SUPPLEMENTAL SPECS

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY: EEL CREEK BRIDGE, newest first.
File Type Posted
Drawings.pdf PDF
Return.doc DOC document
Table of Contents_Suppl_Specs.docx DOCX document
RFP_Eel Creek Bridge.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Preface Preface_wo_03_15_2004_m Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp
Milepost
ppm
Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005 102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work 103.00_nat_us_02_16_2005 Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work 104.00_nat_us_06_16_2006 Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.03_nat_us_02_22_2005

104.03 Specifications and Drawings.

Add the following:

(c) As-Built-Plans. Furnish one set of as built plans. The Government will provide one set of contract plans to be used exclusively for recording the as-built details of the project. Use red pencil or red ink to record the information on the as-built plans.

Note all additions or revisions to the location, character, and dimensions of the prescribed work shown on the contract plans. Line out all details shown that are not applicable to the completed work. Check off details shown that were incorporated into the completed work without change.

Retain the plans at the project site and, as work progresses, continually update them to reflect the as-built details. Upon request, make the plans available to the CO to review for compliance with these specifications.

Show the following types of changes on the as-built plans:

(1) Typical section(s)

(a) Revisions in dimensions

(b) Revisions in materials

(2) Plan and profile

· Revisions to the alignment

· Changes in the construction limits

· Revisions in location, type, and grade of road approaches

· Location and type of utilities

· Location, size, and type of underdrains

· Skew of culverts

· Channel changes

· Location of monuments and permanent references

· Elevations for all aerial and underground crossings of utilities

· Location, length, and type of fencing

· Revisions to grades, elevations, and stationing of intersection PIs

· Equations

· Culvert diameter, length, type, and stationing. On culvert extensions, indicate the length of the existing pipe and the length of the extension.

· Location, length, stationing, and type of retaining walls

· Location, length, stationing, and end treatment of guardrail

(3) Bridge

(a) Stationing of bridge ends

(b) Revisions to footing and seal elevations

(c) Pile length, size, type, and tip elevation

(d) Any changes in plan or dimensions including any major changes in reinforcing

(4) Miscellaneous

(a) Revisions to parking areas or turnouts

(b) Final location, type and length of curbs, sidewalks, etc.

Furnish the as-built working plans to the CO before the final inspection. Correct all details found during the final inspection that are not shown on the as-built plans and return to the CO within 5 days.

104.06_nat_us_02_17_2005 Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material 105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work 106.01_nat_us_07_31_2007

106.01 Conformity with Contract Requirements.

Delete Subsection 106.01 and substitute the following:

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

(1) Sampling method;

(2) Number of samples;

(3) Sample transport;

(4) Test procedures;

(5) Testing laboratories;

(6) Reporting;

(7) Estimated time and costs; and

(8) Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

(1) Have the work accepted at a reduced price; or

(2) Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

· Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

· Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

· Exact time and location of spill including a description of the area involved.

· Containment procedures.

· Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

· Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress 108.00_nat_us_02_16_2005 108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment 109.00_nat_us_02_17_2005 109 Deletions Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

152 - Construction Survey and Staking 152.00_nat_us_08_05_2005 Description

152.01(c) Material.

Add the following:

Use required stake dimensions and materials. Pre-paint the top 2 inches of all stakes and lath, or mark them with plastic flagging. Use designated colors for paint or flagging. Mark all stakes with a stake pencil that leaves a legible imprint, or with waterproof ink.

Do not use aerosol spray paints.

Use moisture-resistant paper for survey notes. Keep notes in books with covers that will protect the contents and retain the pages in numerical sequence.

Construction Requirements

152.02 General.

Delete the first two sentences.

Add the following:

When indicated on the plans, a preliminary survey line has been established on the ground. The project location line is established by offsets from this preliminary line.

Delete second sentence in second paragraph and replace with the following:

Reestablish missing reference, control lines, or stakes as necessary to control subsequent construction staking operations

152.03 Survey and Staking Requirements.

(b) Roadway cross-sections.

Replace the first two sentences with the following:

Take roadway cross-sections normal to centerline. When the centerline curve radius is less than or equal to 200 feet, take cross-sections at a maximum centerline spacing of 25 feet. When the centerline curve radius is greater that 200 feet take cross-sections at a maximum centerline spacing of 80 feet.

c) Slope Stakes & References:

Replace section with the following:

Slope stakes and references. When required, locate slope stakes on designated portions of the road. Locate the slope stake catch points and use them to establish clearing limits and slope stake references.

Mark slope stakes with the station, the amount of cut or fill, the horizontal distance to centerline, and the slope ratios.

Place slope reference stakes at least 10 feet outside the clearing limit and mark with the offset distance to the slope stake. Place sight stakes when required.

Prior to clearing and grubbing operations, move the slope stake outside the clearing limit to the slope reference stake. After clearing and grubbing and before excavation, reset the slope stakes in their original position.

Use the designated method to establish the slope stake catchpoint.

· Method I—Computed Method. Use the template information shown in the plans or other Government-provided data to calculate the actual location of the catchpoint. The slope stake “catchpoint distance” provided may be used as a trial location to initiate slope staking. Recatch slope stakes on any section that does not match the staking report within the tolerances established in Table 152-2.

· Method II—Catchpoint Measurement Method. Determine the location of slope stake catchpoints by measuring the catchpoint distances shown in the plans or other Government-provided data.

(d) Clearing and grubbing limits.

Add the following:

Establish clearing limits on each side of the location line by measuring the required horizontal or slope distances shown in the stake notes. Mark the clearing limits with flagging or tags on trees to be left standing, or on lath. Make markings intervisible, and no more than 90 feet apart.

After establishing clearing limits, move the location line stake outside the clearing limits for station identification purposes, and mark it with horizontal distance to location line

(e) Centerline reestablishment.

Replace with the following:

Reestablish centerline from instrument control points. The maximum spacing between centerline points is 25 feet when the centerline curve radius is less than or equal to 200 feet. When the centerline curve radius is greater than 200 feet, the maximum distance between centerline points is 80 feet.

(g) Culverts.

Replace subsection with the following:

Set culvert reference stakes at all culvert locations. Set a culvert reference stake on the centerline of the culvert 10 feet from each end or beyond the clearing limit, whichever is greater. Record the following on culvert reference stakes:

(1) Diameter, actual field measured length, and type of culvert.

(2) The vertical and horizontal distance from the reference stake to the invert at the ends of the culvert.

(3) Station of actual point where culvert intersects centerline.

When required, stake headwall for culverts by setting a hub with a guard stake on each side of the culvert on line with the face of the headwall. Perform this work after clearing is completed.

152.03 (l) Miscellaneous Survey and Staking.

Add the following:

(11) Cattleguards

(12) Drain Dips

(13) Erosion Control Measures

Replace Table 152-1 with the following two tables:

Table 152-1 Tolerances for reestablishing P-line, traverse, and elevations.

Precision Class

Minimum Position Closure
Angular Accuracy (±)
L-Line Tangent Control Pointsa (±)

Vertical Closureb (±)

A (Bridges)

1/10,000
2 sets, direct/reverse

10 second rejection limit

N/A
0.02 ft or

0.02ft/1000ftc

B
1/5,000
2 sets, direct/reverse

20 second rejection limit

0.1 ft
0.02 ft or

0.02ft/1000ftc

C
1/1,000
1 set, direct/reverse

1 minute rejection limit

0.2 ft
0.5ft/1000ftc
D
1/300
Foresight and backsight; 15 minute rejection limitc
0.4 ft
1.0ft/1000ftc
E
1/100
Foresight and backsight; 30 minute rejection limitc
0.8 ft
1.0ft/1000ftc

a. Accuracy of offset measurement.

b. Determine vertical closures at intervals not to exceed 2000 ft as measured along centerline.

c. Use greater value.

Table 152-2 Cross section and slope stake tolerances.

Item
Tolerances
A
B
C
D
E
Allowable deviation of cross-section line projection from a true perpendicular to tangents, a true bisector of angle points, or a true radius of curves
(±)2o
(±)3o
(±)3o
(±)5o
(±)5o
Take cross-sections topography measurements so that variations in ground from a straight line connecting the cross-section points will not exceed
0.5 ft
1.0 ft
2.0 ft
2.0 ft
3.0 ft
Horizontal and vertical accuracy for cross-sections, in feet or percentage of horizontal distance measured from traverse line, whichever is greater.
0.1 ft or 0.4%
0.15 ft or 0.6%
0.2 ft or 1.0%
0.2 ft or 1.0%
0.3 ft or 1.0%

Horizontal and vertical accuracy for slope stake, slope stake references, and clearing limits. In feet or percentage of horizontal distance measured from centerline or reference stake, whichever is greater.

Slope reference stakes and slope stakes.
0.1 ft or 0.4%
0.15 ft or 0.6%
0.2 ft or 1.0%
0.2 ft or 1.0%
0.3 ft or 1.0%
Clearing limits
1.0 ft
1.0 ft
1.0 ft
1.5 ft
2.5 ft

153 - Contractor Quality Control 153.04_nat_us_10_24_2007

153.04 Records.

Delete all but the first sentence

155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004 155 Delete.

Delete Section 155 in its entirety.

156 - Public Traffic 156.03_nat_us_02_24_2005

156.03 Accommodating Traffic During Work.

Delete the following from the last paragraph:

according to Subsection 106.07(b)

156.04_nat_us_02_24_2005

156.04 Maintaining Roadways During Work.

(a) Add the following:

Do not construct detours outside of the clearing limits or use alternate route detours without the approval of the CO.

156.08_nat_us_02_24_2005

156.08 Traffic and Safety Supervisor.

Delete this subsection in its entirety.

157 - Soil Erosion Control 157.03_nat_us_02_24_2005

157.03 General

Delete the entire subsection and replace with the following:

Prior to the start of construction, submit a written plan that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control. An alternate erosion control plan with all necessary permits may be submitted 30 days before intended use.

Incorporate all permanent erosion control features into the project at the earliest practicable time, as outlined in the approved plan.

When erosion control measures are not functioning as intended, immediately take corrective action.

201 - Clearing and Grubbing 201.01_nat_us_02_18_2005

201.01 Description

Replace with the following

This work consists of clearing and grubbing within clearing limits and other designated areas.

201.04_nat_us_02_22_2005

201.04 Clearing. (c)

Delete paragraph (c) and replace with the following:

(c) In areas outside the excavation, embankment, and slope rounding limits, cut stumps to within 12 inches or one-third of the stump diameter of the ground, whichever is higher, measured on the side adjacent to the highest ground. For timber sales, stump heights will meet the requirements of the Timber Sale contract.

201.04 Clearing.

Delete subsection (d) and replace with the following:

(d) Do not cut vegetation less than 3 feet tall and less than 3 inches in diameter, that is within the clearing limits but beyond the roadway and not in a decking area, and that does not interfere with sight distance along the road.

Add the following:

(e) Trim branches of remaining trees or shrubs to give a clear height of 14 feet above the roadbed unless otherwise indicated. Trim tree limbs as near flush with the trunk as practicable.

(f) Remove brush from log decks. Deck logs so that logs are piled parallel to one another; can be removed by standard log loading equipment; will not damage standing trees; will not interfere with drainage, and will not roll. Keep logs in log decks free of brush and soil.

203 – Removal of Structures and Obstructions

203.01 Description.

Add the following:

This work also consists of removing, resetting, and maintenance of the temporary bypass structure and bypass road as shown on the construction plans.

203.02 Material.

Add the following:

Backfill material 704.03

203.03 Salvaging Material.

Add the following:

Salvage the existing temporary bypass structure and reset. The reset temporary structure shall span Eel Creek, and shall provide temporary access to the campground during construction. Placement of the temporary bypass structure shall meet the requirements shown on the construction plans and the following;

· No intermediate supports shall be placed in the creek.

· Contractor is responsible for verifying in the field the site conditions and parameters prior to bridge removal and placement.

· Contractor is responsible for temporary supports at both ends of the structure.

Prior to final acceptance of the project salvage the reset temporary structure, transport, and deliver to the location identified in the construction plans.

251 - Riprap 251.03_nat_us_08_05_2009 Construction Requirements

251.03 General.

Add the following:

Place riprap under or adjacent to structures before placing prefabricated superstructure units or constructing superstructure falsework unless otherwise approved by the CO.

251.08 Measurement.

Payment for excavation and embankment required for placement of riprap is indirectly included in the pay item for riprap.

404 - Minor Hot Asphalt Concrete 404.02_nat_us_06_09_2006

404.02 Composition of Mix (Job-Mix Formula).

Delete the second paragraph and replace with the following:

Submit a job-mix formula and supporting documentation, test results, and calculations for the material to be incorporated into the work. Include copies of laboratory test results and mix design data that demonstrate that the properties of the aggregate, additives, and mixture meet the current requirements and criteria of Federal or state agencies. Ensure that the job-mix formula was performed no more than one year prior to placing the hot asphalt concrete. After reviewing the Contractor’s proposed job-mix formula, the CO will determine the final values for the job-mix formula to be used and notify the Contractor in writing.

404.03_0618_us_06_09_2007

404.03 Surface Preparation.

Change the following:

“Subsection 410.05” to “Subsection 401.06”

Add the following:

Apply an asphalt prime coat to contact surfaces of aggregate base according to Section 411.

404.04_nat_us_03_02_2005

404.04 Weather Limitations.

Change 35o F to 45o F:

404.06_nat_us_03_02_2005

404.06 Placing.

Add the following:

Do not place asphalt until the CO has approved in writing the area where it will be placed.

Delete the last sentence and replace with the following:

Offset the longitudinal joint of one layer at least 6 inches from the joint in the layer immediately below. Make the longitudinal joint in the top layer along the centerline of two-lane roadways or at the lane lines of roadways with more than two lanes. Offset transverse joints in succeeding layers and in adjacent lanes at least 10 feet, where possible.

404.07_nat_us_03_02_2005

404.07 Compacting (a).

Delete and replace with the following:

(a) Roadway paving. Thoroughly and uniformly compact the surface a minimum of three passes with rollers that meet one of the following requirements:

(1) Steel-wheeled rollers, other than vibratory type, capable of exerting a force of not less than 1.5 ton/feet of width of the compression roll or rolls.

(2) Vibratory steel-wheel rollers with a minimum mass of 5 ton, equipped with amplitude and frequency controls, and designed to compact asphalt concrete.

(3) Pneumatic-tire rollers with smooth tread tires of equal size that provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 lbf/in2.

Perform initial compaction while the mixture is above 250 °F. Perform finish rolling with steel-wheel rollers and continue until no roller tracks remain.

Eel Creek Bridge CIM-0612-06F Page 58 of 58

404.09_nat_us_03_02_2005

404.09 Acceptance.

Add the following to the second paragraph:

See Table 404-1 for sampling and testing requirements.

Table 404-1. Delete and replace with the following:

Table 404-1. Sampling and Testing Requirements.

Material or Product
Type of Acceptance (Subsection)
Characteristic
Category
Sampling Methods Specifications
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time
Asphalt Mixture (404.09)
-
-
-
AASHTO T 168
Three minimum per project and at least one per 500 Cubic yards
Roadway prior to compaction
yes
As soon as sampled

412 - Asphalt Tack Coat 412.07_nat_us_07_03_2007 Measurement

412.07 Acceptance

Delete the first paragraph and replace with the following:

Emulsified asphalt will be evaluated under Subsections 106.02, 106.03, and 702.07.

551 - Driven Piles 551.03_nat_us_08_05_2009 Construction Requirements

551.03 Pile Driving Equipment

(b) Approval of pile driving equipment.

Delete the first two paragraphs and replace with the following:

Furnish pile driving equipment of such size that the permanent piles can be driven with reasonable effort to the required lengths without damage. The energy of the driving equipment submitted for approval, as rated by the manufacturer, must be at least 10,000 foot-pounds.

(1) Equipment submittal.

Delete the last three sentences in the first paragraph.

(2) Wave equation. Omit this subsection.

0. Pile Lengths.

Delete first paragraph and replace with the following:

Furnish piles in accordance with the itemized pile order list shown on the plans. The order lengths may be longer than the Government estimates will remain in the structure, to provide a margin of safety in case piles have to be driven deeper than anticipated. All piling furnished and paid for is the property of the Government, including piling not driven to full penetration as directed by the CO. For cutoff pile lengths over 10 feet, deliver these to a storage area designated by the CO. For cutoff pile lengths less than 10 feet or any designated to be removed by the CO, remove the material from Forest Service land in accordance with Section 202.

Furnish pile lengths less than 60 feet long as one piece, unless field splices, at the contractors expense, are approved in writing at the time of material submittal.

551.06 Driven Pile Capacity.

Add the following at the end of the first paragraph:

Drive piles to the minimum tip elevations shown on the plans. If a pile reaches refusal above the minimum tip elevation shown on the plans, do not overdrive the pile. Refusal is defined as 7 blows/inch.

Delete paragraph two and subsections (a) and (b).

0. Preparation and Driving.

Delete the second paragraph and replace with the following:

Drive piles to within 3 inches of plan location at cutoff elevation; provide a minimum of 9 inches cover to any cap face. Drive piles so that the axial alignment is within 1/4 inch per foot, along the longitudinal axis, of the required alignment. The CO may stop driving to check the pile alignment. Check alignment of piles that cannot be internally inspected after installation before the last 5 feet are driven. Do not pull laterally on piles or splice to correct misalignment. Do not splice a properly aligned section on a misaligned pile.

551.09 Splices.

(a) Steel Piles.

Delete the last sentence of the last paragraph and replace with the following:

Approved proprietary manufactured splices may be used in place of full penetration groove butt welds; submit manufacturer's literature and attachment instructions to the CO for approval.

551.16 Measurement.

Delete paragraph two and replace it with the following paragraphs:

Measure furnished piles by the linear foot as given in the pile order list.

Measure driven piles by the linear foot from the final pile tip elevation to the cutoff elevation.

552 - Structural Concrete 552.02_nat_us_06_20_2007 Material

552.02 Add the following:

Anchor bolts717.01
Dowels717.17
Epoxy resin adhesives725.21
High strength non-shrink grout701.02
Mortar701.02
Portland cement701.01
Sealants, fillers, seal, and sleeves712.01

0. Composition (Concrete Mix Design).

Delete Tables 552-1, 2, and 3 and replace with the following:

Table 552-1 Composition of Concrete

Class of Concrete
Minimum Cement Content

(pound per cubic yard)

Maximum W/C Ratio
Slump (1)

(inches) Maximum Nominal Coarse Aggregate Size (5) (inches)

A
611
0.49
2 to 4
1½
A(AE)
611
0.44
1 to 4
1½
B
517
0.58
2 to 4
2½
B(AE)
517
0.58
2 to 4
2½
C
658
0.49
2 to 4
¾
C(AE)
658
0.44
1 to 3
¾
D(AE)(2)
611
0.40
1 to 3
1½
E(AE)(3)
611
0.40
4 to 6 (4)
¾
P (Prestressed)
658
0.44
0 to 4
1
P(AE)
658
0.44
0 to 4
1
Seal
658
0.54
4 to 8
1½

(1) Maximum slump is 8 inches if approved mix design includes a high-range water reducer.

(2) Concrete with a water reducing and retarding admixture conforming to AASHTO M 194, type D.

(3) A latex modified concrete with 0.037 gallons of modifier per pound of cement.

(4) Measure the slump 4 to 5 minutes after the concrete is discharged from the mixer.

(5) Meeting the processing requirements of AASHTO M43, Table 1 – Standard Sizes of Processed Aggregate.

(6) Use Class P (AE) concrete in the entire depth of the top flange of all multi-beam bridge girders. In lieu of this, Class P (AE) concrete may be used for fabrication of the entire girder, and throughout the entire depth of prestressed slabs. In all cases, furnish concrete meeting the 28 day specified minimum concrete strength requirements for the prestressed members as shown on the plans, unless otherwise specified.

Table 552-2 Minimum Air Content for Air Entrained Concrete Nominal Maximum Aggregate Size (1) As Delivered Minimum Air Content (2) (3) (%)

2½ inch
3.5
2 inch
3.5
1½ inch
4.0
1 inch
4.5
¾ inch
4.5
½ inch
5.5

(1) Meeting the processing requirements of AASHTO M 43, Table 1 – Standard Sizes of Processed Aggregate.

(2) These air contents apply to the total mix. When testing these concretes, aggregates larger than 1½ inches are removed by handpicking or sieving, and air content is determined on the minus 1½-inch fraction of the mix. Air content of the total mix is computed from the value determined on the minus 1½-inch fraction.

(3) For P(AE) concrete, the as delivered minimum air contents may be reduced 1.0 % and the maximum air content is 6.0 %

Table 552-3 Required Average Compressive Strength (1) Specified Compressive Strength (f’c) (psi) Required Average Compressive Strength (f’cr) (psi)

Less than 3000
f’c + 1000
3000 to 5000
f’c + 1200
Over 5000
1.10f’c + 700

(1) Use this table when there is not enough data available to establish a standard deviation

Delete the first paragraph after Table 552-2 and replace with the following:

Submit written concrete mix designs for approval at least 30 calendar days before production.

Add the following under the list of items to be included in the mix design submittal:

(y) Evaluation of potential aggregate reactivity

552.08 Delivery.

1. Truck mixer/agitator.

Add the following:

Do not exceed 130 total revolutions at mixing speed, including both initial mixing and remixing. Do not exceed 300 total revolutions, including both mixing and agitating speed.

0. Quality Control of Mix.

Add the following after the first paragraph:

At least 2 weeks prior to the start of concrete placement operations, arrange a pre-concrete placement conference. Coordinate attendance with the CO and any applicable subcontractors. Be prepared to discuss and/or submit the following:

(1) Proposed concrete placement schedule.

(2) Review approved concrete mix design and determination of batch weights.

(3) Discuss Section 153, Contractor Quality Control, minimum frequency schedule for process control sampling and testing (to be performed by the Contractor).

(4) Discuss batching, mixing, placing, and curing requirements.

(5) Discuss Subsections 106.03, Certification, and 106.05, Statistical Evaluation of Material for Acceptance.

552.11 Handling and Placing Concrete.

Add the following after the forth paragraph:

Use an approved form release agent to produce a minimum of staining, air holes, and hydration discoloration.

0. Construction Joints.

Add the following at the end of the first paragraph:

Provide form cleanout ports at construction joints.

552.18 Loads on New Concrete Structures.

Add the following paragraph:

Do not allow public traffic on the bridge until approaches, curbs, and bridge rail are completed and in-place. Erect barricades at each end of bridge spans when road approaches allow vehicles to drive directly onto the structure.

553 - Prestressed Concrete 553.02_nat_us_06_20_2007 Material

553.02 Material.

Add the following:

High strength non-shrink grout725.22 (c)
Load indicating washers717.01(f)
Mortar712.05
Structural steel555

553.03 Method Approval.

Delete the first paragraph and replace with the following:

Fabricate prestressed concrete members by pretensioning in a fabricating plant that is certified by the Prestressed Concrete Institute (PCI) for the type of pretensioning required by the contract. Submit a report for approval at least 30 days before starting prestressing that shows the following:

Add the following to the list of items to be submitted with the report:

(k) Calculations to validate supporting prestressed members while in storage or transit at locations different from those indicated on the contract drawings;

(l) Documentation and details for all desired changes or deviations from the contract.

Add the following paragraph after item (1):

To meet requirements of subsection 153.02 (b), all phases, furnish a Quality Control (QC) Report prepared by the fabricating plant upon delivery of the prestressed members to the job. Include certification that the quality and quantity of the furnished prestress members conforms to the contract. Affix the seal and signature of the professional engineer most directly responsible for the plant's quality control organization, whether a member of the QC organization or not, on the report.

553.05 Concrete.

Add the following after the first paragraph:

As a minimum use air-entrained Class P(AE) concrete according to Section 552 for the top 2 inches of the precast member.

Ensure that threaded inserts required by the contract develop the full tensile strength of the bars or bolts they secure. Provide lifting devices of adequate strength to safely lift the girders at locations shown in the contract or on the girder shop drawings, if different from the contract.

Delete the third paragraph and replace with the following:

Rough cast the top surface of members against which concrete will be cast . Finish surfaces to be covered with a waterproofing membrane deck seal to a smooth surface free of ridges and other projections. Finish surfaces that will be paved with an asphalt concrete wearing surface or that will not receive any wearing surface with a transverse stiff broom finish.

Add the following at the end of this subsection:

Submit all concrete cylinder test results and temperature curing records as part of the fabricating plant's QC report, except 28 day concrete strength test results may be submitted later when prestressed girders are authorized to be shipped before that date.

553.06 Tensioning.

Delete the last sentence in the eighth paragraph and replace with the following:

Stress and anchor prestressing steel at the initial stress called for by the approved stressing calculations.

553.07 Pretensioned Members.

(b) Releasing steel.

Paint cut ends of strands using an epoxy paint or a zinc-rich paint.

553.08 Storing, Transporting and Erecting.

Add the following at the end of the subsection:

Use high-pressure water blasting to remove all debris and paste in the keyways immediately prior to placing mortar. Remove all free-standing water and allow keyways to completely surface dry. Use mortar in keyways between multibeam members and to patch defects, blockouts, or other areas on the concrete roadway portion of the structure 1 inch or more in depth and over 1 inch in width. Patch smaller areas on the concrete roadway and set anchor bolts and dowels with high-strength, non-shrink grout.

Strike off exposed grout or mortared surfaces flush and apply the same surface texture finish as the surrounding concrete as soon as the grout or mortar has sufficiently set. Cure the grout or mortar in accordance with manufacturer’s recommendations.

Meet the requirements of AWS D1.1-Structural Welding Code when field welding.

554 - Reinforcing Steel 554.03_nat_us_06_20_2007 Construction Requirements

0. Order Lists.

Delete the first paragraph and replace with the following:

Do not submit order lists or bending diagrams for approval.

0. Placing & Fastening.

Delete the first sentence and replace with the following:

Place, fasten, and support the bars according to the CRSI Manual of Standard Practice. Use precast concrete blocks or metal supports, but only use precast mortar blocks in areas permanently hidden from view in the completed structure.

Measurement

554.11 Method.

Add the following to the end of the second paragraph:

Do not measure or include reinforcing steel fabricated into the prestressed member.

555 - Steel Structures 555.18_nat_us_07_03_2007 Construction Requirements

0. Welding.

Add the following at the start of the first sentence.

"Unless otherwise provided for in the supplemental specifications or shown on the plans, ... "

556 - Bridge Railing 556.01_nat_us_07_03_2007 Description

556.01

Prior to acceptance of the completed structure, clean the bridge and approach rail of all foreign matter, including dirt, cement paste and petroleum products, leaving these surfaces in the same condition as when they left the fabricator. Use hand tool, solvent and blast cleaning as required but use power tool cleaning only as approved.

Material.

556.02

Add the following:

Galvanized coating repair717.07
Structural steel tubing717.01(h)

0. Steel Railing.

Add the following at the beginning of the first sentence.

"Except as provided for in the supplemental specifications or shown on the plans, ... "

For galvanized rail, galvanize in accordance with AASHTO M111, and furnish nuts, bolts, and washers galvanized in accordance with AASHTO M 232. Repair minor abrasions, cuts and all damaged areas with a galvanized coating in accordance with 717.07.

611 – Water Systems

611.01 Description

Add the following:

This work also consists of furnishing and installing the water lines, pipe insulation and encasement pipe to the permanent structure as shown on the construction plans or as directed.

611.03 General.

Add the following:

Furnish insulation and encasement pipe and all other necessary components necessary for installation from the suppliers listed below or approved equal.

Material
Manufacturer
Remarks

Micro-Lok HP High Performance Fiber Glass Pipe Insulation Western Region & Canada P.O. Box 5108 Denver, CO 80217

(800) 368-4431 Fax: (303) 978-4661 PVC Insulation

Blue Brut C900 Water Pipe
JM Eagle

5200 West Century Boulevard Los Angeles, California 90045 Phone: (800) 621-4404 Encasement Pipe

611.03 General.

The Contractor is responsible for producing a design which will allow the utilities to be mounted on the structure. Final details of pipe sizing, insulation, and encasement pipe shall be submitted to the CO for review prior to installation. Only one type of insulation and encasement pipe shall be used in the project unless otherwise indicated in the construction plans.

612 – Sanitary Sewer Systems

612.01 Description

Add the following:

This work also consists of furnishing and installing the sewer lines, pipe insulation and encasement pipe to the permanent structure as shown on the construction plans or as directed.

612.03 General.

Delete the first sentence and add the following:

Furnish plastic sanitary sewer pipe.

611.03 General.

Add the following:

Furnish insulation and encasement pipe and all other necessary components necessary for installation from the suppliers listed below or approved equal.

Material
Manufacturer
Remarks

Micro-Lok HP High Performance Fiber Glass Pipe Insulation Western Region & Canada P.O. Box 5108 Denver, CO 80217

(800) 368-4431 Fax: (303) 978-4661 PVC Insulation

Blue Brut C900 Water Pipe
JM Eagle

5200 West Century Boulevard Los Angeles, California 90045 Phone: (800) 621-4404 Encasement Pipe

611.03 General.

The Contractor is responsible for producing a design which will allow the utilities to be mounted on the structure. Final details of pipe sizing, insulation, and encasement pipe shall be submitted to the CO for review prior to installation. Only one type of insulation and encasement pipe shall be used in the project unless otherwise indicated in the construction plans.

617 - Guardrail 617.02_nat_us_07_03_2007 Material 617.02

Galvanized coating repair 717.07

617.03 Posts.

Replace the first paragraph with the following:

Fabricate all timber components of guardrail as detailed in Subsection 557.04. Pressure treat all timber as detailed in Subsection 716.03, using creosote, pentachlorophenol (any solvent), ammoniacal copper zinc arsenate (ACZA), or chromated copper arsenate (CCA – Type A, B, or C) in conformance with AASHTO M 133. Provide grading certification and pressure treatment test results, and meet the Best Management Practices (BMP’s) requirements of Subsection 716.03. Field treat cuts or abrasions made in fabricated timber after treatment in accordance with Subsection 557.04.

