Solicitation_AG05M6S160003.pdf
PDF 437 KB Posted
- Attached to
- GROUNDS MAINTENANCE, NORTH BEND COMPOUND, SNOQUALMIE RANGER DISTRICT Federal contract opportunity
- Solicitation number
- AG-05M6-S-16-0003
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AmendmentNo3.pdf | ||
| 3252016AmendmentNo2.pdf | ||
| AmendmentNo1.pdf | ||
| CopyToSubmit_AG05M6S160003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER
2. CONTRACT NO.
3.AWARD/EFFECTIVE DATE 4. ORDER NUMBER 5. SOLICITATION NUMBER
RFQ AG-05M6-S-16-0003
6. SOLICITATION ISSUE
DTE
3/16/2016
7. FOR SOLICITATION
INFORMATION CALL�:
a. NAME Janet Hada, Contracting Officer
b. TELEPHONE NUMBER (No collect calls)
(425) 783-6052
8. OFFER DUE DATE/
LOCAL TIME
3/30/2016 @ 4:30pm
9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED SET ASIDE 100 % FOR
USDA Forest Service Northwest Contracting Area Mt. Baker-Snoqualmie National Forest 2930 Wetmore Avenue, Ste 3A Everett, WA 98201
SMALL BUSINESS WOMAN –OWNED SMALL BUSINESS (WOSB)
HUBZONE SMALL BUSINESS ELIGIBLE UNDER THE WOMEN OWNED SMALL
BUSINESS PROGRAM
SERVICE DISABLE VETERAN- EDWOSB-
VETERAN-OWNED SMALL
BUSINESS 8(A)
NAICS Code 561730 Size Standard $7.5 million
11. DELIVERY FOR FOB
DESTINATION UNLESS
BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13A. THIS CONTRACT IS RATED
ORDER UNDER DPAS (15 CFR 700
13B. RATING
14. METHOD OF SOLICATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
Snoqualmie Ranger District North Bend Compound 902 S.E. North Bend Way, Bldg. #1 North Bend, WA 98045
SEE BLOCK 9
17a. CONTRACTOR/ OFFERER
TELEPHONE NO. DUNS #____________________
FAX NO. TIN #_____________________
E-Mail Address: ________________________
18a. PAYMENT WILL BE MADE BY
Invoice Processing Platform (IPP) http://www.ipp.gov
17b CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH
ADDRESS IN OFFER
18b. SUMBIT INVOICES TO ADDRESS SHOWN IN BLOCK 18A UNLESS
BLOCK BELOW IS CHECKED SEE ADDENDUM
19.
ITEM NO
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
GROUNDS MAINTENANCE, NORTH BEND COMPOUND,
BASE PLUS OPTIONS YEARS, SNOQUALMIE RANGER DISTRICT
TECHNICAL CONTACTS SEE PAGE 4
ENTER PRICING ON
25. ACCOUNTING AND APPROPRIATION DATA
JOB CODE
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5. ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ONE
COPY TO ISSUING OFFICE, CONTRACTOR AGREES TO FURNISH AND DELIVER
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
HEREIN
29. AWARD OF CONTRACT: REFERENCE RFQ AG-05G1-S-12-00XX
OFFER DATED . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET
FORTH HEREIN , IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
31a. UNITED STATES OF AMERICA (Signature Of Contracting Officer)
30b. NAME AND TITLE OF SIGNER (Type or Print)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or Print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE STANDARD FORM 1449 (Rev. 2/2012)
Prescribed by GSA-FAR (48CFR 53.212
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
Do Not Enter Prices here, enter prices on the attached Schedule of Items, pages 3
Quotes may be mailed to:
Mt. Baker-Snoqualmie National Forest Attn: Contracting Officer 2930 Wetmore Avenue, Ste 3A Everett, WA 98201
Faxed to (425) 783-0129
Emailed to jhada@fs.fed.us
Quotations submitted are considered to be confidential. The name of the Contractor and the amount of the contract will be disclosed only after an award is made
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ________________________________________
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER
34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECTFOR
36. PAYMENT
COMPLETE PARTIAL
FINAL
37. CHECK NUMBER
PARTIAL
FINAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER
FOR PAYMENT
42a. RECEIVED BY (Print)
41 b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41 c. DATE 42b. RECEIVED AT (Location)
42c. DATE RECD (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV.2/2012) BACK
PART 1 – THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
RFQ NO. AG-05M6-S-16-0003
Grounds Maintenance, Snoqualmie Ranger District, North Bend Compound
BASE YEAR (March 1, 2016 –November 30, 2016)
ITEM NO. DESCRIPTION PAY UNIT EST. QTY UNIT PRICE AMOUNT
1.01
Grounds Maintenance
Month
1.02
Fertilization
BASE YEAR
OPTION YEAR A (December 1, 2016 –November 30, 2017)
2.01
Grounds Maintenance, 2.02
OPTION YEAR A
OPTION YEAR B (December 1, 2017 –November 30, 2018)
3.01
Grounds Maintenance, 3.02
OPTION YEAR B
TOTAL PRICE BASE YEAR, $__________________
TOTAL PRICE OPTION YEAR A $__________________
TOTAL PRICE OPTION YEAR B $__________________
TOTAL PRICE BASE AND OPTIONS $__________________
Pricing for Option Years Option Years shall include all escalation of costs for equipment, materials and incidentals, except for labor costs in accordance with FAR Clause 52.222-43, Fair Labor Standards Act and Service Contract Act-Price Adjustment (Multiple Year and Option Contracts) (Nov 2006).
Options:
The contract also has a maximum of two, one-year options to renew. If the option(s) are exercised by the Government, the Period of Performance will be extended each year.
Base Year includes all services represented in the Statement of Work for the Snoqualmie Ranger District, North Bend Compound site.
Option Year A, B includes all services represented in the Statement of Work for Snoqualmie Ranger District, North Bend Compound.
Invoice Processing Platform
The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP).
The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in the previous communications from USDA and Treasury. All invoices are to be submitted via the electronic Invoice Processing Platform. This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Please make sure that your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account
Continuation of SF1449 Block 27: The full text of a clause or provision may be accessed electronically at www.aquisition.gov or http://farsite.hill.af.mil/
CONTRACT CLAUSES
FAR 52.212-4 CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS (MAY 2015)
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.223-3 Hazardous Material Identification and Material Safety Data (JAN 1997) Alternate I (JUL 1995) 52.223-6 Drug-Free Workplace (MAY 2001) 52.232-11 Extras (APR 1984) 52.236-8 Other Contracts (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.245-9 Use and Charges (AUG 2010)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.236-72 Use of Premises (NOV 1996) 452.236-73 Archaeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation, and Pollution (NOV 1996)
FOREST SERVICE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified) to perform the Performance Statement of Work, Investigation plan and Quality Assurance Surveillance Plan referenced in the attachments.
AGAR 452.211-74 PERIOD OF PERFORMANCE (FEB 1988)
The period of performance of this contract is from the effective date of the Notice to Proceed through November 30, 2016.
Note: The contract has two one-year options which may extend the period of performance. If all options are exercised the ending date will be November 30, 2018.
FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 5 days provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years.
FAR 52.223-2, AFFIRMATIVE PROCUREMENT OF BIO BASED PRODUCTS UNDER SERVICE AND
CONSTRUCTION CONTRACTS (DEC 2007)
(a) In the performance of this contract, the Contractor shall make maximum use of bio based products that are USDA-designated items, unless the product cannot be acquired-
(1) Competitively within a time frame providing for compliance with the contract performance schedule;
(2) Meeting contract performance requirements; or
(3) At a reasonable price.
(b) Information about this requirement and these products is available at www.Bio Preferred.gov.
FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 3 days of the expiration.
NOTICE TO PROCEED
A Notice to Proceed will be issued in writing by the Contracting Officer or Contracting Officer's Representative (COR). No work shall begin until receipt of this notice. Contract time shall commence on the day indicated on the Notice to Proceed.
SCHEDULES FOR SERVICE CONTRACTS
Contractor shall, at the pre-work meeting or within 7 days from receipt of any subsequent request from the Contracting Officer, submit a time chart or schedule of proposed progress to insure completion of the work within the time set forth in the contract. If Contractor's progress falls behind that scheduled, the Contractor shall take such action as necessary to improve his progress; in addition, the Contracting Officer may require Contractor to submit a revised schedule and proposed plan of work to ensure completion of the work within the time(s) set forth in the contract.
REQUIREMNT FOR ON SITE POINT OF CONTACT
Prior to start of work on the contract, the Contractor must notify the Government of any designated on-site representatives and the authorities designated to the representative while work is being performed.
Contractor must be present or have a designated representative at all times work is being performed.
The contractor shall clearly define the authorities of any designated representatives and must notify the Government in advance of any changes.
