Wage Determination General Decision Number.docx

DOCX document 18 KB Posted

Attached to
Cold Water Ridge Visitor Center Window Replacement Federal contract opportunity
Solicitation number
AG-0489-S-10-0151
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Northwest

About this file

Davis Bacon WD

View the file

Other files for this federal contract opportunity

Other files attached to Cold Water Ridge Visitor Center Window Replacement, newest first.
File Type Posted
AG-0489-S-10-0151 VC Window Replacement Sol.docx DOCX document
Service Life and Replacement Cycles.docx DOCX document
CWR_WINDOW_WALL_VICINITY.pdf PDF
CWR_WINDOW_WALL_SITE.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: WA080048 02/12/2010 WA48

State: Washington

Construction Type: Building

County: Cowlitz County in Washington.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date 0 07/03/2009 1 07/17/2009 2 09/25/2009 3 11/06/2009 4 01/01/2010 5 01/15/2010 6 02/05/2010 7 02/12/2010

* ASBE0036-004 01/09/2010

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 35.41 17.08

BRWA0001-009 06/01/2008

Rates Fringes

BRICKLAYER.......................$ 31.12 13.80

CARP0003-011 06/01/2007

Rates Fringes

Carpenters: (Including Form work)............................$ 27.56 13.30

Zone Differential (Add up Zone 1 rates):

Zone 2 - $0.85 Zone 3 - 1.25 Zone 4 - 1.70 Zone 5 - 2.00 Zone 6 - 3.00

BASEPOINTS: ASTORIA, LONGVIEW, PORTLAND, THE DALLES, AND

VANCOUVER, (NOTE: All dispatches for Washington State Counties: Cowlitz, Wahkiakum and Pacific shall be from Longview Local #1707 and mileage shall be computed from that point.)

ZONE 1: Projects located within 30 miles of the respective city hall of the above mentioned cities ZONE 2: Projects located more than 30 miles and less than 40 miles of the respective city of the above mentioned cities ZONE 3: Projects located more than 40 miles and less than 50 miles of the respective city of the above mentioned cities ZONE 4: Projects located more than 50 miles and less than 60 miles of the respective city of the above mentioned cities.

ZONE 5: Projects located more than 60 miles and less than 70 miles of the respective city of the above mentioned cities ZONE 6: Projects located more than 70 miles of the respected city of the above mentioned cities

ELEC0970-003 01/01/2009

Rates Fringes

ELECTRICIAN......................$ 31.53 3%+9.59

ENGI0701-009 01/01/2010

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 37.27 11.50

GROUP 1A....................$ 39.13 11.50

GROUP 1B....................$ 41.00 11.50

GROUP 2.....................$ 35.64 11.50

GROUP 3.....................$ 34.65 11.50

GROUP 4.....................$ 33.71 11.50

GROUP 5.....................$ 32.60 11.50

GROUP 6.....................$ 29.61 11.50

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: LATTICE BOOM CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments

GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom

GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over

GROUP 2: BULLDOZERS: Bulldozer operator over 120,000 lbs and above; Bulldozer operator, twin engine; Bulldozer Operator,tandem, quadnine, D10, D11, and similar type;

HYDRAULIC CRANE: Hydraulic crane operator 90 tons through 199 tons (without luffing or tower attachment); LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; Operator, 30 tons but less than 150 tons; LOADERS:

Loader operator, 120,000 lbs. and above; HYDRAULIC HOES-EXCAVATOR: Excavator over 130,000 lbs.; HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment)

GROUP 3: BULLDOZERS: Bulldozer operator, over 70,000 lbs. up to and including 120,000 lbs.; HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment); LATTICE BOOM CRANES: Lattice Boom Crane-50 through 89 tons (and less than 150 feet boom);

HYDRAULIC HOES-EXCAVATOR: excavator over 80,000 lbs.

through 130,000 lbs.; LOADERS: Loader operator 60,000 and less than 120,000

GROUP 4: BULLDOZERS: Bulldozer Operator over 20,000 lbs and more than 100 horse up to 70,000 lbs; CRANE: Hydraulic Crane Operator, under 50 tons; LATTICE BOOM CRANE OPERATOR:

Lattice Boom Crane Operator, under 50 tons; HYDRAULIC HOES EXCAVATOR: Robotic Hydraulic backhoe operator, track and wheel type up to and including 20,0000 lbs. with any or all attachments; Excavator Operator over 20,000 lbs through 80,000 lbs.; LOADERS: Loaders Operator, front end and overhead, 25,000 lbs and less than 60,000 lbs; Rubber-tired dozers; Forklift-over 5 tons; Grader/Blade; DRILLING: Drill Operator over 20,000 lbs pullback; Scraper

GROUP 5: Roller Operator; BULLDOZERS: Bulldozer operator, 20,000 lbs. or less or 100 horse or less; HYDRAULIC HOES EXCAVATORS: Hydraulic Backhoe Operator, wheel type (Ford, John Deere, Case type); Hydraulic Backhoe Operator track type up to and including 20,000 lbs.; LOADERS: Loaders, rubber- tired type, less than 25,000 lbs; Compactor;

DRILLING; Churm Drill and Earth Boring Machine Operator;

Directional Drill Operator less than 20,000 lbs pullback

GROUP 6: CRANE: Oiler; LOADERS: (less than 1 cu yd.);

Forklift

Zone Differential (add to Zone 1 rates):

Zone 2 - $2.50 Zone 3 - $5.00

For the following metropolitan counties: MULTNOMAH;

CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA;

CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS

INDICATED:

All jobs or projects located in Multnomah, Clackamas and Marion Counties, West of the western boundary of Mt. Hood National Forest and West of Mile Post 30 on Interstate 84 and West of Mile Post 30 on State Highway 26 and West of Mile Post 30 on Highway 22 and all jobs or projects located in Yamhill County, Washington County and Columbia County and all jobs or porjects located in Clark & Cowlitz County, Washington except that portion of Cowlitz County in the Mt.

St. Helens "Blast Zone" shall receive Zone I pay for all classifications.

All jobs or projects located in the area outside the identified boundary above, but less than 50 miles from the Portland City Hall shall receive Zone II pay for all classifications.

All jobs or projects located more than 50 miles from the Portland City Hall, but outside the identified border above, shall receive Zone III pay for all classifications.

For the following cities: ALBANY; BEND; COOS BAY; EUGENE;

GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG

All jobs or projects located within 30 miles of the respective city hall of the above mentioned cities shall receive Zone I pay for all classifications.

All jobs or projects located more than 30 miles and less than 50 miles from the respective city hall of the above mentioned cities shall receive Zone II pay for all classifications.

All jobs or projects located more than 50 miles from the respective city hall of the above mentioned cities shall receive Zone III pay for all classifications.

IRON0029-007 07/01/2009

Rates Fringes

IRONWORKER (Reinforcing, structural and Ornamental).......$ 33.12 17.40

LABO0335-011 06/01/2008

Rates Fringes

LABORER (Mason Tender-Cement/Concrete)..........$ 29.58 8.40 LABORER (MasonTender-Brick)......$ 29.58 8.40

LABO0335-013 06/01/2008

Rates Fringes

Laborers:

ZONE 1:

GROUP 1....................$ 27.46 8.40

GROUP 2....................$ 28.06 8.40

GROUP 3....................$ 28.50 8.40

GROUP 4....................$ 28.88 8.40

GROUP 5....................$ 24.96 8.40

LABORERS CLASSIFICATIONS

GROUP 1: Form-Stripping

GROUP 2: Gunite; Chipping Guns

GROUP 3: Concrete Saw; Vibrating Plate

GROUP 4: Grade Checker

GROUP 5: Flaggers

ZONE DIFFERENTIAL (Add to Zone Rates): ZONE 2 - $0.65

ZONE 3 - 1.15

ZONE 4 - 1.70

ZONE 5 - 2.75

ZONE 1: Projects within 30 miles of the respective city hall.

ZONE 2: More than 30 miles but less than 40 miles from the respective city hall.

ZONE 3: More than 40 miles but less than 50 miles from the respective city hall.

ZONE 4: More than 50 miles but less than 80 miles from the respective city hall.

ZONE 5: More than 80 miles from the respective city hall.

BASE POINTS: GOLDENDALE, LONGVIEW, AND VANCOUVER

PAIN0055-013 07/01/2008

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 31.86 11.28

PAIN0055-014 10/01/2008

Rates Fringes

Painters:

Brush, Roller...............$ 19.69 7.14 Spray.......................$ 20.29 7.14

PAIN0055-015 06/01/2007

Rates Fringes

Painters:

HIGHWAY & PARKING LOT

STRIPER.....................$ 28.27 8.27

PAIN1236-005 10/01/2009

Rates Fringes

SOFT FLOOR LAYER (Including Vinyl and Carpet)................$ 26.08 10.85

PLAS0555-005 06/01/2009

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 28.87 15.59

Zone Differential (Add To Zone 1 Rates):

Zone 2 - $0.65 Zone 3 - 1.15 Zone 4 - 1.70 Zone 5 - 3.00

BASE POINTS: BEND, CORVALLIS, EUGENE, MEDFORD, PORTLAND,

SALEM, THE DALLES, VANCOUVER

ZONE 1: Projects within 30 miles of the respective city hall ZONE 2: More than 30 miles but less than 40 miles from the respective city hall.

ZONE 3: More than 40 miles but less than 50 miles from the respective city hall.

ZONE 4: More than 50 miles but less than 80 miles from the respective city hall.

ZONE 5: More than 80 miles from the respective city hall

PLUM0082-006 06/01/2007

Rates Fringes

PLUMBER (Including HVAC Pipe)....$ 35.55 15.32

ROOF0049-003 07/01/2009

Rates Fringes

ROOFER (Including Metal Roofs and Tearoff).....................$ 27.03 8.65

SFWA0699-006 01/01/2010

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 44.19 19.60

SUWA2009-021 05/22/2009

Rates Fringes

LABORER: Common or General......$ 19.22 4.31

LABORER: Handheld Drill.........$ 17.17 5.36

LABORER: Irrigation.............$ 11.58 0.00

LABORER: Landscape..............$ 11.08 0.00

LABORER: Pipelayer..............$ 17.25 4.40

OPERATOR: Backhoe...............$ 19.59 0.00

OPERATOR: Bobcat/Skid Loader....$ 22.05 7.35

OPERATOR: Concrete Pump.........$ 22.30 5.27

OPERATOR: Excavator.............$ 25.02 5.43

OPERATOR: Mechanic..............$ 24.33 4.33

OPERATOR: Oiler.................$ 23.76 8.71

OPERATOR: Roller................$ 19.08 0.00

OPERATOR: Screed................$ 19.08 0.00

PIPEFITTER.......................$ 23.88 6.62

SHEETMETAL WORKER, Including HVAC Duct Work...................$ 19.59 5.34

TILE SETTER......................$ 25.51 0.00

TRUCK DRIVER: Dump Truck........$ 11.87 0.00

TRUCK DRIVER: Semi-Trailer Truck............................$ 20.59 5.56

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .