Amendment 0002 - Change in Quantity on Pardise Units
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| amend_0002_Paradise_Unit_Maps.pdf | ||
| Amend_0001.pdf | ||
| walkerMaps.pdf | ||
| Wage__Deter__1977_0209_45_06192013.pdf | ||
| HuckPerf.pdf | ||
| HuckWhipMaps.pdf | ||
| 2013_D2D4_Thinning_0019.pdf | ||
| BioPreferred_Product_Categories_June_2013.pdf | ||
| VicinityMaps.pdf | ||
| KF_LFR_Perf.pdf | ||
| KF_LFRmaps.pdf | ||
| walkerPerfReq.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0002, AG-05G1-S-13-0019, West Zone Whipfalling, Thinning, Piling etc., Colville National Forest, Page 1
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable) 0002 7/19/2013 648314
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA Forest Service
Colville National Forest 765 South Main
Colville, WA 99114
Contracting Officer Colville National Forest 765 South Main
Colville, WA 99114
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) ( ) 9A. AMENDMENT OF SOLICITATION NO.
AG-05G1-S-13-0019
West Zone Whipfalling, Thinning, Piling etc.
X 9B. DATED (SEE ITEM 11)
7/2/2013
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers X is extended, is not ex-tended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
( ) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
This solicitation is to correct the quantity of the Paradise Units and to revise the Paradise Unit Maps. The revised schedule of items and maps attached are hereby made part of this amendment. Pen and Ink Change: for the Paradise 100 unit change the quantity to 40 acres and for the Paradise 110 change the quantity to 63 on the Performance Requirement Summary Charts. Quotes are now due July 24, 2013 at 3:00 p.m.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Cathy VanAlyne
Contract Specialist
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.24
Amendment 0002, AG-05G1-S-13-0019, West Zone Whipfalling, Thinning, Piling etc., Colville National Forest, Page 2
SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
West Zone 2013 Tree Thinning, Piling, Fuel Reduction and Handline
Item Sub-item
Supplies/ Services Estimated Quantity
Unit Unit Price $ Total $$
Tree Thinning, Piling, Fuel Reduction and Handline Three Rivers and Republic Ranger District
Note: Unit prices shall be filled out on all sub-items. The Government may exercise the option on items E, F, G and H
D12A Base Item Whipfall
A.1 Huck 52 7 acres
A.2 Huck 26 10 acres
A.3 Huck 30 23 acres
A.4 Huck 48 6 acres
A.5 Huck 49 5 acres
A.6 Huck 50 1 acres
A.7 Huck 71 7 acres
Total Quote for Base Item D12A Huck
59 Subtotal =
D4B Base Item Precommercial Thinning and HandPiling on Some Units
B.1 Walker Stewardship 1 11 acres
B.2 Walker Stewardship 27 25 acres
B.3 Walker Stewardship 30 28 acres
B.4 Walker Stewardship 34 15 acres
B.5 Walker Stewardship 51 25 acres
B.6 Walker Stewardship 54 26 acres
B.7 Walker Stewardship 65 17 acres
B.8 Walker Stewardship 88 21 acres
B.9 Walker Stewardship 90 6 acres
B.10 Walker Stewardship 94 21 acres
B.11 Walker Stewardship 99 25 acres
B.12 Walker Stewardship 104 9 acres
Total Quote for Base Item D4B Walker Stewardship
229 Subtotal =
D12C Base Item Hazardous Fuel Thinning
C.1 KF LFR 715 21 acres
C.2 KF LFR 719 6 acres
C.3 KF LFR 719B 5 acres
C.4 KF LFR 720 46 acres
C.5 KF LFR 721 26 acres
C.6 KF LFR 722 24 acres
C.7 KF LFR 723 42 acres
C.8 KF LFR 724 37 acres
C.9 KF LFR 727 29 acres
C.10 KF LFR 736 30 acres
Amendment 0002, AG-05G1-S-13-0019, West Zone Whipfalling, Thinning, Piling etc., Colville National Forest, Page 3
C.11 KF LFR 748 2 acres
C.12 KF LFR 756 6 acres
C.13 KF North 565 86 acres
C.14 KF North 566 19 acres
Total Quote for Base Item D12C Hazardous Fuel
Thinning
379 Subtotal =
D12D Base Item Hazardous Fuel Piling
D.1 KF LFR 719B 5 acres
D.2 KF LFR 736 30 acres
D.3 KF LFR 748 2 acres
D.4 KF LFR 756 6 acres
D.5 KF North 566 19 acres
Total Quote for Base Item D12D Hazardous Fuel Piling
62 Subtotal =
Total Quote for All Base Items (D12A, D4B, D12C, D12D)
729 Subtotal =
D12E Optional Item Paradise
E.1 Paradise 100 40 acres
E.2 Paradise 110 63 acres
Total Quote for Optional Item D12E Paradise
103 Subtotal =
D12F Optional Item Hand Fireline*
F.1 KF LFR 736 5,500 Feet
D12G Optional Item Whipfall
G.1 Huck 10 19 acres
G.2 Huck 20 8 acres
G.3 Huck 29 52 acres
G.4 Huck 22 48 acres
Total Quote for Optional Item D12G Whipfall
127 Subtotal =
D12H Optional Item Precommercial Thinning and Handpiling on Some Units
H.1 Walker Stewardship 118 49 acres
H.2 Walker Stewardship 133 9 acres
H.3 Walker Stewardship 136 15 acres
H.4 Walker Stewardship 146 20 acres
H.5 Walker Stewardship 159 8 acres
H.6 Walker Stewardship 170 15 acres
H.7 Walker Stewardship 172 3 acres
Total Quote for Optional Item D12H Precommercial
Thinning
119 Subtotal =
Amendment 0002, AG-05G1-S-13-0019, West Zone Whipfalling, Thinning, Piling etc., Colville National Forest, Page 4
Total Price for All Items (Base and Optional Items)
1,078 Total Project Price
Note: Quoters must submit a unit price for all subunits within an item to be considered responsive.
FAR 52.217-7 Options for Increased Quantity – Separately Price Line Item (MAR 1989)
Applies to Items D12E, D12F, D12G, and D12H
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within June 1, 2015. Delivery of added items shall be at the rate provided by the Contractor’s quote.
Option Note:
Funding is currently available for all base items. However, if quotes come in higher than the Government estimate, funding may not be available for all base items. If award cannot be made to all the base items, the items left will become option items.
The Government may exercise the option item for additional or substituted acres accordance with unit prices
* Option Item D12F, Hand Fireline, the actual quantity will range from 4,700 to 5,500 feet.
Camping Permit
A camping permit to occupy the jobsite by contractor personnel will NOT be issued under this contract.
Technical Proposal
The Contractor’s technical proposal will become part of this contract.
System for Award Management (SAM)
No award will be made to a Contractor not registered in the System for Award Management (used to be know as the Central Contractor Registration (CCR) and the Online Representations and Certification Application
(ORCA) databases). Reference https://www.acquisition.gov.
File details come from the government source that posted it. Updated .