Amendment No. 1 - Road 19 Asphalt Repairs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment-001-Plans.pdf | ||
| Solicitation-Packet-To-Return.pdf | ||
| Solicitation-Road19-AsphaltRepairs.pdf | ||
| Attachment-002-SpecificationList.pdf | ||
| Attachment-003-SupplementalSpecs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION
NO.
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
1 May 24, 2016 798941
6. ISSUED BY CODE 04R4 7. ADMINISTERED BY (If other than Item 6) CODE
Willamette NF Supervisor’s Office 3106 Pierce Parkway, Suite D Springfield OR 97477-7909
Same as block 6
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
AG-04R4-S-16-0019
9B. DATED (SEE ITEM 11)
May 13, 2015
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Project Name: Road 19 Asphalt Repairs
See page 2 for continuation of Standard Form 30.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Lorenzo Montoya 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
Lorenzo Montoya 5/24/16 (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
2 | P a g e
ATTACHMENT TO STANDARD FORM 30, (BLOCK 14 CONTINUED)
This amendment publicizes the following question and response received from a contractor.
Question: When you look at the cross sections on sheet 6 of the plans you are basically excavating 24' of the road way down. I don't believe you can safely get traffic around this excavation or even have enough room for it anyway. So my question is can we completely close the road down? Or is there other alternatives you want implemented and if so what would they be in detail?
Response: No, the road may not be completely closed. Based on the current design a contractor would have 11.7’ of existing asphalt width left, and can obtain approximately 13.5 ft of roadway with filling in the ditch. 12’ is the minimum. If a contractor follows the slopes in the plans, a road closure would not be required. To meet the traffic control requirements, the ditch will need to be filled. Onsite extracted material may be used to fill the ditch.
This amendment extends the response date to May 31, 2016, 4:00 PM – Local Time.
This amendment changes the Estimated Start Work date to June 20, 2016.