Amendment 2

Text of this file

Solicitation No. AG-0489-S-10-0433 , Amendment No. 2 Page 2 of 3

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

CONTRACT ID CODE

PAGE OF PAGES

2 AMENDMENT NO.

2 (TWO)

3. EFFECTIVE DATE

05/11/2010

4. REQUISITION/PUCHASE REQ. NO.

5. PROJECT NO.(IF APPLICABLE)

6. ISSUE BY CODE

7.ADMINISTERED BY (if other than item 6) CODE

EROC - NW

Mt Hood National Forest 16400 Champion Way Sandy, OR 97055

8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code) X 9A.Amend Solicitation No. AG-0489-S-10-0433

X 9B.Dated 04/12/2010

10A.Mod Contract/Order #

10B.Dated (see Item 13) code facility code

11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION

[X] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [ X ] is extended [ ] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. This change order is issued pursuant to; (specifiy authority) The changes set forth in item 14 are made in the Contract/Order # in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..

C. This supplemental agreement is entered into pursuant to authority of:

D Other: (Specify type of modification and authority):

E. IMPORTANT: Contractor [ ] is not [ ] is required to sign this document and return _ Original to the issuing office.:

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

Middlefork Campground Drainage Repair

Refer to the Schedule of Items and note the changes to Item 20419(A) and 941(01):

Please use the attached Revision #2 Schedule of Items when submitting your bid, also attached are some clarifications to the specifications.

The date for Receipt of offers is extended to May 20, 2010.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A.NAME AND TITLE OF SIGNER (Type or print)

16A.NAME AND TITLE OF CONTRACTING OFFICER

Ellen Holroyd

15B.CONTRACTOR/OFFEROR

By ______________________________ (Signature of person authorized to sign)

15C.DATE SIGNED

16B.UNITED STATES OF AMERICA

/s/ Ellen Holroyd (Signature of Contracting Officer)

16C.DATE SIGNED

04/26/2010 Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243

B- 1 –AMENDMENT 02 REVISED SCHEDULE OF ITEMS

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101

Mobilization

Lump Sum

15713

Erosion and pollution control

Lump Sum

20305

Removal of 18” culvert and disposal

Each

20419(A)

Drainage excavation, 10’ x 8’ debris channel cleanout and stabilization.

Foot

20419(B)

Drainage excavation, debris channel: 20’h x 6’v x 200’, and 5’ x 5’ x 150’ ditch construction

Foot

25101(A)

Placed riprap, class 3, method A

Cubic Yard

25101(B)

Placed riprap, class 4, method B

Cubic Yard

25251 Barrier Rock, class 8 Each

32202 Crushes aggregate, type surfacing 5/8” minus, compaction B Ton

60275(A)

18 Inch high density polyethylene pipe with smooth interior and annular exterior, compaction method B

Foot

60275(B)

48 Inch high density polyethylene pipe with smooth interior and annular exterior, compaction method B

Foot

60275(C)

60 Inch high density polyethylene pipe with smooth interior and annular exterior, compaction method B

Foot

63551

ARRA Sign with posts including installation

Lump Sum

941(01) Trail: Aggregate surfacing, 5/8” minus, compaction C Foot

Total $___________

Bid Item 15713 Erosion and Polution control: This is for keeping sediment from becoming mobile both during and after the project. The method is up to the Contractor could be a silt fence or weed free straw bales, but must be effective.

Bid Item 20305 Removal of 18” culvert and disposal: The 18” culvert is located at Campsites #5 and #8 plus 2 directly south of campsite #5

Bid Item 20419(A) Drainage excavation, debris channel: 20’h X 6’v X 200’, and 5’ X 5’ X 150’ ditch construction: this occurs half way between campsite #4 and #3 and should total 100’ (see revised schedule of items)

Bid Item 32202 Crushed aggretate, type surfacing 5/8” minus, compaction B: The conversion factor for this item used is 1.3.

Bid Item 63551 Arra Sign with posts including installation: See attached sign information. Placement of the sign is at the front of the project where the public can view it. Most likely it will go at the campground enterance. The Government will determine the exact location at time of installation.

Bid Item 941(01) Trail Aggregate surfacing, 5/8” minus, compaction C: the depth will be 3” across the entire 150’ by 3’. (revised schedule of items reflects 150’)

Bid Items 60275(B) and 60275(C) Pipe on these two items may vary in standard purchase lengths but for this project the lengths indicated are what is required for this project.

ARRA Sign information:

American Recovery and Reinvestment Act Sign Guidance On March 3, 2009 President Obama made the commitment that all projects funded by the American Recovery and Reinvestment Act (ARRA) will bear a recovery emblem to make it easier for Americans to see which projects are funded by the ARRA. To meet this commitment, FHWA strongly encourages agencies to use the economic recovery signs on all projects funded by the ARRA. The following factors should be considered with respect to design and placement of these signs:

Sign Design:

All economic recovery sign design layout and color should be similar to the sign design attached with this guidance.

Sign Placement:

With respect to placement of traffic control signs, regulatory, warning, and guide signs have a higher priority than the economic recovery signs.

In no case shall these signs be placed such that it obscure road users' view of other traffic control devices.

Economic recovery signs should be placed where they can be easily identified with the corresponding projects.

If the placement of economic recovery signs conflicts with newly installed higher priority signs, or traffic signals, or temporary traffic control devices, or other priority devices, the economic recovery sign should be relocated.

Due to public safety concerns, economic recovery signs should not be allowed at the following locations:

On the front, back, adjacent to or around any traffic control device, including traffic signs, signals, changeable message signs, traffic control device posts or structures, or bridge piers.

At key decision points where a driver's attention is more appropriately focused on traffic control devices, roadway geometry, or traffic conditions. These locations include, but are not limited to exit and entrance ramps, intersections controlled by traffic signals or by stop or yield signs, highway-rail grade crossings, and areas of limited sight distance.

See http://www.fhwa.dot.gov/economicrecovery/arrasigndetail.pdf" http://www.fhwa.dot.gov/economicrecovery/arrasigndetail.pdf for sign detail.

Other files for this federal contract opportunity

Other files attached to RECOVERY - Middle Fork CG Day-use Area Repair, newest first.
File Type Posted
Amendment 01.rtf RTF text file
MIDDLEFORK-NOTES_ ESTIMATE OF QUATITIES3.pdf PDF
3 fire clauses.doc DOC document
WA1_dvb.docx DOCX document
MIDDLEFORK-VICINITY MAP2.pdf PDF
sf25a_e.pdf PDF
MIDDLEFORK-CONSTRUCTION SITE PLAN4.pdf PDF
MIDDLEFORK-TRAIL CONST DETAILS6.pdf PDF
Middlefork CG dainage REPAIR SPECIFICATIONS.doc DOC document
MIDDLEFORK-TITLE SHEET1.pdf PDF
Experience Questionnaire.doc DOC document
MIDDLEFORK-CULVERT CONSTRUCTION DETAILS5.pdf PDF
Middle Fork_RFQ.doc DOC document
Show all 13

On GovTribe

Work with this file on GovTribe