REQUIRED SUBMITTALS
The following is a general summary of the required submittals. Other submittals may be required as specified elsewhere in this contract.
Submittal Title Submittal Date Schedule of Work Prior to Work Starting Job Specific Safety Plan Prior to Work Starting Notification of Subcontracting Prior to Subcontractor Starting Work Release of Claims Form Prior to Final Payment
CONTRACTOR QUALITY CONTROL PLAN
A. Quality Control Plan. The Contractor shall provide a Quality Control Plan (QCP) as part of this Technical Proposal. The
Plan must demonstrate how the Contractor will assure that quality of performance meets the objectives and requirements of the contract. The QCP shall specify:
1. How quality will be monitored to assure performance standards are met.
2. How the work will be supervised.
3. How results of the monitoring will result in quality performance.
4. Identify the personnel responsible for performing quality control.
B. Contractor Quality Control Inspection. The Contractor shall assure themselves that performance meets contract specifications, in accordance with clause FAR 52.212-4, Contract Terms and Conditions – Commercial Items, paragraph (a), Inspection/Acceptance prior to requesting the Government to inspect for payment or acceptance.
INSPECTION AND ACCEPTANCE
The Government will perform specific sampling and testing of work in progress where these responsibilities are not expressly assigned to the Contractor by the Forest Service specifications or elsewhere herein. This does not relieve the Contractor of completing Contractor quality control work.
GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN AND ACCEPTANCE REQUIREMENTS
A. Government Quality Assurance Inspection. The Government will, at its convenience, make periodic inspections of the work to assure itself of contract compliance and to perform Quality Assurance Inspections to determine confirm that the Contractor is performing quality control in accordance with its QCP and that Contractor monitoring results in quality performance of contract objectives.
B. Acceptance. Acceptance of the work under the contract will be made after steps in (a) above have been taken and the
Contracting Officer has made the determination of satisfactory compliance with the specifications.
C. Rework and Reinspection after Rework. When inspections indicates that the performance objectives were not met, the work will be deemed unsatisfactory and payment will not be made until the Contractor has assured the Government that its Quality Control measures have corrected the deficiencies. Inspections after rework will be made in the same manner as the first inspection. The cost to the Government for inspections necessitated by the rework will be deducted from any payments to the Contractor.
AGAR 42.215-73 POST AWARD CONFERENCE (NOV 1996)
(a) A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of contract award. The conference will be held at: 765 South Main, Colville WA. 99114 unless otherwise changed by mutual agreement.
Note: The Contractor designated representative or foreman (whomever the Contractor will have on the site) shall be present at the prework conference.
DEFINITIONS - ADMINISTRATION TERMS
A. Contracting Officer (CO) - The person executing this contract on behalf of the Government, including any duly appointed successor and authorized representatives of the Contracting Officer acting within the limits of his/her authority.
B. Contracting Officer's Representative (COR) - The on-site contract administrator for the Contracting Officer. The duties and responsibilities of the COR are defined a letter (form) of designation issued by the Contracting Officer.
C. Inspector - The person(s) appointed in writing by the COR to conduct and document inspections according to contract specifications and provisions. The inspector's authorities are strictly limited, not to exceed the authority to issue to the contractor a Notice of Noncompliance.
D. Calendar Days - Every day shown on the calendar, Saturdays, Sundays and holidays included.
E. Change Order - An order issued to the Contractor by the Contracting Officer, pursuant to the “change” clause included in
Section I of this contract, requiring work to be performed, within the general scope of the contract.
F. Work Order - An order written by the COR, which directs the Contractor to correct deficient performance. It may also be used to document acceptable completion of units and to approve starting on additional work units.
G. Notice of Noncompliance - A written notice from the CO or COR which documents, for the Contractor's attention, specific performance deficiencies.
H. Contract Item - A pay item designated on the bid schedule and described by a specification.
I. Labor Standards Provisions - Those statutory and regulatory requirements pertaining to the Contractor's employees and employment practices.
J. Specifications - That portion of the contract comprising a description of the general and technical requirements for materials, products or services to be furnished under the contract.
DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE (COR)
A. The Contracting Officer will designate an individual as Contracting Officer's Representative (COR) at time of award.
B. The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual documents executed by the Contracting Officer prior to completion of the contract.
C. The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)
D. On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
E. The COR's major duties and responsibilities are contained in the Forest Service Handbook of Contract Administration. The
COR is delegated full authority under this contract except for the following actions which are reserved for the Contracting Officer:
1. Approve Change Orders and Modifications
2. Take action to terminate the contract for default or Government convenience.
3. Make contract adjustments under the Differing Site Conditions clause.
4. Grant extensions of contract time.
5. Approve assignment of claims.
6. Make final decisions under the Disputes clause.
7. Make final acceptance under the contract.
8. Make final decisions under the Suspension of Work clause.
9. Make equitable adjustments.
10. Authorize change in amount of Payment Retention.
11. Approve subcontractors.
12. Approve payments with deductions or final payment.
13. Approve use and possession prior to completion.
14. Enforce the warranty provisions.
NOTIFICATION OF SUBCONTRACTING
The Contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement. The subcontractor shall have the experience and be equipped for such work. The written notification shall include as a minimum:
A. The name, address and telephone number of the subcontractor.
B. The date upon which the subcontract was entered into and its duration.
C. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.
D. Documentation of the subcontractor's representative authority.
E. Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract.
FAR 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Applicability. This clause applies only to—
(1) Contracts that have been set aside or reserved for small business concerns or 8(a) concerns;
(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) concerns; and
(3) Orders set aside for small business or 8(a) concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).
(c) By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract in the case of a (1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.
(2) Supplies (other than procurement from a nonmanufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials.
(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.
(4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.
PUBLIC OFFICIALS NOT PERSONALLY LIABLE
There shall be no personal liability upon the Contracting Officer or officer in charge, their agents or employees, for any act performed in the discharge of any duty imposed or the exercise of any power or authority conferred upon them by, or within the scope of the contract, it being understood that in all such matters they act solely as agents and representatives of the Government.
FSAR 4G52.222-704 PERSONAL PROTECTIVE EQUIPMENT (FEB 2007)
The Contractor shall train workers in the safe operation and use of equipment that the worker may use before the worker begins using such equipment.
Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered which may cause injury or impairment in the function of any part of the body. Defective or damaged personal protective equipment shall not be used.
The Contractor shall provide chain saw chaps to each employee who operates a chain saw, at no cost to the employee. These chaps must be approved by an Underwriters Laboratory or meet Forest Service specification 6170-47. The chaps shall cover the full length of the thigh and shall extend to the top of the boot on each leg.
The Contractor shall assure that each employee wears foot protection that provides adequate traction and ankle support. Employees operating chain saws shall wear foot protection that is constructed with cut-resistant material which will protect the employee against contact with a running chain saw.
In any area where the worker is exposed to the potential for flying or falling objects, the Contractor shall provide a hard hat, at no cost to the employee, and the Contractor shall assure that the employee wears the hard hat. The hard hat must meet the minimum requirements of American National Standards Institute (ANSI) standard Z89.1-1997.
The Contractor shall provide, at no cost to the employee, eye protection where there is potential for eye injury due to flying objects.
This eye protection must meet the minimum requirements of ANSI standard Z87.1-2003.
The Contractor shall provide, at no cost to the employee, hearing protection where there is a potential for hearing loss due to high intensity noise for example, chain saw operation.
SAFETY PLAN
Prior to allowing any work to commence on the project, the Contractor shall submit a Safety Plan to the Contracting Officer that is in accordance with OSHA Regulations. Such safety plan shall include all tasks and related activities anticipated to successfully complete the work. The safety plan shall include the Personal Protective Equipment (PPE) that the Contractor provides for his/her employees at no cost to them. It shall include how often the PPE is inspected to insure that it is not defective or damaged. It shall include steps the Contractor takes to insure that his/her workers are using the PPE on the worksite and what steps the Contractor uses if an employee is found to be working without the required PPE. The Contractor shall include any safety training he/she provides to his/her employees.
SAFETY ITEMS
(a) Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the work site.
(b) The following checked activities have been identified by the Government as potential safety hazards.
[] Confined Entry Space.
[] Temporary excavation/deep trenching/slope stability.
[] Tree Felling.
[] Fall hazard from work heights exceeding six feet.
[] Blasting.
[] Traffic control on high-volume and/or high-speed and/or limited visibility roads.
[] Heavy equipment operation.
[] Tree climbing and/or tower climbing.
[] Fire hazards.
[x] Hazard materials handling.
[] Electrical hazard.
[] Hydraulic and/or pneumatic and/or other high pressure hazards.
[] Mechanical hazards such as pulleys, springs, etc.
[x] Power tool operation including eye protection.
[x] Overhead hazards.
DAMAGES
If the Contractor does not complete the work within the designated contract time, actual excess costs will be assessed, such as - but not limited to, additional COR and Inspector time and travel.
CONTRACTOR'S REPRESENTATIVE
The Government may, at its option, suspend work with full count of contract time continuing, if the Contractor fails to provide a Contractor's Representative (1) conversant in the English language and (2) able to read and understand the contract.
FINAL CLEANUP
Before final acceptance, all areas occupied by the Contractor in connection with the work shall be cleaned of all contractor’s rubbish, excess materials, temporary structures, and equipment, and all parts of the work area shall be left in a neat and presentable condition.
END OF ADDENDUM TO 52.212-4
FAR 52.212-5 -- CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS -- COMMERCIAL ITEMS (FEB 2016)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)
(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.]
__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509)).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2015) (Pub. L. 109-282) (31 U.S.C. 6101 note).
__ (5) [Reserved].
__ (6) 52.204-14, Service Contract Reporting Requirements (Jan 2014) (Pub. L. 111-117, section 743 of Div. C).
__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Jan 2014) (Pub. L. 111-117, section 743 of Div. C).
X (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).
__ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) (41 U.S.C. 2313).
__ (10) [Reserved].
__ (11) (i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a).
__ (ii) Alternate I (Nov 2011) of 52.219-3.
__ (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
__ (ii) Alternate I (JAN 2011) of 52.219-4.
__ (13) [Reserved] X (14) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C. 644).
__ (ii) Alternate I (Nov 2011).
__ (iii) Alternate II (Nov 2011).
__ (15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
__ (ii) Alternate I (Oct 1995) of 52.219-7.
__ (iii) Alternate II (Mar 2004) of 52.219-7.
__ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2014) (15 U.S.C. 637(d) (2) and (3)).
__ (17) (i) 52.219-9, Small Business Subcontracting Plan (Oct 2015) (15 U.S.C. 637(d) (4)).
__ (ii) Alternate I (Oct 2001) of 52.219-9.
__ (iii) Alternate II (Oct 2001) of 52.219-9.
__ (iv) Alternate III (Oct 2015) of 52.219-9.
__ (18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)).
X (19) 52.219-14, Limitations on Subcontracting (Nov 2011) (15 U.S.C. 637(a) (14)).
__ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d) (4) (F) (i)).
__ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011) (15 U.S.C. 657 f).
X (22) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15 U.S.C. 632(a) (2)).
__ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).
__ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).
X (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
X (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Feb 2016) (E.O. 13126).
X (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
X (28) 52.222-26, Equal Opportunity (Apr 2015) (E.O. 11246).
__ (29) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
X (30) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
__ (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).
__ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
X (33) (i) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O. 13627).
__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
__ (34) 52.222-54, Employment Eligibility Verification (OCT 2015). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
__ (35) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C.
6962(c) (3) (A) (ii)).
__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i) (2) (C)).
__ (36) (i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).
__ (ii) Alternate I (Oct 2015) of 52.223-13.
__ (37) (i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).
__ (ii) Alternate I (Jun 2014) of 52.223-14.
__ (38) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b).
__ (39) (i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).
__ (ii) Alternate I (Jun 2014) of 52.223-16.
X (40) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) (E.O. 13513).
__ (41) 52.225-1, Buy American—Supplies (May 2014) (41 U.S.C. chapter 83).
__ (42)(i) 52.225-3, Buy American—Free Trade Agreements—Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C.
3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
__ (ii) Alternate I (May 2014) of 52.225-3.
__ (iii) Alternate II (May 2014) of 52.225-3.
__ (IV) Alternate III (May 2014) of 52.225-3.
__ (43) 52.225-5, Trade Agreements (FEB 2016) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
X (44) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
__ (45) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
__ (46) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
__ (47) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
__ (48) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
__ (49) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
X (50) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (Jul 2013) (31 U.S.C. 3332).
__ (51) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (Jul 2013) (31 U.S.C.
3332).
__ (52) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).
__ (53) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
__ (54)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).
__ (ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.] __ (1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495).
__ (2) 52.222-41, Service Contract Labor Standards (May 2014) (41 U.S.C. chapter 67).
X (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
__ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
__ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (May 2014) (29 U.S.C.
206 and 41 U.S.C. chapter 67).
__ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (May 2014) (41 U.S.C. chapter 67).
__ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services— Requirements (May 2014) (41 U.S.C. chapter 67).
X (8) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (E.O. 13658).
__ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C. 1792).
__ (10) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p) (1)).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records—Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
(ii) 52.219-8, Utilization of Small Business Concerns (Oct 2014) (15 U.S.C. 637(d) (2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(iii) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.
(iv) 52.222-21, Prohibition of Segregated Facilities (Apr 2015)
(v) 52.222-26, Equal Opportunity (Apr 2015) (E.O. 11246).
(vi) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
(vii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
(viii) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212)
(ix) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(x) 52.222-41, Service Contract Labor Standards (May 2014) (41 U.S.C. chapter 67).
(xi)
X (A) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O 13627).
__ (B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O 13627).
(xii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).
(xiii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services- Requirements (May 2014) (41 U.S.C. chapter 67).
(xiv) 52.222-54, Employment Eligibility Verification (OCT 2015) (E.O. 12989).
(xv) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (E.O. 13658).
(xvi) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xvii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xviii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
FAR 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JULY 2015)
FAR 52.232-40 – PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)
FSAR 4G52.222-704 - PERSONAL PROTECTIVE EQUIPMENT (FEB 2007)
The contractor shall train workers in the safe operation and use of equipment that the worker may use before the worker begins using such equipment.
Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities must be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered which may cause injury or impairment in the function of any part of the body. Defective or damaged personal protective equipment must not be used.
The contractor shall provide chain saw chaps to each employee who operates a chain saw, at no cost to the employee. These chaps must be approved by an Underwriters Laboratory or meet Forest Service specification 6170-47. The chaps must cover the full length of the thigh and must extend to the top of the boot on each leg.
The contractor shall assure that each employee wears foot protection that provides adequate traction and ankle support. Employees operating chain saws shall wear foot protection that is constructed with cut-resistant material which will protect the employee against contact with a running chain saw.
In any area where the worker is exposed to the potential for flying or falling objects, the contractor shall provide a hard hat, at no cost to the employee, and the contractor shall assure that the employee wears the hard hat. The hard hat must meet the minimum requirements of American National Standards Institute (ANSI) standard Z89.1-1997.
The contractor shall provide, at no cost to the employee, eye protection where there is potential for eye injury due to flying objects.
This eye protection must meet the minimum requirements of ANSI standard Z87.1-2003.
The contractor shall provide, at no cost to the employee, hearing protection where there is a potential for hearing loss due to high intensity noise for example, chain saw operation.
SOLICITATION PROVISIONS
INSTRUCTIONS, CONDITIONS, NOTICES TO QUOTERS
AND EVALUATION FACTORS FOR AWARD
FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address (es):
www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)
52.237-1 Site Visit (APR 1984)
AGRICULTURE ACQUISITION REGULATIONS (48 CFR CHAPTER 4) CLAUSES
452.204-70 Inquiries (FEB 1988)
ADDENDUM TO FAR 52.212-1
The following clause(s) are hereby incorporated by reference or full text as appropriate:
FAR 52.237-1 SITE VISIT (APR 1984)
Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
AGAR 452.204-70 INQURIES (FEB 1988)
Inquiries and all correspondence concerning this solicitation should be submitted in writing to the Contracting Officer. Offerors should contact only the Contracting Officer issuing the solicitation about any aspect of this requirement prior to contract award.
WRITTEN INQUIRIES VIA FACSIMILE MACHINE OR E-MAIL
Reference “INQUIRIES (AGAR 452.204-70) (FEB 1988)”. In lieu of sending written inquiries via the postal service, potential quoters may send inquiries via facsimile machine at the phone number shown below, by referencing the solicitation number and directing the inquiry to the attention of the Contracting officer, 425-783-0129 or e-mail to Janet Hada, jhada@fs.fed.us.
END OF ADDENDUM TO FAR 52.212-1
FAR 52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (APR 2014)
a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF 1449). However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.
(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show—
(1) The solicitation number;
(2) The time specified in the solicitation for receipt of offers;
(3) The name, address, and telephone number of the offeror;
(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;
(5) Terms of any express warranty;
(6) Price and any discount terms;
(7) “Remit to” address, if different than mailing address;
(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);
(9) Acknowledgment of Solicitation Amendments;
(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and
(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.
(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender’s request and expense, unless they are destroyed during preaward testing.
(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions or commercial items for satisfying the requirements of this solicitation. Each offer submitted will be evaluated separately.
(f) Late submissions, modifications, revisions, and withdrawals of offers.
(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.
(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and—
(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or
(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or
(C) If this solicitation is a request for proposals, it was the only proposal received.
(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer…