Amend_0002.pdf

PDF 537 KB Posted

Attached to
2013 Tree Thinning , Whipfalling, Handpiling, Fuels Reduction Federal contract opportunity
Solicitation number
AG-05G1-S-13-0019
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Amendment 0002 - Change in Quantity on Pardise Units

View the file

Other files for this federal contract opportunity

Other files attached to 2013 Tree Thinning , Whipfalling, Handpiling, Fuels Reduction, newest first.
File Type Posted
amend_0002_Paradise_Unit_Maps.pdf PDF
Amend_0001.pdf PDF
walkerMaps.pdf PDF
Wage__Deter__1977_0209_45_06192013.pdf PDF
HuckPerf.pdf PDF
HuckWhipMaps.pdf PDF
2013_D2D4_Thinning_0019.pdf PDF
BioPreferred_Product_Categories_June_2013.pdf PDF
VicinityMaps.pdf PDF
KF_LFR_Perf.pdf PDF
KF_LFRmaps.pdf PDF
walkerPerfReq.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0002, AG-05G1-S-13-0019, West Zone Whipfalling, Thinning, Piling etc., Colville National Forest, Page 1

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable) 0002 7/19/2013 648314

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

USDA Forest Service

Colville National Forest 765 South Main

Colville, WA 99114

Contracting Officer Colville National Forest 765 South Main

Colville, WA 99114

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) ( ) 9A. AMENDMENT OF SOLICITATION NO.

AG-05G1-S-13-0019

West Zone Whipfalling, Thinning, Piling etc.

X 9B. DATED (SEE ITEM 11)

7/2/2013

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers X is extended, is not ex-tended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

( ) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

This solicitation is to correct the quantity of the Paradise Units and to revise the Paradise Unit Maps. The revised schedule of items and maps attached are hereby made part of this amendment. Pen and Ink Change: for the Paradise 100 unit change the quantity to 40 acres and for the Paradise 110 change the quantity to 63 on the Performance Requirement Summary Charts. Quotes are now due July 24, 2013 at 3:00 p.m.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Cathy VanAlyne

Contract Specialist

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.24

Amendment 0002, AG-05G1-S-13-0019, West Zone Whipfalling, Thinning, Piling etc., Colville National Forest, Page 2

SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

West Zone 2013 Tree Thinning, Piling, Fuel Reduction and Handline

Item Sub-item

Supplies/ Services Estimated Quantity

Unit Unit Price $ Total $$

Tree Thinning, Piling, Fuel Reduction and Handline Three Rivers and Republic Ranger District

Note: Unit prices shall be filled out on all sub-items. The Government may exercise the option on items E, F, G and H

D12A Base Item Whipfall

A.1 Huck 52 7 acres

A.2 Huck 26 10 acres

A.3 Huck 30 23 acres

A.4 Huck 48 6 acres

A.5 Huck 49 5 acres

A.6 Huck 50 1 acres

A.7 Huck 71 7 acres

Total Quote for Base Item D12A Huck

59 Subtotal =

D4B Base Item Precommercial Thinning and HandPiling on Some Units

B.1 Walker Stewardship 1 11 acres

B.2 Walker Stewardship 27 25 acres

B.3 Walker Stewardship 30 28 acres

B.4 Walker Stewardship 34 15 acres

B.5 Walker Stewardship 51 25 acres

B.6 Walker Stewardship 54 26 acres

B.7 Walker Stewardship 65 17 acres

B.8 Walker Stewardship 88 21 acres

B.9 Walker Stewardship 90 6 acres

B.10 Walker Stewardship 94 21 acres

B.11 Walker Stewardship 99 25 acres

B.12 Walker Stewardship 104 9 acres

Total Quote for Base Item D4B Walker Stewardship

229 Subtotal =

D12C Base Item Hazardous Fuel Thinning

C.1 KF LFR 715 21 acres

C.2 KF LFR 719 6 acres

C.3 KF LFR 719B 5 acres

C.4 KF LFR 720 46 acres

C.5 KF LFR 721 26 acres

C.6 KF LFR 722 24 acres

C.7 KF LFR 723 42 acres

C.8 KF LFR 724 37 acres

C.9 KF LFR 727 29 acres

C.10 KF LFR 736 30 acres

Amendment 0002, AG-05G1-S-13-0019, West Zone Whipfalling, Thinning, Piling etc., Colville National Forest, Page 3

C.11 KF LFR 748 2 acres

C.12 KF LFR 756 6 acres

C.13 KF North 565 86 acres

C.14 KF North 566 19 acres

Total Quote for Base Item D12C Hazardous Fuel

Thinning

379 Subtotal =

D12D Base Item Hazardous Fuel Piling

D.1 KF LFR 719B 5 acres

D.2 KF LFR 736 30 acres

D.3 KF LFR 748 2 acres

D.4 KF LFR 756 6 acres

D.5 KF North 566 19 acres

Total Quote for Base Item D12D Hazardous Fuel Piling

62 Subtotal =

Total Quote for All Base Items (D12A, D4B, D12C, D12D)

729 Subtotal =

D12E Optional Item Paradise

E.1 Paradise 100 40 acres

E.2 Paradise 110 63 acres

Total Quote for Optional Item D12E Paradise

103 Subtotal =

D12F Optional Item Hand Fireline*

F.1 KF LFR 736 5,500 Feet

D12G Optional Item Whipfall

G.1 Huck 10 19 acres

G.2 Huck 20 8 acres

G.3 Huck 29 52 acres

G.4 Huck 22 48 acres

Total Quote for Optional Item D12G Whipfall

127 Subtotal =

D12H Optional Item Precommercial Thinning and Handpiling on Some Units

H.1 Walker Stewardship 118 49 acres

H.2 Walker Stewardship 133 9 acres

H.3 Walker Stewardship 136 15 acres

H.4 Walker Stewardship 146 20 acres

H.5 Walker Stewardship 159 8 acres

H.6 Walker Stewardship 170 15 acres

H.7 Walker Stewardship 172 3 acres

Total Quote for Optional Item D12H Precommercial

Thinning

119 Subtotal =

Amendment 0002, AG-05G1-S-13-0019, West Zone Whipfalling, Thinning, Piling etc., Colville National Forest, Page 4

Total Price for All Items (Base and Optional Items)

1,078 Total Project Price

Note: Quoters must submit a unit price for all subunits within an item to be considered responsive.

FAR 52.217-7 Options for Increased Quantity – Separately Price Line Item (MAR 1989)

Applies to Items D12E, D12F, D12G, and D12H

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within June 1, 2015. Delivery of added items shall be at the rate provided by the Contractor’s quote.

Option Note:

Funding is currently available for all base items. However, if quotes come in higher than the Government estimate, funding may not be available for all base items. If award cannot be made to all the base items, the items left will become option items.

The Government may exercise the option item for additional or substituted acres accordance with unit prices

* Option Item D12F, Hand Fireline, the actual quantity will range from 4,700 to 5,500 feet.

Camping Permit

A camping permit to occupy the jobsite by contractor personnel will NOT be issued under this contract.

Technical Proposal

The Contractor’s technical proposal will become part of this contract.

System for Award Management (SAM)

No award will be made to a Contractor not registered in the System for Award Management (used to be know as the Central Contractor Registration (CCR) and the Online Representations and Certification Application

(ORCA) databases). Reference https://www.acquisition.gov.

File details come from the government source that posted it. Updated .