Construction_RFP_UnionCkWater.docx
DOCX document 4 MB Posted
- Attached to
- Union Creek Water System Improvements Federal contract opportunity
- Solicitation number
- AG-04N7-S-16-0012
About this file
RFP Solicitation Document
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Specifications_UnionCkWater.pdf | ||
| DRAWINGS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| CONSTRUCTION RFP | Solicitation No. AG-04N7-S-16-0012 |
| Rogue River-Siskiyou National Forest | |
| Union Creek Water System Improvements | |
| PAGE 20 of 65 |
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-04N7-S-16-0012
2. TYPE OF SOLICITATION
|_| SEALED BID (IFB)
|X| NEGOTIATED (RFP)
3. DATE ISSUED
03-08-2016
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO78818
6. PROJECT NO.
| 7. ISSUED BY | CODE |
| 8. ADDRESS OFFER TO |
USDA, Forest Service Rogue River-Siskiyou National Forest 3040 Biddle Road Medford, Oregon 97504
USDA, Forest Service Rogue River-Siskiyou National Forest Attn: Contracting 3040 Biddle Road, Medford, Oregon 97504
| 9. FOR INFORMATION |
| CALL: |
| A. NAME |
Maggie Giuliani, Contracting Eric Grim, Technical Contact
B.TELEPHONE NO. (Include area code) (No Collect calls) 541-618-2018 541-618-2065
541-957-3441
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
UNION CREEK WATER SYSTEM IMPROVEMENTS
Rogue River-Siskiyou National Forest Jackson County, Oregon
THIS IS A TOTAL SMALL BUSINESS SET-ASIDE
Price Range: The Government's estimated price range is between $250,000and $500,000
NOTE: Address/Mail/Deliver proposals to BLOCK 8 address. Bid guarantees must be received no later than the specified closing date. Bid Bonds must be originals.
Offferors shall be registered and active in the System for Award Management (SAM) data base prior to award. Information on registration may be obtained via the internet at: http://www.sam.gov All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM System.
11. The Contractor shall begin performance within 10 calendar days and complete project ready for use by 180 calendar days after receiving |_| award, |X| notice to proceed. This performance period is |X| mandatory, |_| negotiable. (See Section F.)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? “yes” (If “YES,” indicate within how many calendar days after award in Item 12B.)
| |_| YES | |_| NO | |
| 12B. CALENDAR DAYS |
| 13. ADDITIONAL SOLICITATION REQUIREMENTS: | |||
| A. | Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 4:30 p.m. (hour) local time April 6, 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due. | ||
| B. | An offer guarantee | X is, | |_| is not required. |
| C. | All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference. | ||
| D. | Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. |
| NSN 7540-01-155-3212 | 1442-101 | STANDARD FORM 1442 (REV. 4-85) |
| Computer Generated | Prescribed by GSA | |
| FAR (48 CFR) 53.236-1(e) |
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
| 16. REMITTANCE ADDRESS (Include only if different than Item 14) |
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS PLACE AMOUNTS IN SECTION B.
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
| AMENDMENT NO. |
| DATE |
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
| 24. SUBMIT INVOICES TO ADDRESS SHOWN IN |
| (4 copies unless otherwise specified) |
| ITEM |
| 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO | |
| |_| 10 U.S.C. 2304(c)( ) | |_| 41 U.S.C. 253(c)( ) |
| 26. ADMINISTERED BY | CODE |
| 27. PAYMENT WILL BE MADE BY |
INVOICE PROCESSING PLATFORM IPP
ALL INVOICES MUST BE SUBMITTED ELECTRONICALLY
THROUGH THE INVOICE PROCESSING PLATFORM (IPP)
VIA WWW.IPP.GOV
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
| |_| | 28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract. |
| |_| | 29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary. |
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)
MARGARET L. GIULIANI
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
| Computer Generated | STANDARD FORM 1442 BACK (REV. 4-85) |
| CONSTRUCTION RFP | Solicitation No. AG-04N7-S-16-0012 |
| Rogue River-Siskiyou National Forest | |
| Union Creek Water System Improvements | |
| PAGE 2 of 65 |
TABLE OF CONTENTS
UNION CREEK WATER SYSTEM IMPROVEMENTS
ROGUE RIVER-SISKIYOU NATIONAL FOREST
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
SECTION B – SCHEDULE OF ITEMS
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SECTION D - PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E - INSPECTION AND ACCEPTANCE
SECTION F - DELIVERIES OR PERFORMANCE
SECTION G - CONTRACT ADMINISTRATION DATA
SECTION H - SPECIAL CONTRACT REQUIREMENTS
PART II - CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
| CONSTRUCTION RFP | Solicitation No. AG-04N7-S-16-0012 |
| Rogue River-Siskiyou National Forest | |
| Union Creek Water System Improvements | |
| PAGE 2 of 65 |
SECTION M - EVALUATION FACTORS FOR AWARD
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
UNION CREEK WATER SYSTEM IMPROVEMENTS
Rogue River – Siskiyou National Forest Jackson County, Oregon
PART I—THE SCHEDULE (CONTINUED)
Phase I Base Items:
| ITEM NO. |
| DESCRIPTION |
| METHOD OF MEASURE |
| UNIT |
| ESTIMATED QUANTITY |
| UNIT PRICE |
| AMOUNT |
| A-1 |
| Mobilization / Demobilization |
| LSQ |
| LS |
| 1 |
| $ |
| $ |
| A-2 |
| Accommodations for Public Traffic |
| LSQ |
| LS |
| 1 |
| $ |
| $ |
| A-3 |
| Erosion Control |
| LSQ |
| LS |
| 1 |
| $ |
| $ |
| A-4 |
| 8” HDPE Water Line |
| CQ |
| LF |
| 700 |
| $ |
| $ |
| A-5 |
| 6” HDPE Water Line |
| CQ |
| LF |
| 30 |
| $ |
| $ |
| A-6 |
| 4” HDPE Water Line |
| CQ |
| LF |
| 210 |
| $ |
| $ |
| A-7 |
| 4” HDPE Bore with Casing under Highway |
| CQ |
| LF |
| 70 |
| $ |
| $ |
| A-8 |
| 2 ½” Galv. Water Line |
| CQ |
| LF |
| 30 |
| $ |
| $ |
| A-9 |
| 2” Sch. 40 PVC Water Line |
| CQ |
| LF |
| 135 |
| $ |
| $ |
| A-10 |
| ¾” Sch. 40 PVC Service Line |
| CQ |
| LF |
| 415 |
| $ |
| $ |
| A-11 |
| Air Release / Air Vacuum Valve Assembly |
| AQ |
| EA |
| 1 |
| $ |
| $ |
| A-12 |
| Water Meter with Backflow Preventer to Existing Building |
| AQ |
| EA |
| 8 |
| $ |
| $ |
| A-13 |
| Yard Hydrant with Backflow Preventer |
| AQ |
| EA |
| 1 |
| $ |
| $ |
| A-14 |
| Well House #2 Construction, Piping & Appurtenances |
| LSQ |
| LS |
| 1 |
| $ |
| $ |
| A-15 |
| Well House #2 Electrical, Instrumentation and Controls |
| LSQ |
| LS |
| 1 |
| $ |
| $ |
| A-16 |
| Gravel Surface Restoration |
| CQ |
| TON |
| 100 |
| $ |
| $ |
| A-17 |
| Existing Reservoir Repairs |
| LSQ |
| LS |
| 1 |
| $ |
| $ |
| A-18 |
| Selective Demolition |
| LSQ |
| LS |
| 1 |
| $ |
| $ |
| A-19 |
| Project Closeout and Operations and Maintenance Manuals |
| LSQ |
| LS |
| 1 |
| $ |
| $ |
TOTAL BASE ITEMS $________________
PART I—THE SCHEDULE (CONTINUED)
Phase II Option Items:
| ITEM NO. |
| DESCRIPTION |
| METHOD OF MEASURE |
| UNIT |
| ESTIMATED QUANTITY |
| UNIT PRICE |
| AMOUNT |
| B-1 |
| Mobilization / Demobilization |
| LSQ |
| LS |
NIC*
NIC*
XXXXX
NIC*
XXXXX
| B-2 |
| Accommodations for Public Traffic |
| LSQ |
| LS |
| 1 |
| B-3 |
| Erosion Control |
| LSQ |
| LS |
| 1 |
| B-4 |
| 3" HDPE Water Line with 1-1/2" Sch. 40 PVC Electrical Conduit |
| CQ |
| LF |
| 50 |
| B-5 |
| 3" & 8" HDPE Water Lines (Common Trench) with 1-1/2" Sch. 40 PVC Electrical Conduit |
| CQ |
| LF |
| 1,150 |
| B-6 |
| 8" HDPE Water Line with 1-1/2" Sch. 40 PVC Electrical Conduit |
| CQ |
| LF |
| NIC* |
NIC*
XXXXX
NIC*
XXXXX
| B-7 |
| 8" HDPE Water Line |
| CQ |
| LF |
| 705 |
| B-8 |
| Air Release / Air Vacuum Valve Assembly |
| AQ |
| EA |
| NIC* |
NIC*
XXXXX
NIC*
XXXXX
| B-9 |
| Gravel Surface Restoration |
| CQ |
| TON |
| 226 |
| B-10 |
| Project Closeout and Operations and Maintenance Manuals |
| LSQ |
| LS |
| NIC* |
NIC*
XXXXX
NIC*
XXXXX
*NIC – NOT IN CONTRACT
TOTAL OPTION ITEMS $___________________
TOTAL AMOUNT ALL ITEMS $__________________
PART I—THE SCHEDULE (CONTINUED)
DUNS NUMBER: ______________________________
TAX IDENTIFICATION NUMBER (TIN):____________________________
EMAIL: __________________________________________
B-2 - NOTES:
· Bid Items: Offerors must bid on all items. If offeror does not intend to charge for an Item, a price of ”0” or “NO COST” should be shown
· Bond Premiums: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts shall not be in addition to the contract price. Include bond payments under A-1 Mobilization/Demobilization.
· A bid bond (20% of total base bid price) is required for this solicitation. A performance (100%) and payment bond (100%) are required within 10 days after contract award.
· Option Items: Offerors must bid on all items (all Base Items and all Options Items). See “Option for Increased Quantity – Separately Priced Line Items” in Section I, and “Evaluation of Options” in Section M.
· If the Government elects to exercise the Option item, it will be for the total quantity of all payment items within the Option item. Exercise of Option Item may be made by the government within 75 days after contract award.
· Electronic offers will not be accepted. An offer that is emailed to a government account will be rejected.
· This is not a public bid opening. All offers submitted are considered confidential. The name of the contractor and the amount of the contract will be disclosed only after an award has been made.
· Offferors must register in the System for Award Management (SAM) data base (See FAR clause 52.204-7). Information on registration may be obtained via the internet at: http://www.sam.gov All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM System.
· Contractor must be enrolled in the Invoice Processing Platform in order to receive payment for services rendered. If you are not currently enrolled, please go to https://www.ipp.gov/ , and then Vendor Enrollment. If you experience any issues at the site, please contact customer support at the following:
Customer Support
· (866) 973-3131
· IPPCustomerSupport@fms.treas.gov
· Proposal Submission Documents: See Section L for a list of required Proposal Submission Documents and other instructions.
Offers should be mailed or hand delivered to:
| Rogue River-Siskiyou National Forest |
| Attn: Contracting |
| 3040 Biddle Road |
| Medford, Oregon 97504 |
Include the following on the sealed envelope:
RFP Number: AG-04N7-S-16-0012
Name of Project: Union Creek Water System Improvements
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1 Scope of Contract
The project includes all labor, materials, equipment, supplies, supervision and incidentals necessary for improvements to the existing water system at the Union Creek Recreation Area. This project includes construction of Phase I and portions of Phase II (option items). Work includes, but is not limited to site work; demolition of structures; installation of water lines and related valves, fittings, meters, backflow devices and appurtences; construction of well house building; and installation of electrical connections and controls to new well house building. This project also includes cutting and capping existing asbestos concrete piping.
C-2 Project Location
The project is located in Jackson County, Oregon, near the community of Prospect, on the High Cascades Ranger District, and may be reached by traveling from Medford, Oregon, north on State Highway 62 approximately 55 miles to FSR 6230.
C-3 Price Range
The Government's price range is: between $250,000 - $500,000.
C-4 AGAR 452.211-72 Statement of Work/Specifications (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
C-5 AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
C-6 Reference Standards
AASHTO American Association of State Highway and Transportation Officials
ACI American Concrete Institute
ANSI American National Standards Institute
| API | American Petroleum Institute |
| APWA | American Public Works Association |
ASLA American Society of Landscape Architects
ASTM American Society for Testing and Materials 100 Barr Harbor Drive
AWWA American Water Works Association
BAA Buy American Act
CFR Code of Federal Regulations
EPA Environmental Protection Agency
FAR Federal Acquisition Regulations
FHWA Federal Highway Administration
IEEE Institute of Electrical and Electronics Engineers
JCDS Jackson County Development Services
NACE National Association of Corrosion Engineers
NAPCA National Association of Pipe Coating Applicators
NEC National Electrical Code
NEMA National Electrical Manufacturers Association
NFPA National Fire Protection Association
NIOSH National Institute for Occupational Safety and Health
NIST National Institute of Standards and Technology
NSF National Sanitation Foundation
OAR Oregon Administrative Rules
ODEQ Oregon Dept. of Environmental Quality
ODOT Oregon Department of Transportation
OR-OSHA Oregon Occupational Safety and Health Administration
OSHA Occupational Safety and Health Administration
OSHD Oregon Department of Transportation, Oregon State Highway Division
PP Pacific Power
PCA Portland Cement Association
UL Underwriters Laboratories, Inc.
USDA U.S. Department of Agriculture
USFS U.S. Forest Service
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E--INSPECTION AND ACCEPTANCE
E-1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
| Clause Number |
| Title |
| Date |
| 52.246-12 |
| Inspection of Construction |
| AUG 1996 |
E-2 Inspection and Acceptance (AGAR 452.246-70) (FEB 1988)
(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.
(b) Inspection and acceptance will be performed at the project site.
E-3 Inspection and Testing Performed By Government
The Government will perform sampling, testing and inspection of work in progress where these responsibilities are not expressly assigned to the Contractor by the Forest Service specifications or by the Special Project Specifications.
E-4 Conformity with Drawings and Specifications
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions and material requirements shown on the drawings, indicated in the specifications or designated on the ground. “Reasonably close conformity” is in compliance with reasonable and customary manufacturing and construction tolerances.
SECTION F--DELIVERIES OR PERFORMANCE
F-1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisistion.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
| Clause Number |
| Title |
| Date |
| 52.242-14 |
| Suspension of Work |
| APR 1984 |
F-2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) Alternate I (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than _150 calendar days for base items and 30 calendar days for option item after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
Performance time for the Option Item (if exercised) will run consecutively.
F-3 Project Coordination/Other Work in the Area
Contractor will be required to coordinate with District staff as needed to obtain access keys for well enclosure, etc. The project site will need to remain open during the duration of the work.
Construction activity may be allowed on weekends with prior approval of the CO. Weekends are considered to begin at 5 pm on Fridays and end at 7 am on Mondays. Project activities shall not disrupt normal Nursery function (domestic water service, road access, electrical service, etc.) without 72 hours notice and shall be limited to four (4) hours per occurrence.
SECTION G--CONTRACT ADMINISTRATION DATA
G-1 AGAR 452.215-73 Post Award Conference (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held after the date of contract award. The conference will be held at a mutually agreed upon location.
G-2 Government-Furnished Property
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
Property to be Furnished Delivery Point Time of Delivery
NONE
G-3 Contracting Officer's Representative
A Contracting Officer's Representative (COR) will be designated after the contract award. The Contractor will be notified by letter of the name and duties of the COR.
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H-1 FAR 52.236-4 Physical Data (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by USFS.
(b) Weather conditions suitable for performance of work are normally expected year around with weather delays typically expected in the Medford area.
H-2 Use of Premises
(a) The project site is accessed by Forest Roads that are to remain open for public use during performance of work under this contract except in the immediate project area which may be closed by contractor during construction activity. Contractor shall conduct work in such a manner as to protect the public.
(b) Activities near State Highway 62 require ODOT permit per Section 22 11 40
(c) Unless provided otherwise, the Contractor shall dispose of solid waste in accordance with applicable Federal, State, and local regulations. Use of Forest Service waste disposal facilities is not allowed.
(d) There are no working toilet facilities at this site. The Contractor shall insall a portable toilet for use, and remove at conclusion of project.
(e) Camping: Campgrounds are located near the project site. For camping permit information, go to the Prospect Ranger Station – 47201 Hwy 62, Prospect OR, (541) 560-3400.
(f) Fuel storage is not allowed within the project site unless noted elsewhere.
(g) Construction activity shall take place during the work week. Weekends are considered to begin at 5 pm on Fridays and end at 7 am on Mondays. Project activities shall not disrupt normal functions (domestic water service, road access, electrical service, etc.) without 72 hours’ notice and shall be limited to six (6) hours per occurrence.
(h) Recreation Restrictions – Work activities (such as tree felling, yarding, hauling on roads not generally used by the public, muffled blasting, use of heavy equipment) that produce loud noises above ambient levels, or produce thick smoke that would enter the stand, should be limited to the work week (Monday-Friday) after 8:00 a.m. between May 1 and September 30; and not allowed on National Holidays or weekends between July 1 and September 30
(i) Wildlife Restrictions (Northern Spotted Owl): Currently there are no known Northern Spotted Owls (NSO) within the project area. If NSO’s are found to be within the project area the Forest Service will notify the contractor in writing and the following provisions must be met:
Work activities (such as tree felling, yarding, hauling on roads not generally used by the public, muffled blasting) that produce loud noises above ambient levels, or produce thick smoke that would enter the stand, will not occur within restricted distances of any spotted owl nest site or activity center of known pairs and resident singles, un-surveyed suitable Nesting Roosting Foraging (NRF) habitat between 1 March and 30 September – unless protocol surveys have determined the activity center or NRF habitat to be not occupied, non-nesting, or failed in their nesting attempt.
Restricted area is calculated as a radius from the assumed nest site or un-surveyed NRF habitat patch. Restricted Distances: ≤65 yards for chainsaws; ≤60 yards for impact pile driver, jackhammer, or rock drill; ≤35 yards for heavy equipment.
(j) Archeological Restrictions: If cultural materials or human remains are discovered during project activities, notify the CO. All work in that area shall stop and the area is to be secured until the Forest archeologist has done an assessment.
H-3 Utilities
(a) Sewer: Not available
(b) Water: Available in reasonable quantities
(c) Electrical: Not available
H-4 Hazardous Conditions Safety Plan Certification
The following conditions have been identified as inherently hazardous to a degree that failure to take the proper precautions could lead to serious injury or loss of life. This listing shall not be construed as all inclusive. The Contractor shall certify that his/her Safety Plan conforms to the requirements of OSHA. The Safety Plan certification shall be submitted prior to commencing work on the project. Appropriate actions shall be taken by the Contractor to implement this plan during performance and to take any and all other necessary steps to mitigate the dangers from hazard.
| x |
| Confined space entry |
| x |
| Temporary excavation/deep trenching/slope stability |
Tree felling
Fall hazard from work heights exceeding six feet
Blasting
| x |
| Traffic control on limited visibility roads |
| x |
| Heavy equipment operation |
| x |
| Suspended loads |
Tree climbing and/or tower climbing
Fire hazards
| x |
| Hazardous materials handling |
| x |
| Electrical hazard |
| x |
| Hydraulic and/or pneumatic and/or high pressure hazards |
Steep slopes and/or downed logs
| x |
| Insects |
H-5 Product Substitution, Shop Drawings and Material Certification
(a) Product Substitution. Any modification of other items, designs, materials, products or equipment (including Government Furnished Property or Government Furnished Material), made necessary because of a substitution, shall be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.
(b) Shop Drawings and Submittals. The following submittals shall be submitted for approval within 10 calendar days after Notice to Proceed as required by the clause or specification unless noted elsewhere or alternative arrangements are made in advance with the project Contracting Officer:
| Basic | Detailed | Number | Government | ||||
| Reference | Requirements | of Copies | Approval for | ||||
| Brief Title | Section | Section | To Submit | Submittal__ |
| Construction Schedule | I | FAR 52.236-15 | 2 | 14 days | ||||
| Quality Control | 01 41 00 | 1.03 | 2 | 14 days | ||||
| Project Closeout | 01 77 00 | 3.02 | 2 | 14 days | ||||
| Cast-In-Place-Concrete | 03 30 00 | 1.1 | 2 | 14 days | ||||
| Prefor. Metal Roof Panels | 07 41 13 | 1.03 | 2 | 14 days | ||||
| Siding | 07 46 00 | 1.1 | 2 | 14 days | ||||
| Joint Sealants | 07 92 00 | 1.02 | 2 | 14 days | ||||
| Hollow Doors & Frames | 08 11 13 | 1.2 | 2 | 14 days | ||||
| Door Hardware | 08 71 00 | 1.2 | 2 | 14 days | ||||
| Painting | 09 91 00 | 1.2 | 2 | 14 days | ||||
| Water Meters & Gauges | 22 05 19 | 1.03 | 2 | 14 days | ||||
| Facility Water Distr. Piping | 22 11 13 | 1.05 | 2 | 14 days | ||||
| High Density Polyeth. Pipe | 22 11 15 | 1.04 | 2 | 14 days | ||||
| Underground Boring | 22 11 40 | 1.05 | 2 | 14 days | ||||
| Water Hydrants | 22 11 50 | 1.03 | 2 | 14 days | ||||
| Valves | 22 12 16 | 1.05 | 2 | 14 days | ||||
| Valve Boxes | 22 12 17 | 1.03 | 2 | 14 days | ||||
| Underground Control Cable | 26 04 00 | 1.3 | 2 | 14 days | ||||
| Electrical | 26 05 00 | 1.4 | 2 | 14 days | ||||
| Electrical Components | 26 05 01 | 1.2 | 2 | 14 days | ||||
| Overcurrent Protect. Device | 26 05 73 | 1.3, 1.4 | 2 | 14 days | ||||
| Power Dist. & Motor Cont. | 26 27 00 | 1.2 | 2 | 14 days | ||||
| Excavation & Backfill | 31 23 17 | 1.02 | 2 | 14 days |
Certified Payroll Record
| WH-347 (submit weekly) | I | FAR 52.222-8 | 1 | N/A | ||
| Safety Plan Certification | H-4 Hazardous Conditions | 1 | N/A | |||
| SPCC Plan (> 1320 Gal.) | H-7 Landscape Preservation | 1 | N/A | |||
| Fire Plan | Section J Fire Protection and | 1 | N/A | |||
| Suppression |
Government has 14 calendar days to review packet of submittals unless noted elsewhere such as in the specifications. Ommission from this list doesn’t releave the Contractor from submitting documentation as required by the specifications.
H-6 Permits and Responsibilities ( See Section I – FAR Clause 52.236—7)
Contractor is responsible for obtaining a State Electrical Inspection Permit and for having the inspections performed. . ODOT Permit to Occupy or Perform Operations upon a State Highway is required, see Section 22 11 40. Contractor is responsible to comply with all codes, laws and regulations applicable to this work.
H-7 Landscape Preservation
(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
(b) Prevention of Oil Spills. If the Contractor maintains storage facilities for oil or oil products onsite, appropriate preventive measures shall be taken to insure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual States. Servicing of all equipment shall be done only in the area approved by the Contracting Officer. If the total oil or oil products storage exceeds 5000 liters (1,320 gallons) or if any single container exceeds a capacity of 2500 liters (660 gallons), the Contractor shall prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer. The Contractor will be required to make reasonable attempts to preserve the scenic and natural environment along this construction project.
(c) Trash and Refuse - Contractor shall remove all of his own trash and refuse from the contract area. Material to be removed includes, but is not limited to; used engine oil, oil filters, oil cans, grease cartridges, camp refuse such as tin cans, paper, garbage, etc. This material must be removed to a State, County, or Municipality-designated solid waste disposal area.
(d) Protection of Botanical Resources - Previously unknown or unlisted populations of Protected, Endangered, Threatened, or Sensitive (PETS) plant species, or potential habitat for PETS species, may be located within the contract project boundaries. Deletion of part of some contract areas may be required to protect these botanical resources. The addition or substitution of other areas may be considered in these cases to maintain contract quantities. The modification of the contract may be required to protect or enhance previously unknown PETS plant populations.
(e) Erosion Prevention and Control - Contractors operations shall be conducted reasonably to minimize soil erosion. Equipment shall not be operated when ground conditions are such that excessive damage will result. The kinds and intensity of erosion control work done by the Contractor shall be adjusted to ground and weather conditions and the need for controlling runoff. Erosion control work shall be kept current immediately proceeding expected seasonal periods of precipitation or runoff.
If the Contractor fails to do seasonal erosion control work prior to any seasonal period of precipitation or runoff, the Government may (1) by contract or otherwise, perform erosion control work and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such erosion control work or (2) terminate the contract for default.
| H-8 |
| PAYMENTS FOR INCIDENTAL ITEMS |
The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with plans, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered indirect to and included in the payment for items shown.
| H-9 |
| PERFORMANCE AND PAYMENT BOND AMOUNTS WITH OPTION ITEMS |
The Contracting Officer, based on the contract clause entitled “Additional Bond Security (FAR 52.228-2) may require an increase in the penal sum of the bond if the option item(s) is (are) exercised after the initial award. The increase, if any, will be based on an amount no greater than the total contract price, as modified. The Contracting Officer reserves the right to maintain the penal sums based on the original contract amounts if Option Item additions are minimal, or if Base item performance completion is substantial.
| H-10 |
| RELEASE OF PERFORMANCE AND PAYMENT BONDS |
Performance and payment security furnished under this contract must be retained by the Government for a minimum of one year after acceptance of all work under the contract including any applicable warranty period. Performance and payment security other than corporate or individual surety bonds will be returned to the Contractor one year after completion of work if no claims against these bonds have been filed at that time.
