Solicitation No. AG-0489-S-10-0433 , Amendment No. 1 Page 2 of 2

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

CONTRACT ID CODE

PAGE OF PAGES

2 AMENDMENT NO.

1 (ONE)

3. EFFECTIVE DATE

04/26/2010

4. REQUISITION/PUCHASE REQ. NO.

5. PROJECT NO.(IF APPLICABLE)

6. ISSUE BY CODE

7.ADMINISTERED BY (if other than item 6) CODE

EROC - NW

Mt Hood National Forest 16400 Champion Way Sandy, OR 97055

8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code) X 9A.Amend Solicitation No. AG-0489-S-10-0433

X 9B.Dated 04/12/2010

10A.Mod Contract/Order #

10B.Dated (see Item 13) code facility code

11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION

[X] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [ ] is extended [ X ] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. This change order is issued pursuant to; (specifiy authority) The changes set forth in item 14 are made in the Contract/Order # in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..

C. This supplemental agreement is entered into pursuant to authority of:

D Other: (Specify type of modification and authority):

E. IMPORTANT: Contractor [ ] is not [ ] is required to sign this document and return _ Original to the issuing office.:

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

Middlefork Campground Drainage Repair

Refer to the Schedule of Items and note the following change:

Item 60275c 60 inch High Density Polyethyleme Pipe should show Estimated Quantity of 35 not 1. Please use the attached Revised Schedule of Items when submitting your bid.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A.NAME AND TITLE OF SIGNER (Type or print)

16A.NAME AND TITLE OF CONTRACTING OFFICER

Ellen Holroyd

15B.CONTRACTOR/OFFEROR

By ______________________________ (Signature of person authorized to sign)

15C.DATE SIGNED

16B.UNITED STATES OF AMERICA

/s/ Ellen Holroyd (Signature of Contracting Officer)

16C.DATE SIGNED

04/26/2010 Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243

B- 1 – REVISED SCHEDULE OF ITEMS

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101

Mobilization

Lump Sum

15713

Erosion and pollution control

Lump Sum

20305

Removal of 18” culvert and disposal

Each

20419(A)

Drainage excavation, 10’ x 8’ debris channel cleanout and stabilization.

Foot

20419(B)

Drainage excavation, debris channel: 20’h x 6’v x 200’, and 5’ x 5’ x 150’ ditch construction

Foot

25101(A)

Placed riprap, class 3, method A

Cubic Yard

25101(B)

Placed riprap, class 4, method B

Cubic Yard

25251 Barrier Rock, class 8 Each

32202 Crushes aggregate, type surfacing 5/8” minus, compaction B Ton

60275(A)

18 Inch high density polyethylene pipe with smooth interior and annular exterior, compaction method B

Foot

60275(B)

48 Inch high density polyethylene pipe with smooth interior and annular exterior, compaction method B

Foot

60275(C)

60 Inch high density polyethylene pipe with smooth interior and annular exterior, compaction method B

Foot

63551

ARRA Sign with posts including installation

Lump Sum

941(01) Trail: Aggregate surfacing, 5/8” minus, compaction C Foot

Total $___________

Other files for this federal contract opportunity

Other files attached to RECOVERY - Middle Fork CG Day-use Area Repair, newest first.
File Type Posted
Amendment 02.rtf RTF text file
MIDDLEFORK-NOTES_ ESTIMATE OF QUATITIES3.pdf PDF
Middlefork CG dainage REPAIR SPECIFICATIONS.doc DOC document
MIDDLEFORK-TITLE SHEET1.pdf PDF
Experience Questionnaire.doc DOC document
MIDDLEFORK-CULVERT CONSTRUCTION DETAILS5.pdf PDF
MIDDLEFORK-VICINITY MAP2.pdf PDF
sf25a_e.pdf PDF
MIDDLEFORK-CONSTRUCTION SITE PLAN4.pdf PDF
MIDDLEFORK-TRAIL CONST DETAILS6.pdf PDF
3 fire clauses.doc DOC document
WA1_dvb.docx DOCX document
Middle Fork_RFQ.doc DOC document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .