4_Horsfall-ProjectPlans-AG04T0S160032.pdf

PDF 966 KB Posted

Attached to
Horsfall Beach Septic System Replacement Federal contract opportunity
Solicitation number
AG-04T0-S-16-0032
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Project Plans AG-04T0-S-16-0032

View the file

Other files for this federal contract opportunity

Other files attached to Horsfall Beach Septic System Replacement, newest first.
File Type Posted
2_Horsfall-ReturnPacket-AG04T0S160032.pdf PDF
5_Horsfall-ProjectSpecifications-AG04T0S160032.pdf PDF
3_Horsfall-StatementOfWork-AG04T0S160032.pdf PDF
1_Horsfall-SolicitationPacket-AG04T0S160032.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D R

A I N

F I E

L D

GRAVITY FED SEWER LINES

(REMOVE)

DISTRIBUTION BOX

(REMOVE)

UTILITY BOX

(PRESERVE)

HOST SITE

R

A

M

P

T

R

A

I L

15 14 13 12 11 10

16 17 18 19 20

21 22

T

O

F

R

O

H

I G

H

W

Y

W W

W

W

W

W

WW

WW

W

W

W

E

E

W

E

EE

E

E

LEGEND:

Restrooms

Drinking Water

Campsite Number

Reserved for Handicapped

Trail

Underground Waterline

Underground Electrical

W

E

CONCRETE SEPTIC TANKS,

1500 GALLON CAPACITY EACH

(REMOVE)

Parking Bumper

RESTROOM BUILDING

2 5

H O

R S

F A

L

B

E A

C

S

P

T

S

T E

M

R

E P

L A

C E

M E

N T

L A

Y O

U T

O

F

E

X I S

T I N

G

F

A C

I L

I T

I E

S

BEACH ACCESS

BEACH ACCESS

LAYOUT OF EXISTING FACILITIES

NOTES:

LOCATION OF EXISTING UNDERGROUND UTILITIES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL

BE RESPONSIBLE FOR LOCATING AND PRESERVING UTILITIES AND OTHER IMPROVEMENTS NOT

DESIGNATED TO BE REMOVED UNDER THE WORK OF THIS CONTRACT. MUST CALL 811 FOR ELECTRIC

SERVICE LOCATE PRIOR TO DIGGING.

PROPERLY DECOMMISSION THE EXISTING SEPTIC SYSTEM IN ACCORDANCE WITH OAR 340-071-0185.

REFER TO THE PROJECT SPECIFICATIONS AND STATEMENT OF WORK FOR ADDITIONAL DETAILS.

GRAVITY FED SEWER LINES

(REMOVE)

ELECTRICAL SERVICE ENTRANCE

(PRESERVE)

NOT TO SCALE

T R

A I L

RV SERVICE PIPE

(PRESERVE)

M a g

3000 GALLON PRIMARY SEPTIC TANK

a g

PROPOSED SITE PLAN

NOT TO SCALE

REPLACE EXISTING CLEANOUT;

MATCH EXISTING ELEVATION

ELECTRICAL SERVICE

ENTRANCE

RV SEWAGE DRAIN, CONNECT TO NEW PIPE

BOTTOMLESS SAND FILTER,

26' X 70' INTERIOR DIMENSIONS

UTILITY BOX (PRESERVE)

3000 GALLON "CLARIFIER"

SEPTIC TANK WITH BIOFILTER

PARKING LOT

" DIAMETER, SCHEDULE 40 PVC MANIFOLD

LINES BETWEEN THE ADV AND LATERALS

" SCHEDULE 80 PVC PIPE, PRESSURIZED EFFLUENT LINE

" DIAMETER, CLASS 200 PIPE LATERALS, SPACED 24" BETWEEN ROWS

ORIFICES SHALL BE SPACED 24" ON CENTER ALONG THE LATERALS.

2000 GALLON DOSING TANK WITH BIOTUBE PUMP VAULT;

REFER TO SHEET 5 FOR ADDITIONAL DETAILS

NOTES:

1. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ACTUAL DISTANCES AND

SPACING OF COMPONENTS ON THE GROUND.

2. CONTRACTOR SHALL CAST A PIPE SECTION SLEEVE INTO THE CONCRETE WALL OF THE

SAND FILTER FOR THE PIPE PENETRATION, AS SHOWN ON SHEET 4.

3. ALLOW FIVE (5) FEET BETWEEN THE NEAREST POINTS OF ADJACENT SEPTIC TANKS, AND

STEP DOWN

" PER FOOT FROM THE OUTLET OF ONE TANK TO THE INLET OF THE NEXT.

4. AT A MINIMUM, CONTRACTOR SHALL PROVIDE AND INSTALL 780 LINEAR FEET OF PIPING

FOR THE LATERALS: SIX (6) ZONES WITH TWO (2) LATERALS EACH, EACH LATERAL AT

LEAST 65 FEET LONG.

5. ORIFICES IN DRAINFIELD LATERALS SHALL BE

" IN DIAMETER, AND EACH ORIFICE SHALL

BE FITTED WITH AN ORIFICE SHIELD. TO AVOID ERRORS AND INCONSISTENCY, AND TO

UPHOLD WARRANTY TERMS, CONTRACTOR SHALL PROVIDE PRE-MANUFACTURED

DRAINFIELD LATERALS. CONTRACTOR IS NOT PERMITTED TO DRILL THEIR OWN

ORIFICES.

6. PROVIDE LABOR AND MATERIALS NEEDED TO CONNECT THE CAMP HOST WASTEWATER

LINE TO THE NEW SEPTIC SYSTEM.

7. SAWCUT AND REMOVE CONCRETE PATHWAY ALONG THE EAST SIDE OF THE RESTROOM

BUILDING, AS SHOWN IN THE HATCH PATTERN. THE AREA OF THE SIDEWALK TO BE

REMOVED IS APPROXIMATELY 24' LONG BY 3' WIDE. THE EXISTING CONCRETE IS BADLY

DAMAGED AND CREATING A TRIPPING HAZARD. REPLACE THE REMOVED PORTION OF

CONCRETE WITH

"- MINUS CRUSHED AGGREGATE BASE MATERIAL, 6" COMPACTED

DEPTH, WITH GEOTEXTILE FILTER FABRIC UNDERNEATH. SLOPE 2% TO DRAIN.

8. REFER TO THE PROJECT SPECIFICATIONS FOR ADDITIONAL DETAILS ON COMPONENTS.

FLUSHING VALVE AND VALVE BOX,

ONE PER LATERAL, TWELVE TOTAL

3 5

H O

R S

F A

A

P

T

S

T E

M

R

E P

L A

C E

M E

N T

S I T

E

P

L A

N

O

F

P

R O

P O

S E

D

I M

P R

O V

E M

E N

T S

NEW 6" DIAMETER, SCHEDULE 80 PVC PIPE; GRAVITY FED AT MINIMUM SLOPE OF

" PER FOOT

CONTROL PANEL, MOUNTED INSIDE BUILDING

AUDIBLE AND VISUAL ALARMS MOUNTED OUTSIDE BUILDING

NEW ELECTRICAL LINE, IN CONDUIT; CONNECT TO DOSING TANK AND CONTROL PANEL

CONCRETE PATHWAY - SEE NOTE #7

6" GATE VALVE AND BOX

6" GATE VALVE AND BOX

CONTOUR LINES SHOWN IN

ONE-FOOT INTERVALS

AUTOMATIC DISTRIBUTION VALVE (ADV) IN

FIBERGLASS ENCLOSURE TO (6) SEPARATE ZONES

NEW 6" DIAMETER, SCHEDULE 80 PVC PIPE; GRAVITY FED AT MINIMUM SLOPE OF

" PER FOOT

NEW ELECTRICAL LINE, IN CONDUIT; CONNECT TO CLARIFIER TANK AND REMOTE ALARM PANEL

8"

2'

FILTER SAND (REFER TO SIEVE

GRADATION IN SPECIFICATIONS)

FILTER FABRIC, IN ACCORDANCE

WITH OAR 340-73-0041

LOAMY SAND

" PVC LATERAL LINES, INSTALL LEVEL,

ORIFICE SHIELDS 24" ON CENTER

FLUSHING VALVE AND VALVE

BOX, ONE PER LATERAL

REINFORCED CONCRETE WALL

(SEE DETAIL BELOW)

SELECT NATIVE SOIL BACKFILL;

SLOPE 3H:1V TO MEET WITH ADJACENT

GROUND, AS DESCRIBED IN NOTE #3

NOTES:

1. SIEVE ANALYSIS SHALL BE PROVIDED FOR THE FILTER SAND AND UNDERDRAIN MEDIA PROVIDED.

2. LATERAL LINES SHALL BE 1

" IN DIAMETER, AND COMPOSED OF POLYVINYL CHLORIDE WITH A

MINIMUM PRESSURE RATING OF 200 PSI.

3. EXISTING GROUND ELEVATION NOT SHOWN; CONTRACTOR SHALL FIT THE SAND FILTER TO THE

EXISTING TERRAIN. DUE TO THE SAND DUNE ALONG THE WEST EDGE, AND THE OVERALL SLOPE

TO THE EAST, IT IS EXPECTED THAT THE WEST WALL OF THE SAND FILTER WILL BE MOSTLY

BURIED AGAINST THE ADJACENT SAND DUNE, WHILE THE EAST WALL WILL BE MOSTLY EXPOSED.

4. "LOAMY SAND" ABOVE THE FILTER FABRIC SHALL MEET THE REQUIREMENTS OF OAR 340-071-0295, AS DESCRIBED IN SECTION 02530, SANITARY SEWAGE.

5. ALL PVC LATERALS SHALL HAVE AT LEAST 3" OF UNDER DRAIN MEDIA BELOW, AND SUFFICIENT

MEDIA ABOVE TO COVER THE ORIFICE SHIELDS.

6. MAINTAIN AT LEAST 3" OF CONCRETE BETWEEN THE STEEL REINFORCEMENT (REBAR) AND THE

EDGE OF CONCRETE. OVERLAP REBAR AND CONDUCT OTHER CONCRETE FRAMING,

REINFORCEMENT, PLACING, CURING, TESTING, ETC. IN ACCORDANCE WITH AMERICAN CONCRETE

INSTITUTE (ACI) STANDARDS AND SECTION 03300 OF THE PROJECT SPECIFICATIONS.

7. TOP EDGE OF CONCRETE WALL SHALL BE LEVEL ALONG ENTIRE PERIMETER OF THE SAND FILTER.

UNDERDRAIN MEDIA

6" MINIMUM - SEE NOTE #5

" PEA GRAVEL

(I.E. UNDERDRAIN MEDIA)

8"

NATIVE, UNDISTURBED SOIL

BOTTOMLESS SAND FILTER CROSS SECTION

NOT TO SCALE

8"

#5 VERTICAL REBAR,

24" ON CENTER

#5 HORIZONTAL REBAR,

3 ROWS SPACED EQUALLY

4'

1'-6"

PERIMETER CONCRETE FOOTING AND STEM WALL DETAIL

NOT TO SCALE

CAST 3" DIAMETER PVC PIPE

SLEEVE INTO CONCRETE

8"

#5 FOOTING DOWEL ("L"- BAR):

24" ON CENTER, ALTERNATE

DIRECTION OF LEGS

NATIVE, UNDISTURBED SOIL

4 5

H O

R S

F A

A

P

T C

I

S

Y S

T E

M

R

E P

L A

C E

M E

N T

B O

T T

O M

L E

N

D

F

I L

T E

R

D

E T

A I L

S

30 MIL PVC LINER

(AROUND ENTIRE PERIMETER)

NATIVE, UNDISTURBED SOIL

SELECT NATIVE SOIL BACKFILL;

SLOPE 3H:1V TO MEET WITH

ADJACENT GROUND, AS

DESCRIBED IN NOTE #3

3" MINIMUM CLEAR

COVER, ALL SIDES

4'

" - MINUS CRUSHED AGGREGATE

BASE, COMPACTED MEASURE

NATIVE, UNDISTURBED SOIL

1'

2'

90 DEGREE FITTING, THREADED FOR

INCREASED SERVICEABILITY

" SCHEDULE 80

PVC INFLUENT LINE

FROM DOSING TANK

70'

(NOT TO SCALE)

5 5

O

R S

F A

A

P

T

S

T E

M

R

E P

L A

C E

M E

N T

D O

S I N

G

T

A N

K

D

E T

A I

NOTES:

1. REFER TO THE PROJECT SPECIFICATIONS FOR ADDITIONAL DETAILS ON THE DOSING TANK, SEPTIC TANKS, EFFLUENT FILTER, CONTROL PANEL, PUMPS, ETC.

2. DOSING AND SEPTIC TANKS SHALL BE STANDARD DEQ APPROVED DESIGN.

3. EXISTING GROUND ELEVATION NOT SHOWN. CONTRACTOR SHALL FIT THE NEW TANKS AND PLUMBING CONNECTIONS TO THE EXISTING

TERRAIN AND PLUMBING. PIPE INLET / OULET ELEVATIONS SHALL BE SET TO MAINTAIN A CONTINUOUS 3% (MIN) SLOPE IN THE GRAVITY

SEWER LINES.

4. OUTER DIMENSIONS OF 2000 - GALLON PRECAST CONCRETE TANKS ARE APPROXIMATELY 13' LONG BY 6.25' WIDE BY 5.5' TALL.

5. OUTER DIMENSIONS OF 3000 - GALLON PRECAST CONCRETE TANKS ARE APPROXIMATELY 12.5' LONG BY 6.5' WIDE BY 7.5' TALL.