.

SCOPE OF WORK

Furnish all labor, materials, and incidentals required to accomplish the Summary of Work.

SCHEDULE OF GOVERNMENT-FURNISHED PROPERTY

Existing equipment, shelving and storage cabinets to be retained for reinstallation. Coordinate with COR.

MISCELLANEOUS PROVISIONS

The Contractor shall comply with the requirements of all permits obtained by the Government. The Contractor is responsible to pay for all inspection fees related to permits or requirements of other governing agencies, utilities, etc.

Work Hours - Work shall be scheduled Monday through Friday, between the hours of 8:00 AM and 4:30 PM. No work is permitted on weekends or on Federal Holidays without written authorization of the COR.

The Government will be occupying the site during the construction. Cooperate with the Government's representatives during construction operations to minimize conflicts and facilitate Government usage. Perform the Work in a manner that does not interfere with the Government's operations.

SITE UTILITIES

Electrical service is available on the site. The Contractor may efficiently use this electrical service for work related to this contract at no charge. Contractor shall provide electric generators or other temporary means where electric service is not readily available.

Contractor is responsible to provide temporary sanitation utilities.

CONTRACTOR USE OF PREMISES

The COR will conduct a pre-construction survey with the Contractor to review and document the existing project conditions prior to construction.

Staging area – Portions of the site may be used as staging areas for contractor equipment, material storage and temporary offices. The staging areas shall be cleaned and restored to original condition upon the completion of the project. Coordinate staging area locations with the COR.

The Contractor shall limit use of the premises to the work in areas indicated.
Confine operations at the site to areas indicated. Do not disturb portions of the site beyond the areas in which Work is indicated.
Repair damage caused by construction operations.
Existing materials and equipment that are removed as part of the construction operations, and that are not reused or salvaged as Government property, shall become the property of the Contractor and shall be promptly removed from the site.

END OF SECTION 01100

Green Mountain NF Rochester Workshop Addition and Renovation 01/17

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

017419 - 6

SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL

SUMMARY

Section includes administrative and procedural requirements for the following:

Salvaging nonhazardous demolition and construction waste.

Recycling nonhazardous demolition and construction waste.

Disposing of nonhazardous demolition and construction waste.

Related Requirements:

Section 011200 "Multiple Contract Summary" for coordination of responsibilities for waste management.
Section 311000 "Site Clearing" for disposition of waste resulting from site clearing and removal of above- and below-grade improvements.

DEFINITIONS

Construction Waste: Building, structure, and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging.

Demolition Waste: Building, structure, and site improvement materials resulting from demolition operations.

Disposal: Removal of demolition or construction waste and subsequent salvage, recycling, or deposit in landfill, incinerator acceptable to authorities having jurisdiction.

Recycle: Recovery of demolition or construction waste for subsequent processing in preparation for reuse.

Salvage and Reuse: Recovery of demolition or construction waste and subsequent incorporation into the Work.

ACTION SUBMITTALS

Waste Management Plan: Submit plan within 7 days of date established for the Notice to Proceed.

INFORMATIONAL SUBMITTALS

Waste Reduction Progress Reports: Concurrent with each Application for Payment, submit report. Include the following information:

Material category.

Generation point of waste.

Total quantity of waste in tons (tonnes).

Waste Reduction Calculations: Before request for Substantial Completion, submit calculated end-of-Project rates for salvage, recycling, and disposal as a percentage of total waste generated by the Work.

Recycling and Processing Facility Records: Indicate receipt and acceptance of recyclable waste by recycling and processing facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.

Landfill and Incinerator Disposal Records: Indicate receipt and acceptance of waste by landfills and incinerator facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.

QUALITY ASSURANCE

Waste Management Coordinator Qualifications: Experienced firm, or individual employed and assigned by General Contractor, with a record of successful waste management coordination of projects with similar requirements.

Waste Management Conference(s): Conduct conference(s) at Project site to comply with requirements in Section 013100 "Project Management and Coordination."

WASTE MANAGEMENT PLAN

General: Develop a waste management plan according to requirements in this Section. Plan shall consist of waste identification, waste reduction work plan, and cost/revenue analysis. Distinguish between demolition and construction waste. Indicate quantities by weight or volume, but use same units of measure throughout waste management plan.

Waste Identification: Indicate anticipated types and quantities of demolition, site-clearing and construction waste generated by the Work. Include estimated quantities and assumptions for estimates.

Waste Reduction Work Plan: List each type of waste and whether it will be salvaged, recycled, or disposed of in landfill or incinerator. Include points of waste generation, total quantity of each type of waste, quantity for each means of recovery, and handling and transportation procedures.

Salvaged Materials for Reuse: For materials that will be salvaged and reused in this Project, describe methods for preparing salvaged materials before incorporation into the Work.
Recycled Materials: Include list of local receivers and processors and type of recycled materials each will accept. Include names, addresses, and telephone numbers.
Disposed Materials: Indicate how and where materials will be disposed of. Include name, address, and telephone number of each landfill and incinerator facility.

Handling and Transportation Procedures: Include method that will be used for separating recyclable waste including sizes of containers, container labeling, and designated location where materials separation will be performed.

PART 2 - PRODUCTS

PERFORMANCE REQUIREMENTS

General: Achieve end-of-Project rates for salvage/recycling of 50 percent by weight of total nonhazardous solid waste generated by the Work. Facilitate recycling and salvage of materials

PART 3 - EXECUTION

PLAN IMPLEMENTATION

General: Implement approved waste management plan. Provide handling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract.

Training: Train workers, subcontractors, and suppliers on proper waste management procedures, as appropriate for the Work.

Distribute waste management plan to everyone concerned within three days of submittal return.
Distribute waste management plan to entities when they first begin work on-site. Review plan procedures and locations established for salvage, recycling, and disposal.

Site Access and Temporary Controls: Conduct waste management operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

Designate and label specific areas on Project site necessary for separating materials that are to be salvaged and recycled.
Comply with Section 015000 "Temporary Facilities and Controls" for controlling dust and dirt, environmental protection, and noise control.

SALVAGING DEMOLITION WASTE

Comply with requirements in Section 024119 "Selective Demolition" for salvaging demolition waste.

Salvaged Items for Reuse in the Work:

Clean salvaged items.
Pack or crate items after cleaning. Identify contents of containers with label indicating elements, date of removal, quantity, and location where removed.
Store items in a secure area until installation.
Protect items from damage during transport and storage.
Install salvaged items to comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make items functional for use indicated.

Salvaged Items for Sale and Donation: Not permitted on Project site.

RECYCLING DEMOLITION AND CONSTRUCTION WASTE, GENERAL

General: Recycle paper and beverage containers used by on-site workers.

Recycling Incentives: Revenues, savings, rebates, tax credits, and other incentives received for recycling waste materials shall accrue to Contractor.

Preparation of Waste: Prepare and maintain recyclable waste materials according to recycling or reuse facility requirements. Maintain materials free of dirt, adhesives, solvents, petroleum contamination, and other substances deleterious to the recycling process.

Procedures: Separate recyclable waste from other waste materials, trash, and debris. Separate recyclable waste by type at Project site to the maximum extent practical according to approved construction waste management plan.

Provide appropriately marked containers or bins for controlling recyclable waste until removed from Project site. Include list of acceptable and unacceptable materials at each container and bin.

Inspect containers and bins for contamination and remove contaminated materials if found.

Stockpile processed materials on-site without intermixing with other materials. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.
Stockpile materials away from construction area. Do not store within drip line of remaining trees.
Store components off the ground and protect from the weather.
Remove recyclable waste from Owner's property and transport to recycling receiver or processor as often as required to prevent overfilling bins.

RECYCLING DEMOLITION WASTE

Asphalt Paving: Grind asphalt to maximum 4-inch (100-mm) size.

Asphalt Paving: Break up and transport paving to asphalt-recycling facility.

Concrete: Remove reinforcement and other metals from concrete and sort with other metals.

Pulverize concrete to maximum 4-inch (100-mm) size.

Wood Materials: Sort and stack members according to size, type, and length. Separate lumber, engineered wood products, panel products, and treated wood materials.

Metals: Separate metals by type.

Structural Steel: Stack members according to size, type of member, and length.

Remove and dispose of bolts, nuts, washers, and other rough hardware.

Gypsum Board: Stack large clean pieces on wood pallets or in container and store in a dry location. Remove edge trim and sort with other metals. Remove and dispose of fasteners.

Piping: Reduce piping to straight lengths and store by material and size. Separate supports, hangers, valves, sprinklers, and other components by material and size.

Conduit: Reduce conduit to straight lengths and store by material and size.

Lamps: Separate lamps by type and store according to requirements in 40 CFR 273.

RECYCLING CONSTRUCTION WASTE

Packaging:

Cardboard and Boxes: Break down packaging into flat sheets. Bundle and store in a dry location.
Polystyrene Packaging: Separate and bag materials.
Pallets: As much as possible, require deliveries using pallets to remove pallets from Project site. For pallets that remain on-site, break down pallets into component wood pieces and comply with requirements for recycling wood.
Crates: Break down crates into component wood pieces and comply with requirements for recycling wood.

Wood Materials:

Clean Cut-Offs of Lumber: Grind or chip into small pieces.

Clean Sawdust: Bag sawdust that does not contain painted or treated wood.

Gypsum Board: Stack large clean pieces on wood pallets or in container and store in a dry location.

Clean Gypsum Board: Grind scraps of clean gypsum board using small mobile chipper or hammer mill. Screen out paper after grinding.

Paint: Seal containers and store by type.

DISPOSAL OF WASTE

General: Except for items or materials to be salvaged or recycled, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.

Except as otherwise specified, do not allow waste materials that are to be disposed of accumulate on-site.

Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

General: Except for items or materials to be salvaged or recycled, remove waste materials and legally dispose of at designated spoil areas located off-site.

Burning: Do not burn waste materials.

END OF SECTION 017419

Rochester Workshop Addition and Renovations 01/17

SUSTAINABLE DESIGN REQUIREMENTS - NATIONAL GREEN BUILDING STANDARD

018113.36 - 3

SECTION 018113.36 - SUSTAINABLE DESIGN REQUIREMENTS - NATIONAL GREEN BUILDING STANDARD

PART 1 - GENERAL

SECTION REQUIREMENTS

Definitions:

Regional Materials: Materials that have been extracted, harvested, or recovered, as well as manufactured, within 500 miles (800 km) of Project site. If only a fraction of a product or material is extracted, harvested, or recovered and manufactured locally, then only that percentage (by weight) shall contribute to the regional value.
Recycled Content: The recycled content shall be determined by weight.
"Postconsumer" material is defined as waste material that is generated by end users of the product and that can no longer be used for its intended purpose.
"Preconsumer" material is defined as material diverted from the waste stream during the manufacturing process. Excluded is reutilization of materials such as scrap generated in a process that is reclaimed in the same process that generated it.

Submittals:

Project Materials Cost Data: Provide statement indicating total cost for materials used for Project. Costs exclude labor, overhead, and profit. Include breakout of costs for mechanical electrical and wood-based construction materials. Submit within 30 days of date established for commencement of the Work.

List of proposed materials with recycled content. Indicate postconsumer recycled content and preconsumer recycled content for each product. Submit within 30 days of date established for commencement of the Work.

List of proposed regional materials. Submit within 30 days of date established for commencement of the Work.
Product Data.
Certification letter for materials with recycled content. Indicate postconsumer recycled content, preconsumer recycled content, and cost for each product.
Certification letter for regional materials. Indicate location and distance from Project of material manufacturer and point of extraction, harvest, or recovery for each raw material. Include statement indicating cost for each regional material and the fraction by weight that is considered regional.
Chain-of-custody certificates for certified wood products. Include statement of cost for each product.

MATERIALS

Provide products and procedures necessary to meet requirements of this Section. Although other Sections may specify similar requirements, the Contractor shall determine additional materials and procedures necessary to comply with this Section.

Recycled Content of Materials: Building materials shall have recycled content such that postconsumer recycled content plus one-half of preconsumer recycled content constitute a minimum of 10 percent of cost of materials used for Project.

Do not include mechanical and electrical components in the calculation.

Regional Materials: Not less than 10 percent of building materials (by cost) shall be regional materials.

Certified Wood:

Wood or wood-based products shall be certified to the requirements of one of the following:

American Forest Foundation's "American Tree Farm System Standards."

CSA Z809, "Sustainable Forest Management."

FSC STD-01-001, "FSC Principles and Criteria for Forest Stewardship,” and FSC STD-40-004, "FSC Standard for Chain of Custody Certification."
Sustainable Forestry Initiative's "Sustainable Forestry Initiative Standard."
Other product programs recognized by Programme for the Endorsement of Forest Certification schemes.

The following wood or wood-based products shall be certified:

Wood trim.

Roof framing.

Wall framing.

Roof sheathing.

Wall sheathing.

LOW-EMITTING MATERIALS

Exterior adhesives and sealants shall comply with Green Seal's GS-36 and the following limits for VOC content:

Construction Adhesives: 75 g/L.

Reactive sealants: 50 g/L.

Other Caulks and Sealants: 30 g/L.

Contact Adhesives: 480 g/L.

Interior adhesives and sealants shall comply with Green Seal's GS-36 and with the testing and product requirements of the California Department of Public Health's "Standard Method for the

Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers."

Paints and coatings shall comply with the following limits for VOC content:
Nonflat Paints and Coatings: 150 g/L.
Primers, Sealers, and Undercoaters: 200 g/L.

Floor Coatings: 100 g/L.

Stains: 250 g/L.

Composite wood and agrifiber products and adhesives shall not contain urea-formaldehyde resin.

REFRIGERANT REMOVAL

Remove CFC-based refrigerants from existing HVAC&R equipment indicated to remain and replace with refrigerants that are not CFC based. Replace or adjust existing equipment to accommodate new refrigerant.

CONSTRUCTION INDOOR-AIR-QUALITY MANAGEMENT

Comply with SMACNA's "IAQ Guideline for Occupied Buildings under Construction."

If Owner authorizes use of permanent heating, cooling, and ventilating systems during construction period as specified in Section 015000 "Temporary Facilities and Controls," install filter media having a MERV 8 according to ASHRAE 52.2 at each return-air inlet for the air-handling system used during construction.
Replace all air filters immediately prior to occupancy.

After construction ends, prior to occupancy and with all interior finishes installed, perform a building flush out by supplying a total volume of 14000 cu. ft. (4 300 000 L) of outdoor air per square foot (square meter) of floor area while maintaining an internal temperature of at least 60 deg F (16 deg C) and a relative humidity no higher than 60 percent. Indicate operating procedure for each HVAC system and piece of equipment and the operating duration required for flush out.

After construction ends, prior to occupancy and with all interior finishes installed, perform a building flush out by supplying a total volume of 3500 cu. ft. (1 070 000 L) of outdoor air per square foot (sq. m) of floor area to the space. Once a space is occupied, ventilate it at a minimum rate of 0.30 cfm per sq. ft. (1.52 L/s per sq. m) of outside air. During each day of the occupied flush-out period, ventilation shall begin a minimum of three hours prior to occupancy and continue during occupancy. Maintain these conditions until a total of 14000 cu. ft./sq. ft. (4 300 000 L/sq. m) of outside air has been delivered to the space. Indicate operating procedure for each HVAC system and piece of equipment and the operating duration required for flush out.

END OF SECTION 018113.36

SUSTAINABLE DESIGN REQUIREMENTS - ASHRAE 189.1

018113.43 - 4

SECTION 018113.43 - SUSTAINABLE DESIGN REQUIREMENTS - ASHRAE 189.1 PART 1 - GENERAL

SECTION REQUIREMENTS

Definitions:

Definitions that are a part of ASHRAE 189.1 apply to this Section.

Recycled Content: The recycled content shall be determined by weight.

"Postconsumer" material is defined as waste material that is generated by end users of the product and that can no longer be used for its intended purpose.
"Preconsumer" material is defined as material diverted from the waste stream during the manufacturing process. Excluded is reutilization of materials such as scrap generated in a process that is reclaimed in the same process that generated it.

Biobased Products: Products that comply with the USDA's Designation of Biobased Items for Federal Procurement, contain the "USDA Certified Biobased Product" label, or be composed of solid wood, engineered wood, bamboo, wool, cotton, cork, agricultural fibers, or other biobased materials with at least 50 percent biobased content.

Wood components used to comply with this requirement shall contain not less than 60 percent certified wood tracked through a chain-of-custody process. Certification shall be by a forest certification system with principles, criteria, and standards developed using ISO/TEC Guide 59 or the WTO Agreement on Technical Barriers to Trade.

Regional Materials: Materials and products that are manufactured within 500 miles (800 km) of Project site from materials that have been extracted, harvested, or recovered, as well as manufactured, within 500 miles (800 km) of Project site. If materials are transported by rail or water, the distance transported by rail or water shall be multiplied by 0.25 in determining the distance to Project site. If only a portion of a material or product complies with this requirement, only that portion, by weight, shall be considered regional.

Submittals:

Action Plans: Submit the following action plans within 30 days of date established for the Notice to Proceed indicating how requirements will be met.

List of proposed materials with recycled content. Indicate cost, postconsumer recycled content, and preconsumer recycled content for each product having recycled content.
List of proposed regional materials.

List of proposed biobased products.

Material Emissions and Pollutant Control Plan: List of proposed products. Indicate that each product that complies with criteria.

Construction indoor-air-quality management plan.

Material Selection: Product Data for recycled, bio-based, and regional materials showing compliance with requirements. Tabulate cost for building materials used in the Project and indicate those that are recycled, bio-based, or regional. Include summary of building materials tabulation showing compliance with requirement and the following:

Product Data and certification letter from product manufacturers indicating percentage by weight of recycled content for products having recycled content. Include statement indicating cost.

Product Data and certification letter from product manufacturers for bio-based materials. Include chain-of-custody certificates for products containing certified wood. Include statement indicating cost.

Product Data for regional materials indicating location of material manufacturer and point of extraction, harvest, or recovery for raw materials. Include statement indicating distance from Project site; mode of transportation; and cost.

Indoor Air Quality During Construction:

Construction indoor-air-quality management plan.

Product data for temporary filtration media.

Product data for filtration media used during occupancy.

Material Emissions and Pollutant Control:

Product Data for the following indicating compliance with requirements:

Composite wood products.

Adhesives and sealants.

Paints and coatings.

Floor covering materials.

Ceiling and wall systems.

MATERIALS

Provide products and procedures necessary to meet requirements of this Section. Although other Sections may specify similar requirements, the Contractor shall determine additional materials and procedures necessary to comply with this Section.

Recycled Content: Building materials shall have recycled content such that postconsumer recycled content plus one-half of preconsumer recycled content for Project constitutes a minimum of 10 percent of cost of materials used for Project.

Cost of postconsumer recycled content plus one-half of preconsumer recycled content of an item shall be determined by dividing weight of postconsumer recycled content plus one-half of preconsumer recycled content in the item by total weight of the item and multiplying by cost of the item.

Do not include components of mechanical, electrical, plumbing, and fire safety systems and transportation devices other than piping, plumbing fixtures, ductwork, conduit, wiring, cabling, and elevator and escalator framing in the calculation.

Regional Materials: Not less than 15 percent of building materials, based on cost, shall be regional materials.

Biobased Products: Not less than 5 percent of building materials, based on cost, shall be biobased materials.

MATERIAL EMISSIONS AND POLLUTANT CONTROL

Adhesives and Sealants: Field-applied adhesives and sealants that are inside the weatherproofing system shall comply with either of the following:

VOC emissions shall comply with the requirements of the California Department of Public Health's "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers."
VOC content shall not exceed the following:
Gypsum Board and Panel Adhesives: 50 g/L.
Multipurpose Construction Adhesives: 70 g/L.
Architectural Sealants: 250 g/L.

Sealant Primers for Nonporous Substrates: 250 g/L.

Sealant Primers for Porous Substrates: 775 g/L.

Modified Bituminous Sealant Primers: 500 g/L.

Other Sealant Primers: 750 g/L.

CPVC Welding Compounds: 490 g/L.

PVC Welding Compounds: 510 g/L.

ABS Welding Compounds: 325 g/L.

Plastic Cement Welding Compounds: 250 g/L.

Adhesive Primer for Plastic: 550 g/L.

Contact Adhesive: 80 g/L.
Special-Purpose Contact Adhesive (contact adhesive that is used to bond melamine-covered board, metal, unsupported vinyl, rubber, or wood veneer no more than 1/16 inch thick to any surface): 250 g/L.
Structural Wood Member Adhesive: 140 g/L.

Paints and Coatings: Field applied paints and coatings that are inside the weatherproofing system shall comply with either of the following:

VOC emissions shall comply with the requirements of the California Department of Public Health's "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers."
VOC content shall not exceed the following:

Nonflat Coatings: 100 g/L.

Primers, Sealers, and Undercoats: 100 g/L.

Floor Coatings: 100 g/L.

Stains: 250 g/L.

Floor covering materials shall comply with the requirements of the California Department of Public Health's "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers."

Composite wood products, including particleboard, medium-density fiberboard, straw-based particleboard, panel substrates, and door cores, used inside the weatherproofing system shall be made without urea formaldehyde and shall comply with either of the following:

Third-party certification acceptable to the California Air Resources Board indicating compliance with its regulation "Airborne Toxic Control Measure to Reduce Formaldehyde Emissions from Composite Wood Products."
Requirements of the California Department of Public Health's "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers."

Ceiling and Wall Systems: Ceiling and wall insulation, gypsum board, and wall coverings shall comply with the requirements of the California Department of Public Health's "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers."

CONSTRUCTION INDOOR-AIR-QUALITY MANAGEMENT

Comply with ASHREA 62.1, Ch. 7.

END OF SECTION 018113.43

SELECTIVE DEMOLITION

024119 - 2

SECTION 024119 - SELECTIVE DEMOLITION PART 1 - GENERAL

SECTION REQUIREMENTS

Items indicated to be removed and salvaged remain Owner's property. Carefully detach from existing construction, in a manner to prevent damage, and deliver to Owner ready for reuse. Include fasteners or brackets needed for reattachment elsewhere.

Pre-demolition Photographs: Show existing conditions of adjoining construction and site improvements. Submit before Work begins.

Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted. Coordinate with COR.

It is not expected that hazardous materials will be encountered in the Work. If hazardous materials are encountered, do not disturb; immediately notify COR. Hazardous materials will be removed by Owner under a separate contract.

PEFORMANCE REQUIREMENTS

Regulatory Requirements: Comply with EPA regulations and with hauling and disposal regulations of authorities having jurisdiction.

Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.

DEMOLITION

Maintain services/systems indicated to remain and protect them against damage during selective demolition operations. Before proceeding with demolition, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of the building.

Locate, identify, shut off, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished.

Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

Protect walls, ceilings, floors, and other existing finish work that are to remain. Erect and maintain dustproof partitions. Cover and protect furniture, furnishings, and equipment that have not been removed.

Provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

Provide temporary weather protection to prevent water leakage and damage to structure and interior areas.

Requirements for Building Reuse:

Maintain existing building structure (including structural floor and roof decking) and envelope (exterior skin and framing, excluding window assemblies and nonstructural roofing material) not indicated to be demolished; do not demolish such existing construction beyond indicated limits.

Maintain existing interior nonstructural elements (interior walls, doors, floor coverings, and ceiling systems) not indicated to be demolished; do not demolish such existing construction beyond indicated limits.

Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.

Remove demolition waste materials from Project site and legally dispose of them in an EPA- approved landfill. Do not burn demolished materials.

Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION 024119

CAST-IN-PLACE CONCRETE

033000 - 3

SECTION 033000 - CAST-IN-PLACE CONCRETE PART 1 - GENERAL

SECTION REQUIREMENTS

Submittals: Product Data concrete mix designs and submittals required by ACI 301.

Ready-Mixed Concrete Producer Qualifications: ASTM C 94/C 94M. PART 2 - PRODUCTS

PEFORMANCE REQUIREMENTS

Comply with ACI 301, "Specification for Structural Concrete," and with ACI 117, "Specifications for Tolerances for Concrete Construction and Materials."

MATERIALS

Reinforcing Bars: ASTM A 615/A 615M, Grade 60 (Grade 420), deformed, epoxy coated after fabrication.

Plain Steel Wire: ASTM A 82/A 82M, as drawn.

Plain-Steel Welded Wire Reinforcement: ASTM A 185/A 185M, as drawn, flat sheet.

Portland Cement: ASTM C 150, Type I or II.

Silica Fume: ASTM C 1240, amorphous silica.

Aggregates: ASTM C 33, Class 5S coarse aggregate or better, graded.

Maximum Coarse-Aggregate Size: 1-1/2 inches (38 mm) nominal and shall not be larger than:
1/5 the narrowest dimension between sides of forms, nor
1/3 the depth of slabs, nor

¾ the minimum clear spacing between individuals reinforcing bars.

Air-Entraining Admixture: ASTM C 260.

Chemical Admixtures: ASTM C 494, water reducing, high-range water reducing, water reducing and accelerating, and water reducing and retarding. Do not use calcium chloride or admixtures containing calcium chloride.

Vapor Retarder: Reinforced sheet, ASTM E 1745, Class A.

Available Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:

Fortifiber Building Systems Group.
GCP Applied Technologies Inc. (formerly Grace Construction Products).
Raven Industries, Inc.
Tex-Trude, Inc.

Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.

Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B.

Clear, Waterborne, Membrane-Forming Curing and Sealing Compound: ASTM C 1315, Type 1, Class A.

Available Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:

ChemMasters, Inc.
L&M Construction Chemicals, Inc.
W. R. Meadows, Inc.

Joint-Filler Strips: ASTM D 1751, asphalt-saturated cellulosic fiber, or ASTM D 1752, cork or self-expanding cork.

CONCRETE MIXTURES

Prepare design mixtures, proportioned according to ACI 301.

Normal-Weight Concrete:

Minimum Compressive Strength at Garage Slab: 4000 psi (27.6 MPa) at 28 days.
Minimum Compressive Strength at Foundation Walls: 3000 psi (20.7 MPa) at 28 days.
Maximum Water-Cementitious Materials Ratio: 0.45.

Slump Limit: 4 inches (100 mm), plus or minus 1 inch (25 mm).

Air Content: Maintain within range permitted by ACI 301. Do not allow air content of floor slabs to receive troweled finishes to exceed 3 percent.

Measure, batch, mix, and deliver concrete according to ASTM C 94/C 94M and ASTM C 1116.

When air temperature is above 90 deg F (32 deg C), reduce mixing and delivery time to 60 minutes.

CONCRETING

Construct formwork according to ACI 301 and maintain tolerances and surface irregularities within ACI 347R limits of Class A, 1/8 inch (3.2 mm) for concrete exposed to view.

Place vapor retarder on prepared subgrade, with joints lapped 6 inches (150 mm) and sealed.

Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting reinforcement.

Install construction, isolation, and contraction joints where indicated. Install full-depth joint- filler strips at isolation joints.

Place concrete in a continuous operation and consolidate using mechanical vibrating equipment.

Protect concrete from physical damage, premature drying, and reduced strength due to hot or cold weather during mixing, placing, and curing.

Formed Surface Finish: Smooth-formed finish for concrete exposed to view, coated, or covered by waterproofing or other direct-applied material; rough-formed finish elsewhere.

Slab Finishes: Comply with ACI 302.1R for screeding, restraightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces.

Cure formed surfaces by moisture curing for at least seven days.

Begin curing concrete slabs after finishing. Keep concrete continuously moist for at least seven days. Apply membrane-forming curing compound to concrete and apply membrane-forming curing and sealing compound to concrete.

Polished Concrete Floor Treatment: Apply polished concrete finish system to cured and prepared slabs to Level 3, high sheen, 800 grit.

Machine grind floor surfaces level and smooth.

Apply penetrating liquid floor treatment according to manufacturer's written instructions.

Continue polishing with progressively finer polishing pads to gloss level required.

Neutralize and clean polished floor surfaces.

Contractor will engage a testing agency to perform field tests and to submit test reports.

Protect concrete from damage. Repair and patch defective areas.

END OF SECTION 033000

ROUGH CARPENTRY

061000 - 4

SECTION 061000 - ROUGH CARPENTRY PART 1 - GENERAL

SECTION REQUIREMENTS

Submittals: ICC-ES evaluation reports for wood-preservative treated wood engineered wood products and metal framing anchors.

WOOD PRODUCTS, GENERAL

Lumber: Provide dressed lumber, S4S, marked with grade stamp of inspection agency.

Engineered Wood Products: Acceptable to authorities having jurisdiction and for which current model code research or evaluation reports exist that show compliance with building code in effect for Project.

Allowable Design Stresses: Engineered wood products shall have allowable design stresses, as published by manufacturer that meet or exceed those indicated. Manufacturer's published values shall be demonstrated by comprehensive testing.

Certified Wood: Comply with Section 018113.36 - Sustainable Design Requirements - National Green Building Standard or Section 018113.43 - Sustainable Design Requirements - ASHRAE 189.1.

TREATED MATERIALS

Preservative-Treated Materials: AWPA U1; Use Category UC2.

Use treatment containing no arsenic or chromium. Do not use inorganic boron (SBX) for sill plates.
Kiln-dry lumber after treatment to a maximum moisture content of 19 percent.
Mark lumber with treatment quality mark of an inspection agency approved by the ALSC Board of Review.

Provide preservative-treated materials for items indicated on Drawings, and the following:

Wood cants, nailers, curbs, equipment support bases, blocking, stripping, and similar members in connection with roofing, flashing, vapor barriers, and waterproofing.
Wood sills, blocking, furring, stripping, and similar concealed members in contact with masonry or concrete.
Wood framing members that are less than 18 inches (460 mm) above the ground.
Wood floor plates that are installed over concrete slabs-on-grade.

Fire-Retardant-Treated Materials: Products with a flame-spread index of 25 or less when tested according to ASTM E 84, and with no evidence of significant progressive combustion when the test is extended an additional 20 minutes, and with the flame front not extending more than 10.5 feet (3.2 m) beyond the centerline of the burners at any time during the test.

Use Exterior type for exterior locations and where indicated.

Use Interior Type A unless otherwise indicated.

For enclosed roof framing, framing in attic spaces, and where high-temperature fire- retardant treatment is indicated, provide material with design adjustment factors of not less than 0.85 for modulus of elasticity and 0.75 for extreme fiber in bending for Project's climatological zone.
Kiln-dry lumber after treatment to a maximum moisture content of 19 percent.
Identify with appropriate classification marking of a testing and inspecting agency acceptable to authorities having jurisdiction.

FRAMING

Dimension Lumber:

Maximum Moisture Content: 15 percent for 2-inch nominal (38-mm actual) thickness or less, 19 percent for more than 2-inch nominal (38-mm actual) thickness.
Non-Load-Bearing Interior Partitions:Construction or No. 2:Eastern softwoods: NELMA;.
Framing Other Than Non-Load-Bearing Interior Partitions:Construction or No. 2: Spruce-pine-fir: NLGA.

Laminated-Veneer Lumber: Manufactured with exterior-type adhesive complying with ASTM D 2559. Allowable design values determined according to ASTM D 5456.

Available Manufacturers: Subject to compliance with requirements, provide products by one of the following:

Boise Cascade Corporation.
Georgia-Pacific Building Products.
Louisiana-Pacific Corporation.
Weyerhaeuser Company.

Extreme Fiber Stress in Bending, Edgewise: 2900 psi (20.0 MPa) for 12-inch nominal- (286-mm actual-) depth members.

Modulus of Elasticity, Edgewise: 1,500,000 psi (10 300 MPa).

MISCELLANEOUS LUMBER

Miscellaneous Dimension Lumber: Construction, or No. 2 grade with 19 percent maximum moisture content of any species. Provide for nailers, blocking, and similar members.

Utility Shelving: Eastern white, Idaho white, lodgepole, ponderosa, or sugar pine, Premium or 2 Common (Sterling): NeLMA, NLGA, WCLIB, or WWPA; with 19 percent maximum moisture content.

PLYWOOD BACKING PANELS

Equipment Backing Panels: Plywood, Exterior, AC, fire-retardant treated, not less than 3/4-inch (19-mm) nominal thickness.

MISCELLANEOUS PRODUCTS

Fasteners: Size and type indicated. Where rough carpentry is exposed to weather, in ground contact, or in area of high relative humidity, provide fasteners with hot-dip zinc coating complying with ASTM A 153/A 153M.

Power-Driven Fasteners: CABO NER-272.
Bolts: Steel bolts complying with ASTM A 307, Grade A (ASTM F 568, Property Class 4.6); with ASTM A 563 (ASTM A 563M) hex nuts and, where indicated, flat washers.

Metal Framing Anchors: Structural capacity, type, and size indicated.

<Double click here to find, evaluate, and insert list of manufacturers and products.>
Use anchors made from hot-dip galvanized steel complying with ASTM A 653/A 653M, G60 (Z180) coating designation for interior locations where stainless steel is not indicated.
Use anchors made from stainless steel complying with ASTM A 666, Type 304 for exterior locations and where indicated.

Sill Sealer: Glass-fiber insulation, 1 inch (25 mm) thick, compressible to 1/32 inch (0.8 mm) or closed-cell neoprene foam, 1/4 inch (6.4 mm) thick.

Flexible Flashing: Self-adhesive product consisting of a butyl rubber or rubberized-asphalt compound, bonded to a backing sheet to produce an overall thickness of not less than 0.025 inch (0.6 mm).

INSTALLATION

Set rough carpentry to required levels and lines, with members plumb, true to line, cut, and fitted. Locate nailers, blocking, and similar supports to comply with requirements for attaching other construction.

Framing Standard: Comply with AF&PA's WCD 1, "Details for Conventional Wood Frame Construction," unless otherwise indicated.

Do not splice structural members between supports unless otherwise indicated.

Securely attach rough carpentry to substrates, complying with the following:

CABO NER-272 for power-driven fasteners.
Published requirements of metal framing anchor manufacturer.
Table 2304.9.1, "Fastening Schedule," in the IBC. END OF SECTION 061000

SHEATHING

061600 - 2

SECTION 061600 - SHEATHING PART 1 - GENERAL

SECTION REQUIREMENTS

Submittals: ICC-ES evaluation reports.

2.1

WOOD PANEL PRODUCTS, GENERAL

A.

Plywood: DOC PS 1.

B.

Oriented Strand Board: DOC PS 2.

C.

Certified Wood: Comply with Section 018113.36 - Sustainable Design Requirements - National Green Building Standard or Section 018113.43 - Sustainable Design Requirements - ASHRAE 189.1.

2.2

WALL SHEATHING

A.

Plywood Wall Sheathing: Exterior, Structural I sheathing.

2.3

ROOF SHEATHING

Plywood Roof Sheathing: Exterior, Structural I sheathing.

B.

Composite Nail Base Insulated Roof Sheathing: Polyisocyanurate foam with oriented strand board laminated to one face complying with ASTM C 1289, Type V.

2.4

MISCELLANEOUS PRODUCTS

Fasteners: Size and type indicated.

For roof and wall sheathing, provide fasteners with hot-dip zinc coating complying with ASTM A 153/A 153M.
Power-Driven Fasteners: CABO NER-272.

B.

Adhesives for Field Gluing Panels to Framing: APA AFG-01.

INSTALLATION

Securely attach to substrates, complying with the following:

CABO NER-272 for power-driven fasteners.
Table 2304.9.1, "Fastening Schedule," in the IBC.

Fastening Methods:

Wall and Roof Sheathing:

Nail to wood framing.

END OF SECTION 061600

FINISH CARPENTRY

062000 - 2

SECTION 062000 - FINISH CARPENTRY PART 1 - GENERAL

SECTION REQUIREMENTS

Submittals: Samples for siding and moldings and trim.

2.1

MATERIALS, GENERAL

A.

Lumber: DOC PS 20 and grading rules of inspection agencies certified by American Lumber Standards Committee Board of Review.

B.

Softwood Plywood: DOC PS 1.

C.

Certified Wood: Comply with Section 018113.43 - Sustainable Design Requirements - ASHRAE 189.1.

2.2

EXTERIOR FINISH CARPENTRY

Exterior Lumber Trim: Smooth-textured, Grade A, western red cedar or Grade D and better eastern white pine.

1. Maximum Moisture Content: 19 percent.

INTERIOR STANDING AND RUNNING TRIM

Interior Softwood Lumber Trim: Finish or 1 Common eastern white, Idaho white, lodgepole, ponderosa, or sugar pine.

Maximum Moisture Content: 19 percent.

Wood Moldings: WMMPA WM 4 made to patterns in WMMPA WM 12 from kiln-dried stock.

Moldings for Painted Finish: P-Grade eastern white, Idaho white, lodgepole, ponderosa, radiata, or sugar pine.

MISCELLANEOUS MATERIALS

Fasteners for Exterior Finish Carpentry: Stainless-steel.

Glue: Aliphatic-resin, polyurethane, or resorcinol wood glue recommended by manufacturer.

Wood glue shall have a VOC content of 30 g/L or less.
Use waterproof resorcinol glue for exterior applications.

INSTALLATION

Condition interior finish carpentry in installation areas for 24 hours before installing.

Prime and backprime lumber for painted finish exposed on the exterior. Cut to length and prime ends.

Install finish carpentry level, plumb, true, and aligned with adjacent materials. Scribe and cut to fit adjoining work. Refinish and seal cuts.

Install to tolerance of 1/8 inch in 96 inches (3 mm in 2438 mm) for level and plumb. Install adjoining exterior finish carpentry with 1/32-inch (0.8-mm) maximum offset for flush installation and 1/16-inch (1.5-mm) maximum offset for reveal installation.

Install standing and running trim with minimum number of joints practical, using full-length pieces from maximum lengths of lumber available. Do not use pieces less than 24 inches (610 mm) long except where necessary. Stagger joints in adjacent and related trim. Cope at returns and inside corners and miter at outside corners.

Nail siding at each stud. Do not allow nails to penetrate more than one thickness of siding, unless otherwise recommended by siding manufacturer. Seal joints at inside and outside corners and at trim locations.

END OF SECTION 062000

THERMAL INSULATION

072100 - 2

SECTION 072100 - THERMAL INSULATION PART 1 - GENERAL

SECTION REQUIREMENTS

Submittals: Product Data and ICC-ES evaluation reports for foam-plastic insulation.

Surface-Burning Characteristics: According to ASTM E 84 by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.

INSULATION PRODUCTS

Extruded-Polystyrene Board Insulation: ASTM C 578, Type IV, with flame-spread and smoke- developed indexes of 75 and 450, respectively.

Available Manufacturers: Subject to compliance with requirements, provide products by one of the following:

Dow Chemical Company (The).
Kingspan Insulation Limited.
Owens Corning. Basis of Design: “FOAMULAR® 250, XPS or an approved equal.

Glass-Fiber Loose-Fill Insulation: ASTM C 764, Type 1, pneumatic application, with flame- spread and smoke-developed indexes of 25 and 450, respectively.

Closed-Cell Polyurethane Foam Insulation: ASTM C 1029, Type II, with maximum flame- spread and smoke-developed indexes of 75 and 450, respectively, and minimum density of 1.5 lb/cu. ft. (24 kg/cu. m).

Available Manufacturers: Subject to compliance with requirements, provide products by one of the following:

BASF Corporation.
Dow Chemical Company (The).
Icynene Inc.

ACCESSORIES

Vapor Retarder: Polyethylene, 6 mils (0.15 mm) thick.

Available Manufacturers: Subject to compliance with requirements, provide products by one of the following:

Raven Industries, Inc.
Reef Industries, Inc.
Approved equal.

INSTALLATION

Install insulation in areas and in thicknesses indicated or required to produce R-values indicated. Cut and fit tightly around obstructions and fill voids with insulation.

Maintain 3-inch (76-mm) clearance of insulation around recessed lighting fixtures not rated for or protected from contact with insulation.

Install eave ventilation troughs between roof framing members in insulated attic spaces at vented eaves.

Except for loose-fill insulation and insulation that is friction fitted in stud cavities, bond units to substrate with adhesive or use mechanical anchorage to provide permanent placement and support of units.

Place loose-fill insulation to comply with ASTM C 1015.

Comply with the CIMA's Special Report #3, "Standard Practice for Installing Cellulose Insulation."

Spray-Applied Insulation: Apply insulation according to manufacturer's written instructions. Do not apply insulation until installation of pipes, ducts, conduits, wiring, and electrical outlets in walls is completed and items not indicated to receive insulation are masked.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .