S-16-0017_IDIQ_Service_Roads.pdf

PDF 587 KB Posted

Attached to
Various Roadside Maintenance Service IDIQ Federal contract opportunity
Solicitation number
AG-05G1-S-16-0017
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Solicitation for IDIQ Road Services and Heavy Equipment

View the file

Other files for this federal contract opportunity

Other files attached to Various Roadside Maintenance Service IDIQ, newest first.
File Type Posted
Amend_7_Map_2016ClearGrubEast.pdf PDF
Amend_7_Drawings_and_Maps.pdf PDF
Amendment_0007.pdf PDF
Amend_7_Map_2016ClearGrubWest.pdf PDF
Amendment_0006_Project_4.pdf PDF
Amendment_6_Maps_Project_4.pdf PDF
Amendment_0005.pdf PDF
amend_5_maps.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
S-16-0017_Package_4_Limestone_Solicitation.pdf PDF
S-16-0017_Package_4_FSSS_Limestone__specs.pdf PDF
S-16-0017_Package_4_Maps.pdf PDF
Amendment_0002.pdf PDF
S-16-0017_Package_3_FSSS_Sanpoil__specs.pdf PDF
S-16-0017_Package_3_Maps_and_Drawings.pdf PDF
S-16-0017_Package_3_Sanpoil_Solicitation.pdf PDF
2016ClearGrubEast.pdf PDF
S-16-0017_Clearing_Grubbing_Specs.pdf PDF
Clearing_and_Grubbing_Drawings_1_to_4.pdf PDF
S-16-0017_Package_2_Clearing_and_Grubbing.pdf PDF
2016ClearGrubWest.pdf PDF
Amendment_01.pdf PDF
BioPreferred_Product_Categories_June_2013.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

806299

PAGE 1 OF

2. CONTRACT NO.

3.AWARD/EFFECTIVE DATE 4. ORDER NUMBER 5. SOLICITATION NUMBER

AG-05G1-S-16-0017

6. SOLICITATION ISSUE

DATE

June 7, 2016

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME Cathy E. Van Alyne Contracting Officer

b. TELEPHONE NUMBER (No collect calls) 509.684.7114

8. OFFER DUE DATE/

LOCAL TIME

June 30, 2016

9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED SET ASIDE 100 % FOR

USDA Forest Service Colville National Forest 765 South Main Colville, WA 99114

Quotes are due June 30, 2016 at 3:00 p.m.

SMALL BUSINESS WOMAN –OWNED SMALL BUSINESS (WOSB)

HUBZONE SMALL BUSINESS ELIGIBLE UNDER THE WOMEN OWNED SMALL

BUSINESS PROGRAM

SERVICE DISABLE VETERAN- EDWOSB

VETERAN-OWNED SMALL

BUSINESS 8(A)

NAICS Code 115310 Size Standard $7.5 million

11. DELIVERY FOR FOB

DESTINATION UNLESS

BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13A. THIS CONTRACT IS RATED

ORDER UNDER DPAS (15 CFR 700

13B. RATING

14. METHOD OF SOLICATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

Colville National Forest 765 South Main Colville, WA 99114

See Block 9

17a. CONTRACTOR/ OFFERER

TELEPHONE NO. DUNS #____________________

FAX NO.

E-Mail Address: ________________________

18a. PAYMENT WILL BE MADE BY As Identified per Individual Task Order

Invoice Office: Invoice Processing Platform (IPP). All invoices must be submitted electronically through the Invoice Processing Platform (IPP) via www.ipp.gov.

Payment Office is: USDA, OCFO, COD, APB.

P.O. Box 60075, New Orleans, LA 70160

17b CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH

ADDRESS IN OFFER

18b. SUMBIT INVOICES TO ADDRESS SHOWN IN BLOCK 18A UNLESS

BLOCK BELOW IS CHECKED SEE ADDENDUM

19.

ITEM NO

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

Various Road and Heavy Equipment Services, IDIQ

See attached Schedule of Items

25. ACCOUNTING AND APPROPRIATION DATA

JOB CODE

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5. ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ONE

COPY TO ISSUING OFFICE, CONTRACTOR AGREES TO FURNISH AND DELIVER

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

HEREIN

29. AWARD OF CONTRACT: REFERENCE RFQ AG-05G1-S-16-0017

OFFER DATED . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET

FORTH HEREIN , IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

31a. UNITED STATES OF AMERICA (Signature Of Contracting Officer)

30b. NAME AND TITLE OF SIGNER (Type or Print)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or Print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE STANDARD FORM 1449 (Rev. 2/2012)

Prescribed by GSA-FAR (48CFR 53.212

IDIQ Various Road and Heavy Equipment Services AG-05G1-S-16-0017 Colville National Forest Page 2

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

Various IDIQ Road Services

Reference pages 55 and 56 on information required in submitting your quote. You may e-mail your quote to cvanalyne@fs.fed.us with hardcopy to follow. Return to the address in block 9. On your sealed envelope, please write RFQ AG-05G1-S-16-0017, due June 30, 2016.

Quotations submitted are considered to be confidential. The name of the Contractor and the amount of the contract will be disclosed only after an award is made.

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ________________________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER

34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECTFOR

36. PAYMENT

COMPLETE PARTIAL

FINAL

37. CHECK NUMBER

PARTIAL

FINAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER

FOR PAYMENT

42a. RECEIVED BY (Print)

41 b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41 c. DATE 42b. RECEIVED AT (Location)

42c. DATE RECD (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV.2/2012) BACK

mailto:cvanalyne@fs.fed.us

IDIQ Various Road and Heavy Equipment Services RFQ AG-05G1-S-16-0017 Colville National Forest Page 3

PART I—THE SCHEDULE

SECTION B-- SERVICES AND PRICES/COSTS SCHEDULE OF ITEMS

Contract Type and Contract Period

This is a Fixed Price and Labor Hour, Indefinite – Delivery, Indefinite-Quantity (IDIQ) type contract for a three

(3) year period. Reference FAR 52.216-18, FAR 52.216-19 and FAR 52.216-22.

The contract is intended to provide the Government flexibility to order various road and heavy equipment services as need arises and as funding is available. It is not possible to determine the actual requirements during the contract period; the Government cannot specify any definite quantity of services. Actual quantity and time frame when task orders (or work orders) will be placed will vary.

This contract only applies to activites covered by the Service Contract Labor Standards. It does not cover activites covered under Labor Standards for Contracts Involving Construction.

The Ordering Period establishes date limits for the issuance of Individual Project Task Orders. Actual performance periods for completion of work included in Individual Project Task Orders may extend beyond these dates.

The actual value of each contract is based on the cumulative amounts of Individual Project Task Orders and any modifications to them.

The start work date and performance time will be identified on each task order. Contract time may run continuously with no time discounted for weather or fire restrictions.

Total Number of Base Contracts

The intent of this acquisition is to award approximately a minimum of up to three IDIQ base contracts.

AGAR 452.216-73 Minimum and Maximum Contract Amounts (FEB 1988)

During the period specified in FAR clause 52.216-18, ORDERING, the Government shall place orders totaling a minimum of $2,500 (for a total of all three years), but not in excess of the ceiling price.

AGAR 452.216-74 Ceiling Price (FEB 1988)

The ceiling price of this contract is $600,000 (for all three years); this price is an aggregate value of all orders combined regardless of whether there are 1 – 3 contract holders. The Contractor shall not make expenditures or incur obligations in the performance of this contract which exceed the ceiling price specified herein, except at the Contractor’s own risk.

System of Award Management Requirement

No award will be made to a Contractor not registered in the System of Award Management (SAM). In addition, the Contractor’s Representations and Certification must be listed in the SAM database. Reference https://www.acquisition.gov or https://www.sam.gov/portal/public/SAM/.

Note: There is no fee to register and use this site.

https://www.acquisition.gov/

IDIQ Various Road and Heavy Equipment Services AG-05G1-S-16-0017 Colville National Forest Page 4

During the contract, the Contractor must always have an active status in SAM during the life of this contract.

Invoices will be paid using the financial information provided in the Contractor’s SAM profile. Failure to keep an active status may result in payment delays and other administration delays.

Colville National Forest Page 5

CONTRACT CLAUSES

Block 27 of SF1449: The full text of a clause or provision may be accessed electronically at www.arnet.gov/far.

FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (MAY 2015)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g.,use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—

IDIQ Various Road and Heavy Equipment Services AG-05G1-S-16-0017 Colville National Forest Page 6

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, contract line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g.,52.232-33, Payment by Electronic Funds Transfer— System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by

EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR Part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.—

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR Part 1315.

Colville National Forest Page 7

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall –

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the -

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidations errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected contract line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest. (i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final Decisions. The Contracting Officer will issue a final decision as required by 33.211 if-

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence of amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer with the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

IDIQ Various Road and Heavy Equipment Services AG-05G1-S-16-0017 Colville National Forest Page 8

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(iv) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on -

(A) The date of which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge mad under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance.

In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

Colville National Forest Page 9

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C.

1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C.

431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards Act; 41 U.S.C. chapter 87, Kickbacks; 41 U.S.C. 4712 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.

(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services.

(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause.

(3) The clause at 52.212-5.

(4) Addenda to this solicitation or contract, including any license agreements for computer software.

(5) Solicitation provisions if this is a solicitation.

(6) Other paragraphs of this clause.

(7) The Standard Form 1449.

(8) Other documents, exhibits, and attachments.

(9) The specification.

(t) System for Award Management (SAM).

(1) Unless exempted by an addendum to this contract, the Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

IDIQ Various Road and Heavy Equipment Services AG-05G1-S-16-0017 Colville National Forest Page 10

(2)(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in FAR Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to (A) change the name in the SAM database; (B) comply with the requirements of Subpart 42.12; and (C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(3) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the SAM database. Information provided to the Contractor’s SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.

(4) Offerors and Contractors may obtain information on registration and annual confirmation requirements via SAM accessed through https://www.acquisition.gov.

(u) Unauthorized Obligations

(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS) or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any loss of liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the follow shall govern.

(i) Any Such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g, “click-wrap” or “browse-wrap agreements), execution does not bind the Government or any Government authorized end user to such clause.

(iii) Any such clause is deemed to be stricken form the EULA, TOS, or similar legal instrument or agreement.

(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.

(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

https://www.acquisition.gov/

Colville National Forest Page 11

Addendum To FAR 52.212-4

Addendum to 52.212-4(g), Invoice. The Forest Service is utilizing the Invoice Processing Platform (IPP) for the electronic submission and tracking of contracts/purchase orders, invoices and payment information. IPP is a secure Government-wide, Web-based invoice processing service. Visit http://www.ipp.gov to learn more.

Upon award of a contract, Contractors must register at https://www.ipp.gov/vendors/enrollment-vendors.htm.

Contractors shall submit all invoices electronically via IPP. Paper copies of invoices will no longer be accepted. The Contractor must also attach a detailed invoice in IPP.

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.acquisition.gov www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.211-18 Variation in Estimated Quantity (APR 1984) 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts (SEPT 2013) 52.223-3 Hazardous Material Identification and Material Safety Data (JAN 1997) 52.223-6 Drug-Free Workplace (MAY 2001) 52.228-5 Insurance – Work on a Government Installation (JAN 1997) 52.232-11 Extras (APR 1984) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities and Improvements

(APR 1984)

52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.237-2 Protection of Government Buildings, Equipment, and Vegetation (APR 1984) 52.242-14 Suspension of Work Order (APR 1984) 52.244-6 Subcontracts for Commercial Items (FEB 2016) 52.245-1 Government Property (APR 2012) 52.245-9 Use and Charges (APR 2012) 52.253-1 Computer Generated Forms (JAN 1991) http://www.ipp.gov/ https://www.ipp.gov/vendors/enrollment-vendors.htm http://www.usda.gov/procurement/policy/agar.html

IDIQ Various Road and Heavy Equipment Services AG-05G1-S-16-0017 Colville National Forest Page 12

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.228-71 Insurance Coverage (NOV 1996) Alternate I 452.237-70 Loss, Damage, Destruction or Repair (FEB 1988) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archaeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation, and Pollution (NOV 1996) 452.236-77 Emergency Response (NOV 1996)

FOREST SERVICE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

4G52.222-705 Camping Provisions for Labor Intensive Contracts (FEB 2007) 4G52.222-706 Privacy Basics Course Mandatory for Certain Contracts (FEB 2007)

FAR 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEPT 2013)

(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—

(1) The product cannot be acquired—

(i) Competitively within a time frame providing for compliance with the contract performance schedule;

(ii) Meeting contract performance requirements; or

(iii) At a reasonable price.

(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:

(i) Spacecraft system and launch support equipment.

(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.

(b) Information about this requirement and these products is available at http://www.biopreferred.gov.

(c) In the performance of this contract, the Contractor shall—

(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and

(2) Submit this report no later than—

(i) October 31 of each year during contract performance; and

(ii) At the end of contract performance.

Colville National Forest Page 13

FAR 52.222-42 Statement of Equivalent Rates for Federal Hires (MAY 2014)

In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.

This Statement is for Information Only:

It Is Not A Wage Determination.

Employee Class

Basic Rate Per Hour

% of Pay for H & I

Paid Holidays

Paid Vacation

% of Pay for Retirement

WG-10 $22.59 Hr 1/ 2/ 3/ 4/ WG-8 $20.28 Hr

1/ 5.1% of basic hourly rate.

2/ Ten paid holidays per year: New Year’s Day, Martin Luther King Day, Washington’s Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, and Christmas Day.

3/ 13 days paid vacation for each year of service up to three years, 20 days after three years, 26 days after 15 years.

4/ 7% of basic hourly rate

FAR 52.216-18 Ordering (OCT 1995)

A. Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from: Date of contract award through November 30, 2019.

B. All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order and this contract, the contract shall control.

C. If mailed, a delivery order or task order is considered “issued” when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods.

FAR 52.216-19 Order Limitations (OCT 1995)

A. Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $1,500.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

B. Maximum order. The Contractor is not obligated to honor --

1. Any order for a single item in excess of $150,000;

2. Any order for a combination of items in excess of $500,000; or

IDIQ Various Road and Heavy Equipment Services AG-05G1-S-16-0017 Colville National Forest Page 14

3. A series of orders from the same ordering office within 21 days that together call for quantities exceeding the limitation in subparagraph 1. or 2. above.

C. If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum order limitations in paragraph (b) of this section.

D. Notwithstanding paragraphs B. and C. above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within seven days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

FAR 52.216-22 Indefinite Quantity (OCT 1995)

A. This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

B. Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum." The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum."

C. Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

D. Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contracts effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after the performance period identified in the last individual task order issued within the effective period, unless otherwise mutually agreed.

Admininstration of Indvidual Project Task Orders

Wherever the term “contract” is used herein it shall be construed to apply equally to Individual Project Task Orders placed under the contract, as if each Individual Project Task Order was a separate contract.

There are numerous other examples where reference to “contract” shall apply as if the term “Individual Project Task Order” was substituted. The Contractor shall refer all questions to the Contracting Officer if clarification is needed regarding the application of contract clauses to Individual Project Task Orders.

Each Individual Project Task Order is separable to the extent that it will be initiated, performed, administered, completed and closed independently.

1. Individual Project Task Orders may have separate Contracting Officers, Contracting Officer’s

Colville National Forest Page 15 representatives and inspectors.

2. Individual Project Task Orders will have unique performance terms and notices to proceed.

3. Individual Project Task Orders will require separate submittals, unless otherwise agreed.

4. Individual Project Task Orders will have separate payments.

Process for Requesting Individual Task Order Requests (TOR) and Awarding Task Orders

(a) Individual Task Order Requests and awards shall follow the process established in this section.

(b) Individual Task Order Requests: Following initial evaluation and determination for award of the IDIQ base contracts, it is the Government’s intent to provide each IDIQ Contractor with a fair opportunity to be considered for each Individual Project Task Order Requests as outlined under FAR 16.505(b)(1).

(c) After Base Contract Award. Individual project packages will be provided to the IDIQ Contractors, with a specified response date and time. Questions related to the project shall be submitted to the assigned Contracting Officer. Submission of written questions may be required. Individual Project Task Order Requests may require only a price proposal or may also require submission of a technical proposal. Most task orders requests will be written; however, there may be some done orally.

(d) Request for Individaul Task Order Request(s). Individual Task Order Requests shall be submitted to the Contracting Officer identified on tin the request by the specified response date and time. Proposal submissions shall include all information as specified in the Task Order Request.

Task Orders will be packaged with all necessary detailed requirements that supplement the basic contract, as required. Each Task Order package may include the following:

• The SF 1449 (Solicitation / Contract / Order for Commercial Items) or the OF 347 (Order for Supplies or Services)

• Task Order Schedule of Items

• Statement of Work – Project Scope and Project Location

• Any Administrative Information, as required

• Performance period requirements

• Government-furnished property if applicable, government-furnished facilities, or government-furnished services

• Special Contract Requirements – Supplements to the basic contract clauses if applicable. This will include: any use and operational period limitations, submittal requirements, and other details, as required. and other detailed requirements applicable to the specific individual project

• Attachments:

• Project Maps

• Road Lists

• Drawings

• Evaluation Criteria and Basis of Award

The Government may also do the task order verbally if it is considered an urgent requirement.

IDIQ Various Road and Heavy Equipment Services AG-05G1-S-16-0017 Colville National Forest Page 16

(e) Source Selection for Award of Individual Projects

The basis for award of Individual Project Task Order Request may vary depending upon the goals and objectives for each task order. The basis of award will be described in the Task Order Requests. Examples of a basis for award are:

• The task order will be awarded to the Contractor offering the best value to the government, considering both price and non-price factors. The Government reserves the right to accept other than the lowest price offered; or

• The task order award will be based on price only.

The task order request may describe whether price is less important, more important, or equal in importance to the non-price factors.

FAR Part 15 will not be used in determining award of the Indivdual Task Order. The Government may do a comparative analysis or use FAR Part 13.

Pricing of individual projects will be Firm-Fixed-Price (FFP).

(f) Award of Individual Projects. A written award mailed or otherwise provided to the IDIQ Contractor shall result in a binding Individual Project Task Order.

(g) No Award of Individual Project Offerings. If a fair and reasonable price is not reached through the individual project proposal process, that individual project will be withdrawn for acquisition separate from this contract.

(h) Individual Project Task Orders Types. Will be Firm-Fixed-Price (FFP).

(i) Minimum Guarantee. The contract minimum amount is offset by the value of awarded Individual Project Task Orders. If an awarded base IDIQ Contractor receives no task orders during the entire period of this contract the minimum guarantee will be applied. The need to meet an individual contractor’s minimum guarantee may be the determining factor in making award of a task order.

(j) Authorized Officials to Place Orders. The following individuals may place Individual Project Task Orders against this contract:

Any warranted Contracting Officer with proper delegated authority within the USDA Forest Service, Region 6.

Individual Task Order Request Responses

It is understood that the Contractor will be balancing their other commercial work with any proposed work under the awarded contract. Nonetheless there is a general expectation that Contractors will respond affirmatively to the majority of Individual Task Order Projects. Repetitive failure to respond may impact the source selection process for future Individual Project proposals.

Task Order Ombudsman / Competition Advocate

In accordance with FAR 16.505(b)(6), no protest under FAR subpart 33.1 is authorized in connection with CO decisions regarding fair opportunity or the issuance of a TO under this contract, except for a protest on the grounds that a TO increases the scope, period, or maximum value of the contract. The Ombudsman will review

Colville National Forest Page 17 complaints from the contractors and ensure that all contractors are afforded a fair opportunity to be considered consistent with the procedures in the contract. Complaints to the USDA Forest Service Ombudsman shall be forwarded to:

Branch Chief, Policy, Acquisition Management, Washington Office Attn: Ms. Tiffany J. Taylor 1621 N Kent Street, Plaza E, Suite 707 Arlington, VA 22209 Telephone: (703) 605-4573 Facsimile: (703) 605-5100

AGAR 452.211-75 Effective Period of Contract (FEB 1988)

The effective period of this contract is from date of award through November 30, 2019.

Individual Project Task Order Performance Period Requirements

The following clause FAR 52.211-10 shall apply to each individual Task Order. An estimated start work date will be included within the Task Order. The specific days/dates included under a Task Order will vary considerable. The allowed performance completion period for individual projects will be dependent upon factors such as project size, complexity, available work periods limitations, dates of issuance and the Contractor’s information from his/her technical proposal.

FAR 52.211-10 Commencement, Prosecution and Completion of Work (APR 1984)

The contractor shall be required to (a) commence work under this contract within [ * ] calendar days after the date the contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than [ * ]. The time stated for completion shall include final cleanup of the premises.

* To be established at the Individual Project Task Order level.

Notice to Proceed

A Notice to Proceed will be issued in writing by the Contracting Officer or Contracting Officer's Representative (COR) for each task order. No work shall begin until receipt of this notice. Contract time shall commence on the day indicated on the Notice to Proceed.

Schedule for Task Order and Prosecution of Work

A. Task Order time will start on the effective date of the Notice to Proceed. Reference the Individual Task Order for when work shall begin.

B. The Contractor shall maintain progress at a rate which will assure completion within the task order time.

The rate of progress will be determined from the Contractor's proposed progress schedule which shall reflect total contract time. The proposed progress schedule shall be submitted at the time of the post award meeting (post award meeting) or may be requested with each task order. If Contractor's progress falls behind that scheduled, the Contractor shall take such action as necessary to improve his progress; in addition, the Contracting Officer may require Contractor to submit a revised schedule and proposed plan of work to ensure completion of the work within the time(s) set forth in the contract.

IDIQ Various Road and Heavy Equipment Services AG-05G1-S-16-0017 Colville National Forest Page 18

C. Work shall be scheduled to provide completion of segments on a daily basis unless otherwise herein provided. Refer to the Schedule of items for seasonal restrictions that will dictate the priority of units to be completed first.

D. A Work Schedule shall be prepared by the Contractor based on priorities provided in the task order unless superseded by the Contracting Officer in advance of work.

E. The Government reserves the right to prescribe the sequence of the work.

F. The Contracting Officer may require the Contractor to finish the portion in progress before additional work is started on any additional portion.

G. Task Order time, whether stated in terms of calendar days or a completion date, has made allowance for inclement weather, fire closure and seasonal shutdowns. Task Order time will run concurrently, if more than one task order is awarded to a Contractor, from issuance of the Notice to Proceed without suspension during periods when no work is performed. Contractor's progress will be measured against Contractor's approved progress schedule.

H. The Contractor shall use measures and precautions necessary to warn and protect the public and Government personnel and equipment during work at the project site. Such actions include, but are not limited to, furnishing and maintaining barricades and signs around the work site.

I. The Contracting Officer may, in writing, require the Contractor to remove from the work any employee found to be working in an unsafe manner.

Superintendence

One supervisor, conversant in the English language, shall be designated in writing by the Contractor for each crew. The written designation shall indicate the limits of the supervisor's authority. When two or more people are designated as supervisor, their written delegation shall indicate the priority of their designations so no more than one person shall be in charge of a crew at any one time.

Supplement to Suspension of Work

Whenever the Contracting Officer determines that the temperature, humidity, soil moisture, plant moisture stress, winds, or combination of these and other physical conditions have become unsuitable for project to continue in any area, the Contractor shall move the work force to another area(s) prescribed by the Contracting Officer. When no other area is available, the Contracting Officer will issue a suspend work order for the bid item and contract time will stop for that item. When conditions are again favorable, the Contracting Officer will issue a verbal resume work order and confirm the resumption in writing. Contract time will resume on the effective work resumption date. In all cases, the Contractor shall resume work within 3 calendar days after the effective work resumption date. It is the Contractor's responsibility to keep the Contracting Officer currently advised as to where the Contractor or the Contractor's Representative may be reached by telephone during periods of work suspension. If the Contractor cannot be reached at the telephone number provided, or if the Contractor fails to leave a number, a written resume work order will be mailed and contract time will resume on the date specified on the resume work order.

Colville National Forest Page 19

Contractor Quality Control Plan

A. Quality Control Plan. The Contractor shall provide a Quality Control Plan (QCP) as part of this Technical Proposal. The Plan must demonstrate how the Contractor will assure that quality of performance meets the objectives and requirements of the contract. The QCP shall specify:

1. How quality will be monitored to assure performance standards are met.

2. How the work will be supervised.

3. How results of the monitoring will result in quality performance.

4. Identify the personnel responsible for performing quality control.

B. Contractor Quality Control Inspection. The Contractor shall assure themselves that performance meets contract specifications, in accordance with clause FAR 52.212-4, Contract Terms and Conditions – Commercial Items, paragraph (a), Inspection/Acceptance prior to requesting the Government to inspect for payment or acceptance. The Contractor shall contact the Contracting Officer upon completion of a work area.

The Contracting Officer may observe the Contractor’s inspection at any time and shall otherwise have unlimited access to the inspection data.

Government Quality Assurance Surveillance Plan and Acceptance Requirements

A. Government Quality Assurance Inspection. The Government will, at its convenience, make periodic inspections of the work to assure itself of contract compliance and to perform Quality Assurance Inspections to determine confirm that the Contractor is performing quality control in accordance with its QCP and that Contractor monitoring results in quality performance of contract objectives.

B. Acceptance. Acceptance of the work under each task order will be made after steps in (a) above have been taken and the Contracting Officer has made the determination of satisfactory compliance with the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .