Upper Silvis Lakes drawings.pdf

PDF 2 MB Posted

Attached to
RECOVERY Upper Silvis Lake Trail Reconstruction Federal contract opportunity
Solicitation number
AG-0489-S-10-0379
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Northwest

About this file

DRAWINGS

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY Upper Silvis Lake Trail Reconstruction, newest first.
File Type Posted
SOL S-10-0379 FINAL Silvis lake trail.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UPPER SILVIS LAKE TRAIL REHABILITATION

Index to Drawing Sheets

Sheet # Sheet Title

1 Vicinity Map

2 Aggregate Surfacing (Type AS)

3 Aggregate Surfacing with Base Course (Type ASB)

4 Aggregate Surfacing with Ditch (Type ASD)

5 Stone Pitching (Type SP)

6 Stone Riser Steps (Type SRS)

7 Stone Open Drain (Type SOD)

8 Stone Retaining Wall (Type SRW)

9 Full Bench Blasting

drawing list
vicinity map Layout1 (1)
AS
ASB
ASD.pdf
STONE_PITCHING SP (1)
SRS Layout1 (1)
SOD SOD (1)
stone_wall SRW (1)
blasting Layout1 (1)

File details come from the government source that posted it. Updated .