Table of Contents_Suppl_Specs.docx

DOCX document 21 KB Posted

Attached to
RECOVERY: EEL CREEK BRIDGE Federal contract opportunity
Solicitation number
AG-0489-S-10-0388
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Northwest

About this file

TABLE OF CONTENTS SUPPL SPECS

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY: EEL CREEK BRIDGE, newest first.
File Type Posted
supplemental specs.docx DOCX document
Drawings.pdf PDF
Return.doc DOC document
RFP_Eel Creek Bridge.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Supplemental Specifications Table of Content

Preface1
101 - Terms, Format, and Definitions2
101.01 Meaning of Terms2
101.03 Abbreviations.2
101.04 Definitions.2
102 - Bid, Award, and Execution of Contract5
102 Bid, Award, and Execution of Contract5
103 - Scope of Work6
Deletions6
104 - Control of Work7
Deletions7
104.03 Specifications and Drawings.7
104.06 Use of Roads by Contractor8
105 - Control of Material9
105.02 Material Sources.9
105.02(a) Government-provided sources.9
105.05 Use of Material Found in the Work.9
106 - Acceptance of Work10
106.01 Conformity with Contract Requirements.10
106.07 Delete12
107 - Legal Relations and Responsibility to the Public13
107.05 Responsibility for Damage Claims.13
107.06 Contractor’s Responsibility for Work.13
107.09 Legal Relationship of the Parties.13
107.10 Environmental Protection.13
108 - Prosecution and Progress15
108 Delete.15
109 - Measurement and Payment16
109 Deletions16
109.02 Measurement Terms and Definitions.16
152 - Construction Survey and Staking17
152.00 Construction Survey and Staking17
153 - Contractor Quality Control22
153.04 Records.22
155 - Schedules for Construction Contracts23
155 Delete.23
156 - Public Traffic24
156.03 Accommodating Traffic During Work.24
156.04 Maintaining Roadways During Work.24
156.08 Traffic and Safety Supervisor.24
157 - Soil Erosion Control25
157.03 General25
201 - Clearing and Grubbing26
201.01 Description26
201.04 Clearing. (c)26
203 - Removal of Structures and Obstructions27
203.01 Description.27
251 - Riprap28
251.03 General.28
404 - Minor Hot Asphalt Concrete29
404.02 Composition of Mix (Job-Mix Formula).29
404.04 Weather Limitations.29
404.06 Placing.29
404.07 Compacting (a).30
404.09 Acceptance.31
Table 404-1. Sampling and Testing Requirements.31
412 - Asphalt Tack Coat32
412.07 Acceptance32
551 - Driven Piles33
551.03 Pile Driving Equipment.33
552 - Structural Concrete35
552.02 Material.35
553 - Prestressed Concrete39
553.02 Material.39
554 - Reinforcing Steel42
554.03 Order Lists.42
555 - Steel Structures43
555.18 Welding.43
556 - Bridge Railing44
556.01 Description.44
611 - Water System45
611.01 Description.45
612 - Sanitary Sewer Systems46
612.01 Description.46
617 - Guardrail48
617.02 Material.48
634 - Permanent Pavement Marking49
634.03 General.49
635 - Temporary Traffic Control50
635.03 General.50
701 - Cement51
701.02 Masonry and Mortar Cement.51
709 - Reinforcing Steel and Wire Rope53
709.01 Reinforcing Steel.53
712 - Joint Material55
712.01 Sealants, Fillers, Seals, and Sleeves.55
717 - Structural Metal56
717.01Structural Steel56
718 - Traffic Signing and Marking Material58
718.02 Reserved.58
718.02 Protective Overlay Film and Edge Film.58
718.05 Aluminum Panels58

File details come from the government source that posted it. Updated .