Plans.pdf
PDF 2 MB Posted
- Attached to
- Multi-Agency Road Construction IDIQ Federal contract opportunity
- Solicitation number
- AG-04T0-S-16-0019
About this file
Plans
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| amend2.pdf | ||
| amend1.pdf | ||
| CompleteSolicitation.pdf | ||
| WageRates.pdf | ||
| Spec.pdf | ||
| FinalTaskOrder.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W
FOREST SERVICE - REGION SIX
SIUSLAW NATIONAL FOREST
LINCOLN COUNTY
SHEET INDEX
1 TITLE SHEET WITH VICINITY MAP
ESTIMATE OF QUANTITIES / SIGN PLAN
DEMOLITION PLAN
SITE PLAN FINAL PRODUCT
PROFILES
STREAMBED DETAILS
CONTROL POINT OVERVIEW
STREAM BYPASS TYPICAL
PORTLAND
THE
DALLES
MEDFORD
GRANTS
PASS
COOS
BAY
ROSEBURG
BEND
SALEM
CORVALLIS
EUGENE
ASTORIA
TILLAMOOK
NEWPORT
DETROIT
FLORENCE
REEDSPORT
WESTERN OREGON INDEX MAP
PROJECT
SITE
SIGNATURES
ROB SANDERS CIVIL ENGINEER DATE
DATE
DESIGNED BY
REVIEWED BY
DATE
RECOMMENDED BY
DATE
APPROVAL
DATE
WALT HISLOP, SUPERVISORY CIVIL ENGINEER
JOE ACOSTA, ZONE ENGINEER
MICHELE JONES, DISTRICT RANGER
DARREN LEMON, FOREST ENGINEER
P A
C I F
I C
O
E
A N
WALDPORT
US
US
OR
N O
R T
H
R O
A D
B
E
A
V
E
R
K
FS
FS
FS
FS
0 1 2 3
SCALE IN MILES
ONA BEACH
STATE PARK
B
A
Y
V
I
A
D
N
O
R
T
H
Y
V
I
A
D
S
O
U
A
V
K
N
O
R
T
H
R
O
A
D
PROJECT
SITE
NEWPORT
6 MILES
YACHATS
5 MILES
PHILOMATH
50 MILES
PLANS FOR
LYNDON CREEK
CULVERT REPLACEMENT
LOCATION T13S R11W SEC11
INWATER WORK PERIOD AUGUST 6 TO SEPTEMBER 30
DISPOSAL SITE JCT. 5100/5147
WATER SOURCE ON SITE
VICINITY MAP
D
DATEJEFF CASWELL, DEVELOPMENT ENGINEER
MP 0.7
FS 51
S
T
IM
A T
E O
F Q
U A
N T
IT
IE
S
S
IG
N P
LA
N
S H
E E
T S
H E
E T
S
U S
D
A
F
O R
E S
T
S
E R
V I C
E P
A C
I F
N
R
T H
W E
G
I O
N
S H
E E
T P
R O
J E
C T
LY
N
D O
N C
R E
E K
C U
LV
E
R T
R E
P
LA
C E
M E
N T
R O
L P
O
IN
T O
V E
R V
IE
W
S H
E E
T S
H E
E T
S
U S
D
A
F
O R
E S
T
S
E R
V I C
E P
A C
I F
R
T H
W E
G
I O
N
S H
E E
T P
R O
J E
C T
LY
N
D O
N C
R E
E K
C U
LV
E
R T
R E
P
LA
C E
M E
APPROXIMATE BEDROCK ELEVATION
171.64
DP2
APPROXIMATE BEDROCK ELEVATION
171.32
DP3
APPROXIMATE BEDROCK ELEVATION
171.90
DP4
APPROXIMATE BEDROCK ELEVATION
171.90
DP1
EXISTING 5' X 60' CULVERT TO BE REMOVED
CP 6
CP 7
ALIGNMENT: ROAD CENTERLINE
STA: 0+10.00
OFF: 6.18' R
NORTHING: 9822.42
EASTING: 9747.16
NORTHING 9865.93
EASTING 9863.53
SAW CUT LINE
NORTHING 9841.34
EASTING 9776.98
SAW CUT LINE
A
S
P
H
A
L
M
A
I
N
A
S
P
H
A
M
A
I
N
R
O
D
E
X
I
S
T
I
G
P
H
A
L
T
E
X
I
S
T
I
P
H
A
L
T
L
Y
N
D
E
E
K
D E
M O
LI
T
IO
N
P
LA
N S
H E
E T
S H
E E
T S
U S
D
A
F
O R
E S
T
S
E R
V I C
E P
A C
I F
R
T H
W E
G
I O
N
S H
E E
T P
R O
J E
C T
LY
N
D O
N C
R E
E K
C U
LV
E
R T
R E
P
LA
C E
M E
APPROXIMATE BEDROCK ELEVATION
171.64
DP2
APPROXIMATE BEDROCK ELEVATION
171.32
DP3
APPROXIMATE BEDROCK ELEVATION
171.90
DP4
APPROXIMATE BEDROCK ELEVATION
171.90
DP1
NORTHING 9886.78
EASTING 9830.23
ELEVATION 170.79
NEW CMP INLET INVERT
NORTHING 9819.67
EASTING 9810.37
ELEVATION 169.39
NEW CMP OUTLET INVERT
CP 6
CP 7
ALIGNMENT: ROAD CENTERLINE
STA: 0+10.00
OFF: 6.18' R
NORTHING: 9822.42
EASTING: 9747.16
NORTHING 9865.93
EASTING 9863.53
SAW CUT LINE
NORTHING 9841.34
EASTING 9776.98
SAW CUT LINE
R
O
D
E
X
I
S
T
I
P
H
A
L
T
E
X
I
S
T
I
P
H
A
L
T
MATCH AC BOP
F
L
O
W
L
Y
N
D
E
E
K
S
IT
E P
LA
N
F
IN
A L
P R
O D
U C
T S
H E
E T
S H
E E
T S
U S
D
A
F
O R
E S
T
S
E R
V I C
E P
A C
I F
R
T H
W E
G
I O
N
S H
E E
T P
R O
J E
C T
LY
N
D O
N C
R E
E K
C U
LV
E
R T
R E
P
LA
C E
M E
E V
A T
I O
N
F
E E
T
EXCAVATION PROFILE
E L
E V
A T
I O
N
F
E E
T
ROAD CENTERLINE PROFILE
3" ASPHALT OVER
12" DEPTH GRADING D
SHOULDERS AND TRAVEL WAY
SHOULDERS AND FILL SLOPES 1V : 1H.
AGGREGATE SLOPE 1:V TO 2:H
BLEND SURFACING TO MATCH EXISTING UNDISTURBED
ROADWAY EXTENTS OUTSIDE EXCAVATION LIMITS
1' SHOULDERS AND FILL WIDENING EACH
SIDE OF EMBANKMENT (TYP)
TYPICAL ROADWAY
CROSS SECTION
APPROXIMATE
BEDROCK ELEVATION
171.64
APPROXIMATE
BEDROCK ELEVATION
171.32
APPROXIMATE
BEDROCK ELEVATION
171.90
APPROXIMATE
BEDROCK ELEVATION
171.90
NEW CMP INVERT
ELEVATION 169.39
NEW CMP INVERT
ELEVATION 170.79
LP STA: 1+01.43
LP ELEV: 187.48
PVI STA:0+92.50
PVI ELEV:186.89
K:8.33
LVC:65.00
V
A
E
V
A
E
V
NOT TO SCALE
ASPHALT CUT LINE
STATION 1+35.00ASPHALT CUT LINE
STATION 0+45.00
V
M
X
V
M
X
NEW ROAD SURFACE TO MATCH EXISTING SURFACE ELEVATIONS
NEW 16'-3" X10'-10" X 70' PIPE ARCH
EXISTING STREAMBED
FLOW
FLOW
BACKFILL
NEW PAVEMENT SEE SECTION BELOW
MATCH BOP
MATCH EOP
-2.00%
COMPACTED SUBGRADE
2-3% CROWN
P R
O
FI
LE
S
S H
E E
T S
H E
E T
S
U S
D
A
F
O R
E S
T
S
E R
V I C
E P
A C
I F
R
T H
W E
G
I O
N
S H
E E
T P
R O
J E
C T
LY
N
D O
N C
R E
E K
C U
LV
E
R T
R E
P
LA
C E
M E
R-R TYPICAL RIPRAP ARMORING
NOTES:
1) FILL RIPRAP VOIDS WITH EXCESS MATERIAL TO PREVENT STREAM
FROM FLOWING THROUGH RIPRAP, INDIRECT TO 251 PAY ITEM.
2) PLACE CLASS 4 RIPRAP 1' THICK WITH FACE OF SLOPE FLUSH
WITH ROADWAY FILLSLOPE.
3) PLACE LARGEST RIPRAP MATERIAL AT BASE OF SLOPE
MATCH FINISHED
RIPRAP SLOPES TO
FILL SLOPES
1) PLACE 3 TO 5 RANDOM BOULDERS. VARY EMBEDMENT
2) AT INLET AND OUTLET PLACE LARGEST ROCKS FROM FRS CLASS 1 AND 2. PLACE
LARGEST BOULDERS OUTSIDE AND TOWARDS ENDS OF ARCH
S-S STREAM BANK
ARMORING
EXTEND BANK ROCKS TO TOP OF EXISTING
BANKS OUTSIDE OF RIPRAP EXTENTS
A-A TYPICAL STREAMBED SECTION VIEW B-B TYPICAL RANDOM BOULDER SECTION VIEW
LEAN CONCRETE BACKFILL
10' FROM ENDS OF PIPE
BEDCLASS 4
PROPOSED THALWEG
1V:1.5H TYPICAL
BOTH SIDES
PROPOSED THALWEGRANDOM BOULDERS.
LOCATIONS VARY
6" DEPTH GRADATION D
BEDDING
R
R
ARMOR BELOW STREAM LINE AND FILL SLOPE WITH CLASS 4 RIPRAP. 5' WIDE x 1' THICK
AROUND PIPE END OF CLASS 4 RIPRAP TO BE STAKED BY C.O.
CONTINUOUS HARDENED
BANKS (BOTH SIDES) INTERMINGLE BOULDERS IN
BANKS
B
A
A
PROPOSED STREAM PLAN VIEW
STR
EAM
G R
AD
IEN
T -2.0%
STREAMBED SIMULATION
MATERIAL BEDCLASS 4. UTILIZE
UNSUITABLE EXCAVATION TO FILL VOIDS
AND SEAL MATERIAL
EXISTING
GROUND
MINIMUM 8" - 12" GAPS IN SURFACE BOULDERS
TO PROVIDE FLOW PATHS
NOTES:
1) CONTINUOUS BANK ROCKS NOT SHOWN IN PROFILE VIEW
2) DETAILS A-A, B-B AND R-R SEE CROSS SECTION DETAIL SHEET.
3) STRUCTURE ROCKS AND BANK ROCKS SHALL BE FISH REST STOP ROCKS CLASS 1 AND 2.
4) BACKFILL EXCAVATED AREAS, EXISTING CULVERT SCOUR HOLE AND SUMP HOLES AS STAKED BY C.O.
USE BEDCLASS 4 STREAM SIMULATION ROCK, OR MATERIAL APPROVED BY C.O.
5) BOULDERS 16" MINIMUM MEDIAN AXIS
6) RANDOM BOULDER SHALL BE EMBEDDED AT LEAST 2 / 3 rds OF DIAMETER, LOCATIONS MAY BE ADJUSTED BY C.O.
B
FSR CLASS 1-2 RANGE FOR RANDOM BOULDERS SEE SECTION A-A PROFILE DETAIL
EXISTING STREAM BANK
ARMORING DETAIL S-S.
RANDOMLY
PLACED
BOULDERS
MATCH EXISTING BANK WIDTHS OUTSIDE
OF RIPRAP EXTENTS, INLET AND OUTLET
DETAIL A-A
BOULDER DETAIL B-B
RIPRAP DETAIL R-R.
INLET/OUTLET TYPICAL
NOT TO SCALE
NOT TO SCALE
DAYLIGHT STREAM GRADIENT WITH
EXISTING THALWEG
MATCH EXISTING STREAM AT END OF SCOUR POOL
EXTEND BOULDER PLACEMENT BEYOND
OUTLET AROUND WOODY DEBRIS
DOWNSTREAM
BEDCLASS 4 1V:1.5H
SLOPE TO BANKS. BANKS
1' AT 2%
LEGEND
BOULDERS
BED CLASS 4
BANK ROCKS
70'
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
S T
R E
A M
B E
D D
E T
A
IL
S S
H E
E T
S H
E E
T S
U S
D
A
F
O R
E S
T
S
E R
V I C
E P
A C
I F
R
T H
W E
G
I O
N
S H
E E
T P
R O
J E
C T
LY
N
D O
N C
R E
E K
C U
LV
E
R T
R E
P
LA
C E
M E
GEOTEXTILE-WRAPPED STRAW BALE SEDIMENT CONTROL WEIR
BANKFULL
PLAN VIEW
ELEVATION VIEW
PROFIILE VIEW
(NOT TO SCALE)
STREAM BYPASS TYPICAL
PLAN VIEW
GEOTEXTILE MIRAFI 140N
OR EQUAL
STRAW BALES
SECTION VIEW
STREAM FLOW
GRANULAR BACKFILL
SECTION 703.03(a)
STREAM FLOW
GRANULAR BACKFILL
SECTION 703.03(a)
GEOTEXTILE MIRAFI 140N
OR EQUAL
STRAW BALES
SANDBAG BYPASS DAM DETAILS
(NOT TO SCALE)
BYPASS PIPE
6 MIL. PLASTIC
SHEETING
ANTI-SEEP COLLAR.
ROLL ANTI-SEEP COLLAR OVER
MEMBRANE & PIPE, THEN CUT
AND REMOVE MEMBRANE
FROM END OF PIPE.
IMPERVIOUS MEMBRANE KEY TRENCH, FILL WITH CLEAN
GRAVEL AS NEEDED TO CONTROL SEEPAGE UNDER
IMPERVIOUS MEMBRANE
ANCHOR IMPERVIOUS MEMBRANE (SANDBAGS, STONES,
ETC.)
18" MIN.
IMPERVIOUS MEMBRANE SANDBAGS
BYPASS PIPE
OVERFLOW LESS THAN "BANKFULL"
18" MIN.
SANDBAGS
STREAMBED
STREAMBED
VARIES AS NEEDED
STREAM FLOW
CLEAR WATER SUMPS
ELBOW JOINTS AS NEEDED
BYPASS PIPE
OUTLET LOCATION APPROVED
BY C.O.
(NOT TO SCALE)
FLOW
"BROWN WATER SUMP
REMOVE SEDIMENT / TURBIDITY BEFORE ALLOWING
WATER TO RE-ENTER STREAM
GEOTEXTILE-WRAPPED STRAW BALE SEDIMENT
CONTROL WEIR
BANKFULL
CULVERT
A A
BYPASS DAM (SEE
DETAILS)
IMPERVIOUS MEMBRANE KEY TRENCH.
KEY MEMBRANE INTO TRENCH BEFORE
DRAPING OVER SANDBAG DAM.
STABLE BENCH
TYPICAL SECTION A-A
EXCAVATION
SLOPE
1.5
VARIES AS NEEDED
BYPASS PIPE
CULVERT
NOTE:
THE DEWATERING & SEDIMENT CONTROL PLAN SHOWS THE MINIMUM
ACCEPTABLE CRITERIA. MAINTAINING CLEAN WATER DOWNSTREAM OF THE
PROJECT IS THE RESPONSIBILITY OF THE CONTRACTOR THROUGHOUT THE
DURATION OF THE PROJECT, 24 HRS./DAY
ANTI-SEEP COLLAR
S T
R E
A M
B Y
P A
S S
T Y
P
IC
A L
S H
E E
T S
H E
E T
S
U S
D
A
F
O R
E S
T
S
E R
V I C
E P
A C
I F
R
T H
W E
G
I O
N
S H
E E
T P
R O
J E
C T
LY
N
D O
N C
R E
E K
C U
LV
E
R T
R E
P
LA
C E
M E
N T
File details come from the government source that posted it. Updated .