617.04 Rail Elements.

(a) Steel rail.

Replace the third paragraph with the following:

Repair all scrapes, cuts and other damaged coating areas on galvanized surfaces that are through to the base metal with galvanized coating repair.

617.05 Terminal Sections.

Add the following to the end of the second sentence:

"... unless otherwise shown on the plans."

634 - Permanent Pavement Marking 634.03_nat_us_03_03_2005

634.03 General.

On single lane roads apply pavement markings according to the manufacturer’s recommendations and in a direction consistent with safe application.

635 - Temporary Traffic Control 635.03_nat_us_05_13_2004

635.03 General.

Install temporary traffic control signs to temporary posts or approved temporary sign mounts.

701 - Cement 701.02_nat_us_08_05_2009

701.02 Masonry and Mortar Cement.

(b) Mortar Cement.

Add the following:

Use this mortar in bridge deck and prestressed multi-beam girder keyways instead of high strength non-shrink grout; and, when approved, as a structural repair mortar.

Keep mortar in the original manufacturer's labeled containers until used. Protect as specified for Portland cement in 701.01. Do not use mortar after the expiration date shown on the container or 1 year from date of purchase, whichever date occurs first.

Store, mix, place and cure in accordance with the manufacturer's instructions; submit a copy in advance of use to the CO.

Furnish mortar that is a chemical action concrete of the magnesium ammonium phosphate family and requires no curing under ambient temperatures of 36° - 100° F. Require recommendation by its manufacturer specifically for use in prestressed concrete bridge member keyways that are to be part of the finished wearing and running surface of the bridge, subjected to normal roadway contaminants and conditions promoting wear of normal bridge deck concrete.

Typical properties of the mortar, when tested neat without aggregate, are as follows, except when noted:

· Compressive strength (ASTM C 109 modified) of 6000 psi at 24 hours at 72° F or above, and when used below 50° F, 5000 psi.

· Modulus of elasticity (ASTM C 469) at 7 and 28 days of 4177 ksi and 4554 ksi.

· Freeze-thaw durability (ASTM C 666, Procedure A Modified) of a relative dynamic modulus greater than 80 percent after 300 cycles.

· Scaling resistance to deicing chemicals (ASTM C 672) after 5 and 25 cycles at a rating of 0, shall show no surface scaling; after 50 cycles at a rating of 1.5 shall show only slight surface scaling.

· Sulfate resistance (ASTM C 1012) length change after 52 weeks shall be no greater than 0.9 percent.

· Coefficient of thermal expansion (CRD-C 39-81) when run with 1inch x 1 inch x 11 inch bars and neat mixes without aggregate, shall be within 10 percent of 7150 psi/degree Fahrenheit.

· Flexural strength (ASTM C 78 Modified) of 3 inch x 4 inch x 16 inch prisms shall be 3.8 550 psi at 24 hours for the mortar only, and 670 psi with 3/8 inch pea gravel.

Submit independent tests for the mortar recommended for use from 50° - 100° F, when used to fill test specimens conforming to the Government's bridge box beam test keyway, showing the following results:

· Lateral (horizontal) shear between adjacent members: Range of 14 k/ft of keyway

· Vertical shear between adjacent members: 16 k/ft of keyway

· Direct tension between adjacent members: 6 k/ft of keyway.

Submit independent tests for the mortar recommended for use from 36° - 50° F, when used to fill test specimens conforming to the Government's bridge box beam test keyway, showing the following results:

· Lateral (horizontal) shear between adjacent members: Range of 2.4 k/ft of keyway

· Vertical shear between adjacent members: 6 k/ft of keyway

· Direct tension between adjacent members: 4 k/ft of keyway.

Two products that meet these requirements are BASF/Master Builders Technologies Regular Set-45 [for use below 50° F] and Set-45 Hot Weather Formula [for use from 50° - 100° F].

Use Set-45 Hot Weather Formula in air temperatures from 50° - 100° F. Use Regular Set-45 only in air temperatures below 50° F. When used in temperatures below 36° F, use approved weather precautions designed to prevent the mortar from freezing. Except when used in bridge deck keyways and blockouts, Regular Set-45 may be extended by the addition of 20 pounds of washed and clean 3/8 inch minus pea gravel per 50 pound bag when placed in thicknesses over 1.5 inches, or when approved by the CO.

Unless using one of the two products…