CompleteSolicitation.pdf
PDF 5 MB Posted
- Attached to
- Deer Creek Trail Bridge Federal contract opportunity
- Solicitation number
- AG-04T0-S-17-0003
About this file
Complete Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| NewWageRates.pdf | ||
| amend1.pdf | ||
| DRAFTSpecifications11072016.pdf | ||
| DRAFTSpecList11072016.pdf | ||
| DRAFTDeerCreekTrailBridgePlans.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-04T0-S-17-0003
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE
ISSUED
03/03/2017
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
832952
6. PROJECT NO.
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SIUSLAW NATIONAL FOREST
3200 SW JEFFERSON WAY
CORVALLIS, OREGON 97331
ATTN: CONTRACTING
SIUSLAW NATIONAL FOREST
3200 SW JEFFERSON WAY
CORVALLIS, OREGON 97331
9. FOR INFORMATION
CALL:
A. NAME
Contracting Officer
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 541.750.7116
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
Deer Creek Trail Bridge Replacement
Umpqua National Forest Diamond Lake Ranger District Douglas County, Oregon
Price Range (including Optional Items): The Government's estimate is between $250,000 and $500,000.
Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the solicitation’s closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs incurred.
11. The Contractor shall begin performance within 10 calendar days and complete it within 10/31/18 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT
BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and -0- copies to perform the work required are due at the place specified in Item 7 by 4:00 PM local time 04/04/2017 . If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e)
AG-04T0-S-17-0003
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed.
This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
PART I - SCHEDULE OF ITEMS
SECTION B – SERVICES AND PRICES
DEER CREEK TRAIL BRIDGE REPLACEMENT
Diamond Lake Ranger District Umpqua National Forest
Douglas County
B- 1 - SCHEDULE OF ITEMS
BASE ITEMS
ITEM NO. DESCRIPTION EST. QTY. PAY UNIT
UNIT
PRICE
TOTAL
PRICE
15101 Mobilization All Lump Sum n/a $________
15254 Construction staking, method 1, tolerance A
All Lump Sum n/a $________
15713 Soil erosion and pollution control All Lump Sum n/a $________
20455 Embankment construction, compaction method B
55* Cubic Yard
20801 Structure excavation 28* Cubic Yard $________ $________
25110a Hand placed riprap, class 4 (Government source) 26* Cubic Yard
25110b Hand placed riprap, class 4 (Government source)
4* Cubic Yard
27250 Geocell abutment stabilization, 8-inch depth
21* Square Yard
55201 Structural concrete, class A(AE) 4.6* Cubic Yard $________ $________
55703 Treated structural timber and lumber 2.10 MBF $________ $________
55705 Treated structural timber, glued-laminated
1.89 MBF
57101 Prefabricated bridge superstructure – design, fabricate, All Lump Sum n/a $________ deliver and install
60513 Geotextile material, type IV 320* Square Yard $________ $________
SUBTOTAL $________
OPTIONAL ITEMS
Optional Item #1
Treated Timber Running Planks 0.75 MBF $________ $________
Optional Item #2
Colored Concrete (Adobe 4 lbs 61078)
All
Lump Sum n/a $________
SUBTOTAL $_______
GRAND
TOTAL $__________
*Denotes Contract Quantities
B-2 - NOTE:
Facsimile offers are accepted; see Section L-3, however, Facsimile Bid Guarantee IS NOT acceptable.
Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Mobilization.
Payment will be made on actual work performed as described in FP-03 109.01, unless otherwise noted.
Exercise of Option Item #1 may be made by the Government at any time during the contract period.
Exercise of Option Item #2 may be made by the Government at any time during the contract period prior to pouring the concrete. See section I, 52.217-7, Option for Increased Quantity-Separately Priced Line item and Section M, 52.217-5, Evaluation of Options.
DUNS Number________________________
EMAIL ______________________________
WERE YOU REQUIRED TO FILE A VETS-4212 REPORT LAST YEAR?
(I.E. DID YOU/DO YOU HAVE ANY CONTRACT CONTAINING FEDERAL ACQUISITION
REGULATION CLAUSE 52.222-37, EMPLOYMENT REPORTS ON VETERANS; SEE
VETS-4212 WEBSITE: https://www.dol.gov/vets/vets4212.htm)
YES _____ NO _____
IF YES, PLEASE SUBMIT PROOF THAT YOUR REPORT WAS SUBMITTED TO DOL.
FAR 22.1302 (b) Except for contracts for commercial items or contracts that do not exceed the simplified acquisition threshold, contracting officers must not obligate or expend funds appropriated for the agency for a fiscal year to enter into a contract for the procurement of personal property and nonpersonal services (including construction) with a contractor that has not submitted the required annual VETS-4212, Federal Contractor Veterans' Employment Report (VETS-4212 Report), with respect to the preceding fiscal year if the contractor was subject to the reporting requirements of 38 U.S.C. 4212(d) for that fiscal year.
The estimated start work date is May 15, 2017. All work shall be completed by October 31, 2018.
For additional information, please contact Julie Jackson-Merritt at 541.957.3441.
Offers shall be submitted for the total item. Offers for less than the total item will not be considered.
If Offeror does not intend to charge for an item, a price of "0" or "NO COST" should be shown.
NOTE: Contractor MUST register in the Central Contractor Registration (CCR) data base and Online Representations and Certifications Applications (ORCA). These are now consolidated at the following site: https://www.sam.gov/portal/public/SAM/ https://www.dol.gov/vets/vets4212.htm https://www.sam.gov/portal/public/SAM/
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1 STATEMENT OF WORK/SPECIFICATIONS - AGAR 452.211-72 (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
Work includes:
Removal of two treated timber sills from the original bridge. Construction of an 84’-10” span steel truss bridge including the design, fabrication, delivery and installation. Construction of two 20’-2” span longitudinal glued-laminated approach bridges. Construction of the geocell foundations, precast concrete piers, and treated timber abutments. Placement of riprap armor, installation of a stone retaining wall, and excavation and placement of mineral material for approach embankment.
Clearing and grubbing is also included as well as construction staking. The use of a helicopter to aide in the construction is anticipated.
Biobased Information
The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.
The Contractor shall utilize products and material made from biobased materials (e.g., insulating foam, composite panels, and concrete and asphalt release fluids) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR).
The following is an example list of products that may be used in this contract for minor construction for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products meeting the health and environmental specifications.
Erosion Control Penetrating lubricants Greases
Biobased products that are designated for preferred procurement under USDA’s BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov.
In addition to the biobased products designated by the U.S. Department of Agriculture in the
BioPreferred Program, the Contractor is encouraged to use other commercially available biobased products.
The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification.
The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
C-2 PROJECT LOCATION
The project can be located as follows:
The project is located on the Diamond Lake Ranger District of the Umpqua National Forest. From Roseburg, Oregon travel east on State Highway 138E for 61 miles. Turn left onto Forest Service Road 34 (Toketee Rigdon Road toward Toketee Falls) and travel approximately 2.5 miles. Turn right onto Forest Service Road 3401. Travel on FS Road 3401 for approximately 2 miles and turn left into the Umpqua Hot Springs Trailhead. Cross the trail bridge and walk west (downriver) for approximately 1 mile on the North Umpqua Trail #1414 to the bridge site.
C-3 SPECIFICATIONS
AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF FEDERAL
SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS FPMR PART 101-29
(FAR 52.211-1) (AUG 1998)
(a) The GSA Index of Federal Specifications, Standards and Commercial Item Description, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to--
GSA Federal Supply Service Specifications Section, Suite 8100 470 East L'Enfant Plaza SW Washington, DC 20407 Telephone (202) 619-8925 Facsimile (202) 619-8978.
(b) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (a) of this provision. Additional copies will be issued for a fee.
(End of provision)
AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA INDEX OF
FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM
DESCRIPTIONS (FAR 52.211-3) (JUN 1988)
The specifications cited in this solicitation may be obtained from:
Specification Address
Standards Specifications for Available online at Construction of Roads and Bridges https://flh.fhwa.dot.gov/resources/specs/fp-03/ On Federal Highway Projects FP-03 U.S. Customary Units
ASTM Standards American Society for Testing and Materials 1916 Race Street Philadelphia, PA 19103
(215) 199-5462
AASHTO Standards American Association of State Highway and
Transportation Officials 341 National Press Building Washington, D.C. 20024
The request should identify the solicitation number and the specification requested by date, title, and number, as cited in the solicitation.
(End of clause)
C-4 SUBMITTALS, SHOP DRAWINGS, MATERIAL CERTIFICATIONS AND TESTING
REPORTS
Submittals shall include the following unless otherwise required in the specification:
1. Date and revision dates.
2. Project name and contract number.
3. Names of Contractor, subcontractor, supplier, and manufacturer.
4. Specifications section number.
5. Field dimensions and relation to adjacent structures.
6. Applicable standards such as ASTM or Federal Specifications.
7. Contractor's stamp, initial or signature, certifying the review of submittal, verification of field measurements and compliance with contract documents. Provide all submittals within 14 calendar days of contract award unless otherwise required by the specification.
https://flh.fhwa.dot.gov/resources/specs/fp-03/
C-5 SHOP DRAWINGS
The following shop drawings shall be submitted on this project:
Title Referenced by
Specification No Time of Government Review
After Submittal Shop Drawings and Calculations for Prefabricated Bridge
104.03(b)(1)(j) & FSSS 571 21 Days. Submit prior to Sept 30, 2017
Shop Drawing for all timber bridge components
Plans Sheet 4 of 10 14 Days. Submit prior to Sept 30, 2017.
As-Built Plans FSSS 104.03 (c) N/A
C-6 SUBMITTALS, MATERIAL CERTIFICATIONS, AND TESTING REPORTS
The following submittals, material certifications, and/or testing reports shall be submitted on this project:
Title Referenced by
Specification No Time of Government Review After Submittal
Designation of Representative FAR 52.236-6 N/A Drug Free Workplace Policy FAR 52.223-6 N/A SF1413 Statement and Acknowledgement for each Subcontractor
FAR 52.236-11 N/A
Payroll Record Certified Payrolls submitted weekly
FAR 52.222-8 N/A
Hazardous Spill Plan FSSS 107.10 14 Days Quality Control Plan 153.02 14 Days Traffic Control Plan FSSS 156 & 635 14 Days Safety Plan Certification FAR 52.236-13 & H-1 14 Days Erosion & Pollution Control Plan
157.03 and FSSS 157.03 14 Days
Pilots and Aircraft Certifications
Section C 14 Days
Fire Plan Section J 14 Days Project Work Schedule FAR 52.236-15 14 Days Concrete Mix Design including Admixtures
FSSS 552.03 & 552.09 14 Days
Pre-Concrete Placement Conference
FSSS 552.09 14 Days
Portland Cement Production Certification
552.19 14 Days
Concrete Quality Control Certifications, including batch tickets and test results
552.09 & 106 N/A
Reinforcing Steel Production Certification
554.10 N/A
Structural Steel Certified Test Results
a. Steel Specified by AASHTO Designation
Steel Specified by ASTM Designation
555.20
555.05, 557, 717.01 & Plans
555.05 & Plans
14 Days
Structural Steel Fabrication by AISC Quality Certification Program
555.03 14 Days
Certified Bridge Welder 555.03 FSSS 571 & Plans N/A Supplier and/or inspection agency certifications of wood species, grade, treatment and BMP’s
557, FSSS 557.02, 716, FSSS
571 and Plans
N/A
Bridge Installation Instructions FSSS 571 5 days prior to installation Bridge Erection Plan Plans Sheet 4 of 10 14 Days Bridge Maintenance Procedures
FSSS 571 N/A
Bridge Manufacturing Warranty
FSSS 571 N/A
Aircraft Use Report
Section C N/A
Geotextile Certification 605 N/A Geocell Certification 272 N/A Disposal Agreement for Treated Timber
Plans Sheet 3 of 10 N/A
Product and Material Certifications
As required by Specifications 14 Days
C-7 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS - AGAR
452.211-73 (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
C-8 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES
ON FEDERAL HIGHWAY PROJECTS FP-03 U.S. CUSTOMARY UNITS
The Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 U.S. Customary Units are included by reference. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract.
(a) Section 100 through 149 of the Standard Specification and all other Standard or Supplemental Specifications shown in the specification listing are applicable to this contract. All specifications not included in the specification listing, but referenced by listed specifications, are applicable. The Supplemental Specifications shown on the specification list are physically attached in Section J.
(b) See the following for the specification lists and supplemental specifications. Attached in Section J.
C-9 AIRCRAFT USE
The contractor shall advise the CO of any intent to utilize aircraft in the performance of this contract at least 30 calendar days prior to planned use.
C-9.1 Certifications and Operations
If whole or part of the work utilizes aircraft to accomplish the end product then the Contractor or the Subcontractor shall be currently certified by the FAA and operate under Federal Aviation Regulation Aircraft Operations.
The contractor will certify that:
A. Pilots and Aircraft are currently certified and licensed under the FAA and operate under Federal Aviation Administration (CFR 14), as applicable, to perform the proposed work:
Part 133 for external load operations Part 135 for transport of personnel Part 137 for agriculture operations
B. Contractors and pilots will perform in accordance with Part 91, “for hire” standards (FAR 91.409), for work that does not require specific FAA certificates or authorizations.
C. Contractors will report any condition, observance, maintenance problem, act or circumstance which has the potential to cause an aviation-related mishap to the CO and/or COTR. The CO or COTR will notify the Local Unit Aviation Officer to confirm the need for filling a SAFECOM (Aviation Safety Communique, Form FS 5700-14, January 96).
D. Contractor's flight crews and aviation related ground personnel shall wear personal protective equipment as specified by Industry and State Occupational Safety and Health Standards.
E. The Government shall provide the Contractor, Government-furnished property described as follows:
1. Maps of project locations including pre-approved landing location.
2. There may be special flight routes designated due to sensitive areas, water sources and identified known hazards. These will be designated and provided on project hazard maps.
3. The Contractor is responsible for all clean up of fuel, oil, and/or contamination on airport ramps, retardant sites, parking areas, landing areas, etc., when caused by Contractor equipment or personnel.
C-9.2 Contractor’s Obligations
The Contractor shall furnish all labor, supervision, transportation, materials, tools, supplies, and incidentals required to accomplish contract objectives, unless specified as Government responsibility elsewhere herein, including but not limited to:
A. The Contractor is responsible to retrieve any lost loads (dropped or jettisoned) during the operation of this contract and shall be responsible for any damages that occur as a result (directly or indirectly) of dropping or jettisoning of such loads.
B. Radio communications with the aircraft shall be maintained at all times during flights operations.
The Contractor shall provide the frequency they will be using. The contractor shall monitor the Forest Service frequency for emergency or potential aircraft conflicts.
C. Equipment move-in, move-out, moves of ground equipment as well as transportation for all Contractor –furnished materials between service areas. Contractor shall be responsible for safety precautions, dust abatement measures and fuel hazardous waste spill response.
D. Dust abatement methods and materials must meet Government approved necessary for safe operations. Material other than water will require approval by the Contracting Officer before application.
E. Identification and removal of hazard trees or snags as needed to assure safe operations within the project area prior to beginning yarding operations. Hazard tree or snag removal is subject to the Contracting Officer's approval. Directional felling of hazard trees or snags will be required.
F. Furnish adequate safety warning signs and flaggers with communication frequencies separate from air to ground when operations will be transecting roads, trails or other identified access routes.
G. The Contractor is responsible to ensure that all activities do not cause environmental damage to property or facilities. The Contractor is responsible to clean and rehabilitate areas adversely affected by Contractor activities and shall, whenever practical and possible, utilize solvents and cleaning agents that are either biodegradable or consistent with acceptable safety, health and environmental concern practices.
C-9.3 Equipment
Equipment shall be furnished on a fully-operating basis, of modern design and in good operating condition.
C-9.4 Contractor Aviation Requirements
If an aircraft is used to complete the project, the Contractor shall submit to the Contracting Officer a report of aircraft use in the following format.
| AIRCRAFT USE REPORT
| Contractor Name: ____________________________________________ | | Project: Deer Creek Trail Bridge Replacement Contract | | Contract Number ___________________________________ | | A I R C R A F T Flight | Type Make and Model FAA Number Hours
SECTION D - PACKAGING AND MARKING
For this solicitation, there are NO clauses in this Section
SECTION E - INSPECTION AND ACCEPTANCE
E-1 CLAUSES INCORPORATED BY REFERENCE (FAR 52.252-2)(FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (APR 1996)
E-2 INSPECTION AND ACCEPTANCE (AGAR 452.246-70) (FEB 1988)
(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.
(b) Inspection and acceptance will be performed at the project site.
E-3 INSPECTION AND TESTING PERFORMED BY GOVERNMENT
The Government will perform sampling, testing and inspection of work in progress where these responsibilities are not expressly assigned to the Contractor by the Forest Service specifications or by the Supplemental Specifications.
E-4 CONFORMITY WITH PLANS AND SPECIFICATIONS
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Plans, indicated in the specifications, or designated on the ground.
"Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.
http://www.arnet.gov/far/
SECTION F - DELIVERIES OR PERFORMANCE
F-1 CLAUSES INCORPORATED BY REFERENCE (FAR 52.252-2)(FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
Also, the full text of a clause may be accessed electronically at this/these address(es):
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
F-2 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (52.211-
10)(APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 days calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 31 October 2018. The time stated for completion shall include final cleanup of the premises.
F-3 PERIOD OF CONTRACT
Item Estimated Beginning Date Contract Time (Calendar Days)
1 May 15, 2017 By 31 October 2018
F-4 SUSPENSIONS OF WORK FOR OTHER THAN GOVERNMENT'S
CONVENIENCE
The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of: (1) weather or ground conditions when further prosecution of the work might cause environmental or resource damage to the project, access roads to the project, or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to be muddy or unsuitable; or (2) failure of the Contractor to comply with specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those
AG-04T0-S-17-0003
specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements, or when conditions exist which do not meet safety requirements. Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by its operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall not be considered as suspensions for the Convenience of the Government under FAR 52.242-14, Suspension of Work, and shall not qualify for an equitable adjustment.
SECTION G - CONTRACT ADMINISTRATION DATA
G-1 POST AWARD CONFERENCE (AGAR 452.215-73) (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within 15 days after the date of contract award. The conference will be held at a mutually agreed upon location.
G-2 DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE
The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract. The Contracting Officer should be informed as soon as possible or any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)
On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
G-3 GOVERNMENT-FURNISHED PROPERTY
Item No. Description Quantity Delivery Date
20455 Embankment Material As needed *Material is on site 25110a Class 4 Riprap As needed *Material about 500’ SE from site 25110b Class 4 Riprap As needed *Material about 500’ SE from site *Riprap and Embankment material may be obtained on site from the existing bridge approach and areas designated by the COR and on the plans. Scattered riprap may also be obtained from the west access trail within 5’ of the trail centerline. Maintain a natural appearance of the riprap borrow sources.
Staging Area at HO3005 As needed **Coordinate with COR Staging Area at West Entrance trail access, near Hot Springs Road Bridge on Road 3401 Within disturbed area, safety fencing to be installed Free parking permit provided **Coordinate with COR Staging Area at Hot Springs Trailhead, 10’ x 20’ near CXT toilet for no more than 12 hour period in a 24 hour period on Mondays through Thursdays.
Free parking permit provided **Coordinate with COR Helispots: **Coordinate with COR HO3005, Toketee Airstrip, Lemolo Forebay #1.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H-1 POTENTIAL SAFETY HAZARDS
(a) Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all-inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the worksite.
(b) The following conditions have been identified as inherently hazardous to a degree that failure to take the proper precautions could lead to serious injury or loss of life. This listing shall not be construed as all inclusive. The Contractor shall certify that his/her Safety Plan conforms to the requirements of 29 CFR 1910 and 1926 and the clause entitled Accident Prevention (FAR 52.236.13) included herein. The Safety Plan certification shall be submitted prior to commencing work on the project. Appropriate actions shall be taken by the Contractor to implement this plan during performance and to take any and all other necessary steps to mitigate the dangers from hazard.
[X] Helicopter Operations.
[X] Temporary excavation/deep trenching/slope stability.
[X] Tree falling.
[X] Fall hazard from work heights exceeding six feet.
[X] Swift water.
[X] Heavy equipment operation.
[X] Tree climbing and/or tower climbing.
[X] Fire hazards.
[X] Hydraulic and/or pneumatic and/or other high pressure hazards.
[X] Mechanical hazards such as pulleys, springs, etc.
[X ] Handling treated timber.
H-2 INDUSTRIAL CAMPS
Forest Service regulations for Use of Campgrounds prohibit occupancy of developed recreation sites for other than primarily recreation purposes. No industrial camping will be authorized at these sites.
One self-contained camp unit will be allowed at each staging area and equipment or supply dump for use by a watchman. Overnight camping at the bridge site is allowed during construction activities and shall follow back country sanitation protocals.
H-3 SALVAGE RIGHTS
No Contractor salvage rights exist under the contract unless specifically provided elsewhere herein.
H-4 SPECIAL EQUIPMENT CLEANING REQUIREMENTS
All earth moving equipment (loaders, excavators, dump trucks, etc.) moved to the job site shall be cleaned of weeds and their seeds prior to each entrance onto the National Forest lands. Cleaning shall consist of the removal of all dirt, grease, debris, and materials that may harbor noxious weeds and their seeds. This may require the use of a pressure hose.
Equipment shall be made available for visual inspection by the Forest Service prior to entering Forest Service lands. The Contractor shall advise of a proposed date for mobilization. Inspections will take place at mutually agreeable en-route locations in advance of entry onto National Forest lands.
The Contractor shall take special care under this contract to prevent contamination of water at the work sites with any petroleum residues from mechanical equipment operations. This shall include daily inspection and cleaning as appropriate.
H-5 PHYSICAL DATA (FAR 52.236-4) (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the Plans and in the specifications are the result of site investigations by surveys.
(b) Weather conditions: Snow may be expected between late December and early May. High creek flows occur around that same period of time. Sometimes IFPL IV occurs in this area in August and September.
(c) Transportation facilities: Road access to this area is typically closed due to snow from late December to early May. However many people hike or snowshoe into the Umpqua Hot Springs. All the Forest Service Road Bridges on the route are capable of carrying Highway Legal Loads (ODOT Weight Table 1). Expect higher traffic volume and congestion on weekends at the Umpqua Hot Springs Trailhead. Forest Service Road 3401 is susceptible to potholing.
H-6 LANDSCAPE PRESERVATION
(a) Prior to excavation, the Contractor shall remove the organic surface layer of soil, including decayed woody debris, grass, and small plants within the clearing limits, stockpile separately and redistribute these materials over the finished slopes and borrow sources on the project as directed by the Contracting Officer. Where practical, remove with a smooth-edged excavator bucket or other similar tool that is capable of separating the upper organic layer of soil from the lower soil. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawn, or natural features not designated for treatment. The Contractor shall confine operations to within the clearing limits or other areas designated in the contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
(b) Prevention of Oil Spills. If the Contractor maintains storage facilities for oil or oil products on site, appropriate preventive measures shall be taken to insure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual states. If a spill of petroleum product should occur in water, the Contractor shall take immediate action to clean up or contain the spill, then immediately notify the Engineer/COR and the Oregon Emergency Response System (OERS), telephone 1-800-452-0311 or 1-503-378-4124, and then immediately notify the Contracting Officer.
Contractor shall have a SPILL RESPONSE KIT on the project whenever equipment is operating.
The spill kit shall be sufficient to absorb 34 gallons of oil, designed to float on the surface, while absorbing oil and repelling water. The KIT shall meet or exceed the physical properties of “New Pig Products Spill Kit #408”. A spill response kit is required at the project site location and at the helispot (when in use).
Oil absorbing mats are required under all stationary equipment, or equipment being serviced within the Forest Boundary to prevent leaking or spilled petroleum base products from contaminating soil and water resources. Such material will be furnished by Contactor and approved by Contracting Officer.
Servicing of all equipment shall be done only in the areas approved by the Contracting Officer. If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.
Equipment shall be furnished on a fully operational basis, of modern design and in good operating condition with no fuel or oil leaks. Repairs and move-in/move-out are the Contractor’s responsibility. All equipment shall be power washed and shall be clean prior to entering Forest Service Land.
Maintenance and refueling of the equipment shall take place a minimum of 75 feet away from the stream and within an impervious retention basin having 150% of the containers capacity. Small trail building equipment for use within the stream or channel shall have vegetable based hydraulic fluid.
(c) No objectionable material shall be allowed to enter any stream, river, lake, or other body of water. Material which falls in these areas shall be retrieved and disposed of, or incorporated in the work as directed by the Contracting Officer, and damage to vegetation or structures outside the project limits shall be repaired as directed by the Contracting Officer. Monitor the turbidity of the stream and take immediate action to mitigate the turbidity.
(d) The Contractor shall not operate equipment or otherwise disturb the natural vegetation and soil beyond the areas flagged on the ground or beyond two feet from edge of the trail, top of cuts, or toe of fills. The Contractor may improve the trail access to a maximum tread width of 40”, using standard trail maintenace practices. From the West trail access, a notch may be cut at the base of the dead trees to achieve 40” tread width as directed by the Contracting Officer.
(e) The Contractor will make every reasonable attempt to preserve the scenic and natural environment along this construction project.
(f) Prior to the start of construction the Contractor shall submit to the Engineer/COR a schedule and plan for temporary pollution control measures for the following phases of work:
(i) Item 15101, Mobilization including Maintenance and Refueling Equipment, Trail Access Improvements, Removal of Existing Sills.
(ii) Item 20455, Embankment Construction
(iii) Item 20801, Structure Excavation
H-7 MOISTURE SENSITIVE SOILS
Contractors are cautioned that the roadway structure is designed so that the completed road will support highway legal loads during a limited use season. Construction equipment often subjects the uncompleted roadway structure to loadings it is not designed to support. This is especially critical during periods of excessive moisture and will require careful selection and scheduling to permit efficient operation. Any damage resulting from operations which renders the material unsuitable for use or results in potential siltation of streams will be corrected by the Contractor at its expense.
H-8 VALUE ENGINEERING
Value engineering change proposals which change the service or function of a facility or produce irreconcilable conflicts with management objectives will not be considered.
The following work is excluded from consideration under the Value Engineering clause:
NONE
H-9 PRODUCT SUBSTITUTION
Any modification of items, designs, materials, products or equipment (including Government- Furnished property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.
H-10 ROAD USE AND MAINTENANCE
Use of Roads
(a) The Contractor is authorized to use roads in the immediate construction project area for performance of work under this contract. The authorization is limited to roads necessary for direct access between the construction area and storage sites, disposal areas, and other work areas designated in the contract.
(b) The Contractor shall be responsible for and perform road maintenance commensurate with their use of Forest Service roads in the construction area.
The roads authorized for use are subject to the following provisions:
1. The Road Rules in the current Umpqua National Forest Road Rules Document are applicable to all commercial road users and is available for inspection at the Umpqua National Forest Supervisor's Offices.
2. State laws governing traffic rules and equipment requirements on State and County highways.
3. Federal Regulations contained in 36 CFR 261.12. These regulations prohibit use of vehicles or equipment in excess of State legal highway loads or posted limits without valid State or Forest Service overload permits, damaging a road while using it, and blocking a road open to use by others, except as may otherwise be provided in the contract.
4. Federal Regulations contained in 36 CFR 261.54 as applied to the area by an order issued under 36 CFR 261.50. These regulations authorized the Forest Service as a sovereign act, to issue additional restrictions and closures any time conditions warrant. Such closures will be in addition to those shown in the current Road Rules Document and will be posted on the road.
5. Unless otherwise provided, the Government will not snowplow roads for the Contractor's use.
The Contractor may snowplow any road designated for its use, unless snowplowing of the road is prohibited below or in the Road Rules Document. On roads where snowplowing is authorized, a permit defining snowplowing requirements is required. The Contractor will be responsible for repair of any damage to the road structure caused by the snow removal operations. Vehicles, other than conventional over-the-snow vehicles (snowmobiles), will not be permitted to use roads when there is an average uncompacted depth of more than 4 inches of snow unless the road has been snowplowed.
H-11 TRAFFIC CONTROL
The Contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness.
Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagman and pilot car operators and equipment, and other protective devices, except for special devices, shall conform to Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.
H-12 CONTROL OF MATERIAL
A Rights In and Use of Materials: The Contractor may use on the project suitable stone, gravel, or sand encountered in the excavation.
B Excavation: Unclassified.
C Material Sources:
1. Borrow sources of local mineral materials are designated on the drawings with the exception of the riprap source (approximately 500’ SE of bridge site). The Government assumes responsibility for the quality and quantity of material in the source. The Contractor shall determine the equipment and work required to produce the specified product. On the ground limits of the borrow source must be approved in advance by the Contracting Officer. Such borrow sources shall be restored to a natural appearance.
2. Native timber material used in temporary construction shall be approved, in writing by the Contracting Officer, prior to cutting and/or use. Felled trees are to remain in as long of lengths as practical. Stumps resulting from tree cutting shall be flush cut as reasonable close to the ground as practical (less than 6” height) and sloped away from trail user views. All debris resulting from preparation of the native timber for use, shall be scattered not more than four (4) inches in depth and out of meadows, stream courses, lakes and ponds, unless otherwise approved.
3. Rocks and mineral soil excavated within the normal excavation shall be conserved and used as needed.
D Storage and Stockpiling of Materials: Materials shall be stored to assure the preservation of quality and fitness for the work. Stored materials shall be located to facilitate their prompt inspection. Sites on Forest Service administered land, approved by the Forest Service, may be used for storage purposes and for the placing of Contractor's plant equipment. All storage sites provided by the Forest Service shall be restored at the Contractor's expense. Contractor shall be responsible for making arrangements for storage on other than Forest Service administered lands.
E Local Disposal Sites: There are no designated disposal sites for this project.
F Earthwork Tolerances:
1. Changes within specified tolerances (such as adjustment of horizontal or vertical alignment) shall be made as necessary to maintain earthwork quantities substantially as designed within balance points. Such adjustments shall not be considered as "Changes" under Clause 52.243-5.
2. Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Plans, indicated in the specifications, or designated on the ground.
"Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.
H-13 CONSTRUCTION STAKES, LINES, AND GRADES
(a) Survey monuments have been set and are shown on the plans. The survey control monuments constitute the field control from which the Contractor shall execute the work, and shall be left in place until the Engineer approves their removal.
(b) The Contractor shall do all further surveying, staking, and engineering to establish the horizontal and vertical control necessary to result in having the finished work comply with the lines and grades shown on the Plans or stated in the specifications.
(c) If any construction control points have been destroyed or displaced, or are erroneous, the Contractor shall promptly notify the Engineer. If these points are destroyed or displaced due to Contractor's negligence or operation, the cost for replacing them will be charged to the Contractor.
(d) In case of any construction changes, the Contractor shall cooperate with the Engineer and facilitate the prompt reestablishment of the field control for the adjusted work.
H-14 PROSECUTION OF WORK
(a) Construction activity shall be limited to the hours between 7:00 a.m. and 7:00 p.m., Monday through Friday, unless other hours/days are approved in writing by the Contracting Officer. The Contractor shall conduct activities so that interference with the public shall be kept at a minimum, especially near the Umpqua Hot Springs Trailhead. The project site is posted to exclude the public, however many trail users ford the creek at their own risk. To protect the public, the contractor shall post the trail closed 200’ on each side of the bridge site, during construction activities. Any activities requiring restricted public access shall be scheduled with the COR at least 14 days in advance.
(b) The Contractor shall use measures and precautions necessary to warn and protect the public and Government personnel during work at the project site. Such actions include, but are not limited to, furnishing and maintaining barricades and signs around the work site and roping off the area.
(c) Blasting Precautions and Methods - Blasting is not permitted on this project.
(d) The use of mechanized equipment such as power saws, power rock drills, motorcycles, motorized wheelbarrows, and small trail equipment, is allowed. The existing trail tread may be improved to a maximum width of 40 inches using standard trail maintenance techniques. See LANDSCAPE PRESERVATION Clause for additional information.
(e) Complete all in-water activities between June 15 and October 15, except as otherwise approved by the CO. In-stream materials (cobbles and boulders) may be used for temporary construction, however shall be re-deposited back into the stream in a natural appearance.
(f) Helicopter use is allowed. Hovering or lifting within 500 feet of the ground at the bridge site is prohibited for the following conditions:
• Helicopters with a Certified Maximum Gross Takeoff / Landing Weight of 12,501+ pounds are prohibited between March 1st and September 30th (allowed only between October 1st to February 28th).
• Helicopters with a…
This is the start of the file's text. The full file is on GovTribe.