DRAFTSpecList11072016.pdf
PDF 467 KB Posted
- Attached to
- Deer Creek Trail Bridge Federal contract opportunity
- Solicitation number
- AG-04T0-S-17-0003
About this file
DRAFT Specification List
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| NewWageRates.pdf | ||
| amend1.pdf | ||
| CompleteSolicitation.pdf | ||
| DRAFTSpecifications11072016.pdf | ||
| DRAFTDeerCreekTrailBridgePlans.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA FOREST SERVICE
FP-03 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS &
BRIDGES ON FEDERAL HIGHWAY PROJECTS,
FP-03 FS SUPPLEMENTAL SPECIFICATIONS (NATIONAL)
PROJECT NAME: DEER CREEK TRAIL BRIDGE
REPLACEMENT DRAFT
SPECIFICATION LIST
SPEC # FS SPECIFICATION LAST REVISION DATE:
Preface 3/15/2004 101 General Requirements 2003
101.01 Meaning of Terms 1/22/2009
101.03 Abbreviations 6/16/2006
101.04 Definitions 3/29/2007
102 Bid, Award, and Execution of Contract 2003
102.00 Bid, Award, and Execution of Contract 2/16/2005
103 Scope of Work 2003
103.00 Definitions 2/16/2005
104 Control of Work 2003
104.00 Deletions 6/16/2006
104.03 Specifications and Drawings 2/22/2005
104.06 Use of Roads by Contractor 2/17/2005
105 Control of Material 2003
105.02(a) Government-provided sources 3/29/05
105.02(b) Contractor-located sources 3/8/07
105.05 Use of Material Found in the Work 5/12/2004
106 Acceptance of Work 2003
106.01 Conformity with Contract Requirements 7/31/2007
106.07 Deletions 5/11/2004
107 Legal Relations and Responsibility to the Public 2003
107.05 Responsibility for Damage Claims 5/11/2004
107.06 Contractor’s Responsibility for Work 6/16/2006
107.09 Legal Relationship of the Parties 6/16/2006
107.10 Environmental Protection 6/16/2006
108 Prosecution and Progress 2003
108.00 Deletions 2/16/2005
109 Measurement of Payment 2003
109.00 Deletions 2/17/2005
109.02 Measurement Terms and Definitions 6/16/2006
151 Mobilization 2003
152 Construction Survey and Staking 2003
152.00 Construction Survey and Staking 8/05/2005
153 Contractor Quality Control 2003
153.02 Contractor Quality Control Plan 2/17/2005
153.04 Records 12/24/2007
155 Schedules for Construction Contracts 2003
155.00 Deletions 5/11/2004
156 Public Traffic 2003
DRAFT
156.00 Public Traffic 4/17/2007
157 Soil Erosion Control 2003
157.03 General 2/24/2005
170 Develop Water Supply and Watering 3/26/2007
171 Weed and Disease Prevention 3/30/2005
201 Clearing and Grubbing 2003
201.00 Deletions 8/5/2009
201.01 Description 2/18/2005
201.04 Clearing ( c ) 2/22/2005
201.06 Disposal 3/26/2007
202 Additional Clearing and Grubbing 2003
203 Removal of Structures and Obstructions 2003
203.01 Description 2/25/2005
203.05 Disposing of Materials 2/18/2005
204 Excavation and Embankment 2/26/2009
208 Structure Excavation and Backfill for Selected Major Structures 2003
208.04 General 8/5/2009
251 Riprap 2003
251.03 General 8/5/2009
251.08 Measurement 8/5/2009
252 Special Rock Embankmant and Rock Buttress 2003
272 Geocell Abutment Stabilization 3/29/2005
552 Structural Concrete 2003
552.02 Material 6/20/2007
554 Reinforcing Steel 2003
554.03 Order Lists 6/20/2007
555 Steel Structures 2003
555.03 General 6/8/2005
557 Timber Structures 2003
557.02 Materials 8/20/2012
571 Prefabricated Bridges 4/17/2014
635 Temporary Traffic Control 2003
635.03 General 5/13/2004
701 Cement 2003
705 Rock 2003
709 Reinforcing Steel 2003
709.01 Reinforcing Steel 7/3/2007
712 Joint Material 2003
716 Material for Timber Structures 2003
717 Structural Metal 2003
717.01 Structural Steel 8/5/2009
725 Micellaneous Material 2003
736 Geocell (need to add)