Awning_Statement_of_Work.docx
DOCX document 15 KB Posted
- Attached to
- Awning Fabrication Federal contract opportunity
- Solicitation number
- AG-0521-S-16-0003
About this file
STATEMENT OF WORK
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Awning_Statement_of_Work.docx | DOCX document | |
| Adjacent_Building_to_Awning_Blue_Print.pdf | ||
| Provisions_and_Clauses.pdf | ||
| WA67.txt | TXT text file | |
| PCFS_covered_storage_awning.ppt | PPT presentation |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA-ARS Pullman, WA has a requirement to build a covered awning next to our existing covered storage building at 4153 Albion Rd, Pullman, WA 99163.
This structure should be -20 feet long, 20 foot roof peak, and a width of 48 foot span.
-Roofing is required to be an equal match to existing attached building roof, to maximum extent possible.
-The ground is asphalt with railroad iron inlaid at four distances from the building.
-The structure need to be self-supporting and withstand normal local weather conditions including; heavy snowfall, and high winds.
-The structure shall not impede the use of the sliding door located on the southeast side of the building.
-Rain gutters and downspouts are required to reach ground level to prevent rain splash. This can be tied into the two downspouts already on the building.
-Support columns on the road shall be protected with barriers to prevent vehicles from damaging this structure, or cement posts on the awning to protect from potential driving hazards.
-The north and east sides of the structure should be open to allow access and ventilation.
-The south side of the awning should be stabilized with a partial wall to keep winds from lifting the roof from the Southwest direction which is where most of our wind blows from during the year.
A Site visit is not required but highly recommended:
Location:
4153 Albion Rd Pullman, WA 99163
To schedule a site visit please contact:
Brian Fien: 509-335-3349, brian.fien@ars.usda.gov;
Bob Barry: 509-332-3925, bbarry@wsu.edu;
Larry McGrew: 509-334-3180, conyza@wsu.edu.
File details come from the government source that posted it. Updated .