H-11 AGAR 452.228-71 INSURANCE COVERAGE (NOV 1996)
Pursuant to FAR clause 52.228-5, Insurance – Work on a government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:
(a) Workers Compensation and Employer’s Liability. The Contractor is required to comply with applicable Federal and State worker’s compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer’s liability section of the insurance policy, except when contract operations are so commingled with a Contractor’s commercial operations that it would not be practical to require this coverage. Employer’s liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker’s compensation to be written by private carriers.
(b) General Liability. The Contractor shall have bodily injury liability insurance coverage written on a comprehensive form of policy of at least $500,000 per occurrence.
(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.
(End of Clause)
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I-1. FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
| 52.202-1 | Definitions (NOV 2013) |
| 52.203-3 | Gratuities (APR 1984) |
| 52.203-5 | Covenant Against Contingent Fees (APR 1984) |
| 52.203-6 | Restrictions on Subcontractor Sales to the Government (SEP 2006) |
| 52.203-7 | Anti-Kickback Procedures (OCT 2010) |
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
(MAY 2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014)
| 52.203-12 | Limitation on Payments to Influence Certain Federal Transactions (OCT 2010) |
| 52.203-17 | Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (APR 2014) |
| 52.204-4 | Printed or Copied Double-Sided on Recycled Paper (MAY 2011) |
| 52.204-10 | Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2015) |
| 52.204-13 | System for Award Management Maintenance (JUL 2013) |
52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015)
| 52.211-18 | Variation in Estimated Quantity (APR 1984) |
| 52.215-2 | Audit and Records -- Negotiation (OCT 2010) |
| 52.219-6 | Notice of Total Small Business Set-Aside (NOV 2011) |
| 52.219-8 | Utilization of Small Business Concerns (OCT 2014) |
| 52.219-14 | Limitations on Subcontracting (NOV 2011) |
| 52.222-3 | Convict Labor (JUN 2003) |
| 52.222-4 | Contract Work Hours and Safety Standards Act -- Overtime Compensation (MAY 2014) |
| 52.222-6 | Davis-Bacon Act (MAY 2014) |
| 52.222-7 | Withholding of Funds (MAY 2014 |
| 52.222-8 | Payrolls and Basic Records (MAY 2014) |
| 52.222-9 | Apprentices and Trainees (JUL 2005) |
| 52.222-10 | Compliance with Copeland Act Requirements (FEB 1988) |
| 52.222-11 | Subcontracts (Labor Standards) (MAY 2014) |
| 52.222-12 | Contract Termination - Debarment (MAY 2014) |
| 52.222-13 | Compliance with Davis-Bacon and Related Act Regulations (MAY 2014) |
| 52.222-14 | Disputes Concerning Labor Standards (FEB 1988) |
| 52.222-15 | Certification of Eligibility (MAY 2014) |
| 52.222-21 | Prohibition of Segregated Facilities (APR 2015) |
| 52.222-26 | Equal Opportunity (APR 2015) |
| 52.222-27 | Affirmative Action Compliance Requirements for Construction (APR 2015) |
| 52.222-35 | Equal Opportunity for Veterans (OCT 2015) |
| 52.222-36 | Affirmative Action for Workers with Disabilities (JUL 2014) |
| 52.222-37 | Employment Reports on Veterans (OCT 2015) |
| 52.222-40 | Notification of Employee Rights under the National Labor Relations Act (DEC 2010) |
| 52.222-50 | Combating Trafficking in Persons (MAR 2015) |
| 52.222-54 | Employment Eligibility Verification (OCT 2015) |
| 52.223-2 | Affirmative Procurement of Biobased Products under Service and Construction Contracts (SEP 2013) |
| 52.223-5 | Pollution Prevention and Right-to-Know Information (MAY 2011) |
| 52.223-6 | Drug-Free Workplace (MAY 2001) |
| 52.223-18 | Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) |
| 52.225-13 | Restrictions on Certain Foreign Purchases (JUN 2008) |
| 52.227-1 | Authorization and Consent (DEC 2007) |
| 52.227-2 | Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007) |
| 52.227-4 | Patent Indemnity -- Construction Contracts (DEC 2007) |
| 52.228-2 | Additional Bond Security (OCT 1997) |
| 52.228-11 | Pledges of Assets (JAN 2012) |
| 52.228-12 | Prospective Subcontractor Requests for Bonds (May 2014) |
| 52.228-14 | Irrevocable Letter of Credit (NOV 2014) |
| 52.228-15 | Performance and Payment Bonds – Construction (OCT 2010) |
| 52.229-3 | Federal, State, and Local Taxes (FEB 2013) |
| 52.232-5 | Payments under Fixed-Price Construction Contracts (MAY 2014) |
| 52.232-17 | Interest (OCT 2010) |
| 52.232-23 | Assignment of Claims (JAN 1986) |
52.232-27 Prompt Payment for Construction Contracts (JUL 2013)
| 52.232-33 | Payment by Electronic Funds Transfer – System for Award Management (JUL 2013) |
| 52.232-39 | Unenforceability of Unauthorized Obligations (JUN 2013) |
| 52.232-40 | Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) |
| 52.233-1 | Disputes (JUL 2002) |
| 52.233-3 | Protest after Award (AUG 1996) |
| 52.233-4 | Applicable Law for Breach of Contract Claim (OCT 2004) |
| 52.236-2 | Differing Site Conditions (APR 1984) |
| 52.236-3 | Site Investigation and Conditions Affecting the Work (APR 1984) |
| 52.236-5 | Material and Workmanship (APR 1984) |
| 52.236-6 | Superintendence by the Contractor (APR 1984) |
52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984)
| 52.236-13 | Accident Prevention (NOV 1991) |
| 52.236-14 | Availability and Use of Utility Services (APR 1984) |
| 52.236-15 | Schedules for Construction Contracts (APR 1984) |
| 52.236-17 | Layout of Work (APR 1984) |
| 52.236-21 | Specifications and Drawings for Construction (FEB 1997) |
Alternate I (APR 1984)
| 52.236-26 | Preconstruction Conference (FEB 1995) |
| 52.242-13 | Bankruptcy (JUL 1995) |
| 52.243-4 | Changes (JUN 2007) |
| 52.244-6 | Subcontracts for Commercial Items (DEC 2013) |
| 52.245-1 | Government Property (APR 2012) |
| 52.246-21 | Warranty of Construction (MAR 1994) |
Alternate I (APR 1984)
| 52.248-3 | Value Engineering – Construction (OCT 2010) |
| 52.249-2 | Termination for Convenience of the Government (Fixed-Price) (APR 2012)--Alternate I (SEP 1996) |
| 52.249-10 | Default (Fixed-Price Construction) (APR 1984) |
| 52.253-1 | Computer Generated Forms (JAN 1991) |
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
| 452.232-70 | Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) |
| 452.236-71 | Prohibition Against the Use of Lead-Paint (NOV 1996) |
| 452.236-72 | Use of Premises (NOV 1996) |
| 452.236-73 | Archeological or Historic Sites (FEB 1988) |
| 452.236-74 | Control of Erosion, Sedimentation and Pollution (NOV 1996) |
| 452.236-76 | Samples and Certificates (FEB 1988) |
| 452.236-77 | Emergency Response (NOV 1996) |
I-2 52.204-7 System for Award Management. (JUL 2013)
(a) Definitions. As used in this provision— “Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.
“Data Universal Numbering System +4 (DUNS+4) number” means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional System for Award Management records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.
“Registered in the System for Award Management (SAM) database” means that—
(1) The offeror has entered all mandatory information, including the DUNS number or the DUNS+4 number, the Contractor and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see Subpart 4.14) into the SAM database;
(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in the SAM database;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and
(4) The Government has marked the record “Active”.
(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS +4” followed by the DUNS or DUNS +4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the SAM database.
(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number—
(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company Physical Street Address, City, State, and ZIP Code.
(iv) Company Mailing Address, City, State and ZIP Code (if separate from physical).
(v) Company Telephone Number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(d) If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) Offerors may obtain information on registration at https://www.acquisition.gov .
(End of clause)
I-4 FAR 52.219-28 Post-Award Small Business Program Representation (JUL 2013)
(a) Definitions. As used in this clause—
Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is “not dominant in its field of operation” when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.
(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts—
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/content/table-small-business-size-standards.
(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.
(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the rerepresentation required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its data in SAM, as necessary, to ensure that they reflect the Contractor’s current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.
(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.
(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in ORCA for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
The Contractor represents that it is, is not a small business concern under NAICS Code ______________ assigned to contract number ______________.
[Contractor to sign and date and insert authorized signer’s name and title].
I-5 FAR 52.225-9 Buy American Act-Construction Materials (MAY 2014)
(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .