WageRates.pdf

PDF 16 KB Posted

Attached to
Obsidian Trailhead Restroom Replacement Federal contract opportunity
Solicitation number
AG-04T0-S-11-0039-WIL
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Wage Rates

View the file

Other files for this federal contract opportunity

Other files attached to Obsidian Trailhead Restroom Replacement, newest first.
File Type Posted
Plans.pdf PDF
CompleteSolicitation.pdf PDF
PacketToCompleteAndReturn.pdf PDF
Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: OR100071 08/19/2011 OR71

Superseded General Decision Number: OR20080071

State: Oregon

Construction Type: Heavy

County: Lane County in Oregon.

HEAVY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 03/12/2010 1 04/23/2010 2 05/14/2010 3 07/02/2010 4 11/26/2010 5 12/31/2010 6 01/21/2011 7 02/25/2011 8 04/29/2011 9 05/13/2011 10 08/12/2011 11 08/19/2011

* BROR0001-012 06/01/2011

Rates Fringes

BRICKLAYER.......................$ 31.53 14.93

CARP0001-024 06/01/2007

Rates Fringes

Carpenters:

Excluding Form Work.........$ 27.56 13.30

ELEC0280-014 07/01/2010

LANE (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NORTHEAST

CORNER OF COOS COUNTY TO THE SOUTHEAST CORNER OF LINCOLN COUNTY)

Rates Fringes

ELECTRICIAN......................$ 35.76 3%+14.73

ELEC0932-010 01/01/2011

LANE COUNTY (AREA LYING WEST OF A LINE NORTH AND SOUTH FROM THE

N.E. CORNER OF COOS COUNTY TO THE S.E. CORNER OF LINCOLN COUNTY)

ELECTRICIAN......................$ 31.97 3%+$12.90

ENGI0701-030 01/01/2011

8/29/2011mhtml:file://O:\NFS\R06\Program\Procurement-6300\Contracting-6320Restricted\SwWor\...

Power equipment operators:

GROUP 1.....................$ 37.27 12.35

GROUP 1A....................$ 39.13 12.35

GROUP 1B....................$ 41.00 12.35

GROUP 2.....................$ 35.64 12.35

GROUP 3.....................$ 34.65 12.35

GROUP 4.....................$ 33.71 12.35

GROUP 5.....................$ 32.60 12.35

GROUP 6.....................$ 29.61 12.35

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments;

GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom;

GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over

GROUP 2: CRANE: Cableway Operator, 25 tons and over;

HYDRAULIC CRANE: Hydraulic crane operator 90 tons through 199 tons (without luffing or tower attachment);

TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; HYDRAULIC CRANE:

Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment); Rubber tired scraper with tandom scrapers, multi-engineTrenching Machine-Wheel Operator; Loader 120,000 lbs and above; BLADE: Auto Grader;

Blade Operator-Robotic; Bulldozer over 120,000 lbs and above; CRANE: Derrick Barge Operator 30 ton but less than 150 ton;

GROUP 3: HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment);

LATTICE BOOM CRANES: Lattice Boom Crane-50 through 89 tons (and less than 150 feet boom); Rubber Tired Scraper: with tandom scrapers; self loading, paddle wheel, auger type, finish and/or 2 or more units; Loader 60,000 lbs and less than 120,000 lbs; Bulldozer over 70,000 lbs up to and including 120,000 lbs;

GROUP 4: CRANE: Hydraulic Crane Operator, under 50 tons;

LATTICE BOOM CRANE OPERATOR: Lattice Boom Crane Operator, under 50 tons; TRACKHOE/BACKHOE-ROBOTIC: track and wheel type, up to and including 20,0000 lbs. with any or all attachments; BLADE: Blade Operator; Tractor operator with boom attachment; DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator over 20,000 lbs pullback; CRANE: Chicago boom and similar types; Boom type lifting device, 5 ton capacity or less; Asphalt Paver;

Rubber-Tired Scraper, single engine, single scraper;

Compactor-Self Propelled; Loaders 25,000 lbs and less than 60,000 lbs; Bulldozer over 20,000 lbs and more than 100 horse up to 70,000 lbs; Mechanic;CRANE: Derrick Barge Operator less than 30 ton; Piledriver; Screed; Compactor with blade

GROUP 5: TRACKHOE/BACKHOE HYDRAULIC: Track type up to and including 20,000 lbs, Wheel type (Ford, John Deer, Case Type); Boom truck operator; DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator less than 20,000 lbs pullback; Concrete Pumper; Concrete Paver:

Compactor; Loaders, rubber tired type , less than 25,00 lbs; Forklift over 5 ton, Bulldozer 20,000 lbs or 100 horses or less; Mixer operator; Roller; Compactor without blade

GROUP 6: LOADERS: (less than 1 cu yd.); Oiler; Bobcat/Skid Loader; Grade Checker; Crane oiler; Drill Assistant;

Forklift; Asphalt Spreader; Broom Operator; Forklift;

Roller (non-asphalt)

IRON0029-011 07/01/2010

Rates Fringes

IRONWORKER (Ornamental, Reinforcing, and Structural).....$ 33.62 19.60

LABO0003-022 06/01/2010

Rates Fringes

Laborers:

GROUP 1.....................$ 24.76 12.10

GROUP 2.....................$ 25.39 12.10

GROUP 3.....................$ 25.85 12.10

GROUP 4.....................$ 26.25 12.10

GROUP 5.....................$ 21.61 12.10

LABORER CLASSIFICATIONS

GROUP 1: Blaster, Demolition; Laborer: Water, Sewer Underground

GROUP 2: Chain Saw

GROUP 3: Vibrating Plate

GROUP 4: Asphalt Raker; Pipelayer; Grade Checker

GROUP 5: Flagger, Traffic Control-Cone Setter

PAIN0055-032 07/01/2009

Rates Fringes

Painters:

Including Brush and Roller..$ 18.59 7.24

SUOR2009-055 11/23/2009

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 22.47 9.29

DRYWALL FINISHER/TAPER...........$ 24.05 0.00

HIGHWAY/PARKING LOT STRIPING:

Painter.........................$ 24.74 5.43

LABORER: Asphalt Spreader.......$ 22.18 9.39

LABORER: Common or General......$ 19.52 6.22

LABORER: Form-Stripping.........$ 19.27 6.32

LABORER: Landscape..............$ 10.60 1.80

LABORER: Mason Tender - Brick...$ 18.39 6.74

LABORER: Mason Tender - Cement/Concrete..................$ 22.39 6.90

OPERATOR: Excavator.............$ 25.06 5.94

OPERATOR: Tractor...............$ 20.00 0.73

PAINTER: Spray Only.............$ 19.77 0.00

PILEDRIVERMAN....................$ 26.19 11.58

TRUCK DRIVER: Dump Truck........$ 16.11 8.81

TRUCK DRIVER: Lowboy Truck......$ 17.07 5.50

TRUCK DRIVER: Water Truck.......$ 18.65 6.70

TRUCK DRIVER.....................$ 32.10 5.90

TEAM0037-009 06/01/2009

Rates Fringes

Truck drivers:

GROUP 1.....................$ 26.90 12.75

TRUCK DRIVERS CLASSIFICATIONS

GROUP 1: Flatbed Truck; Off the Road Truck

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION