amend2.doc

DOC document 97 KB Posted

Attached to
RECOVERY: Eagle Cap Wilderness Trails Maintenance Federal contract opportunity
Solicitation number
AG-0489-S-10-0090
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Northwest

About this file

Amendment 2 to Solicitation AG-0489-S-10-0090--This amendment changes the mileage on item 1.1c. Please return this amendment with your offer. Offers are still due at the Malheur Naitonal Forest by 4 30 pm on 2/22/2010.

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY: Eagle Cap Wilderness Trails Maintenance, newest first.
File Type Posted
EC_Award_Info.xlsx XLSX spreadsheet
amend1.doc DOC document
CONTRACT.docx DOCX document
BIDPKT.docx DOCX document
BIDPKT.docx DOCX document
ATTACHMENTS.doc DOC document
CONTRACT.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-0489-S-10-0090

Eagle Cap Wilderness Trails Maintenance—Amendment 2

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
CONTRACT ID CODE
PAGE OF PAGES

2 AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

02/04/2010

4. REQUISITION/PUCHASE REQ. NO.
5. PROJECT NO.(IF APPLICABLE)

6. ISSUE BY CODE

7.ADMINISTERED BY (if other than item 6) CODE

Wallowa-Whitman National Forest P.O. Box 907 Baker City, OR 97814

8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code)
X
9A.Amend Solicitation. AG-0489-S-10-0090

9B.Dated 01/11/2010

10A.Mod Contract/Order

10B.Dated (see Item 13)

code
facility code

11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION

[X] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [ ] is extended [X] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. This change order is issued pursuant to; (specifiy authority) The changes set forth in item 14 are made in the Contract/Order # in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..

C. This supplemental agreement is entered into pursuant to authority of:

D Other: (Specify type of modification and authority):

E. IMPORTANT: Contractor [ ] is not [ ] is required to sign this document and return _ Original to the issuing office.:

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible) Eagle Cap Wilderness Trails Maintenance—Wallowa-Whitman National Forest This amendment changes the mileage on 1.1c from 2.3 miles to 12.3 miles. These changes are indicated by vertical lines in the left margin. Please replace page 4 of 51 of the existing solicitation and page 4 of 27 of the existing bidder’s packet with the enclosed.

By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A.NAME AND TITLE OF SIGNER (Type or print)

16A.NAME AND TITLE OF CONTRACTING OFFICER

15B.CONTRACTOR/OFFEROR

By ______________________________ (Signature of person authorized to sign)

15C.DATE SIGNED

16B.UNITED STATES OF AMERICA

By______________________________ (Signature of Contracting Officer)

16C.DATE SIGNED

Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243

THIS PAGE HAS INTENTIONALLY BEEN LEFT BLANK.

19. ITEM NO
20. SCHEDULE OF SUPPLIES/SERVICES
21. QTY
22. UNIT
23. UNIT PRICE
24. AMOUNT
1
Bear Creek Vicinity
1.1
Bear Creek Trail #1653 Total Length
12.3
Mi
1.1a
Light to Moderate Logout & Maintenance 2010
10.00
Mi
$___________
$__________
1.1b
Heavy Logout & Maintenance 2010
2.3
Mi
$___________
$__________
1.1c
Brushing 2010
12.3
Mi
$___________
$__________
1.1d (Optional)
Logout & Maintenance 2011
12.3
Mi
$___________
$__________
1.2
Dobbin Creek Trail #1654 Total Length
3.40
Mi
1.2a
Light to Moderate Logout & Maintenance 2010
2.00
Mi
$___________
$__________
1.2b
Heavy Logout & Maintenance 2010
1.40
Mi
$___________
$__________
1.2c
Brushing 2010
3.40
Mi
$___________
$__________
1.2d (Optional)
Logout & Maintenance 2011
3.40
Mi
$___________
$__________
1.3
Miners Basin Trail #1671 Total Length
2.6
Mi
1.3a
Light to Moderate Logout & Maintenance 2010
2.6
Mi
$___________
$__________
1.3b
Heavy Logout & Maintenance 2010
0.00
Mi
$___________
$__________
1.3c
Brushing 2010
2.6
Mi
$___________
$__________
1.3d (Optional)
Logout & Maintenance 2011
2.6
Mi
$___________
$__________
1.4
Goat Creek Trail #1665 Total Length
7.10
Mi
1.4a
Light to Moderate Logout & Maintenance 2010
4.00
Mi
$___________
$__________
1.4b
Heavy Logout & Maintenance 2010
3.10
Mi
$___________
$__________
1.4c
Brushing 2010
7.10
Mi
$___________
$__________
1.4d (Optional)
Logout & Maintenance 2011
7.10
Mi
$___________
$__________

Contractor Name

DATE

Signature of Authorized Representative

THIS PAGE HAS INTENTIONALLY BEEN LEFT BLANK.

EAGLE CAP WILDERNESS TRAILS MAINTENANCE

19. ITEM NO
20. SCHEDULE OF SUPPLIES/SERVICES
21. QTY
22. UNIT
23. UNIT PRICE
24. AMOUNT
1
Bear Creek Vicinity
1.1
Bear Creek Trail #1653 Total Length
12.3
Mi
1.1a
Light to Moderate Logout & Maintenance 2010
10.00
Mi
$___________
$__________
1.1b
Heavy Logout & Maintenance 2010
2.3
Mi
$___________
$__________
1.1c
Brushing 2010
12.3
Mi
$___________
$__________
1.1d (Optional)
Logout & Maintenance 2011
12.3
Mi
$___________
$__________
1.2
Dobbin Creek Trail #1654 Total Length
3.40
Mi
1.2a
Light to Moderate Logout & Maintenance 2010
2.00
Mi
$___________
$__________
1.2b
Heavy Logout & Maintenance 2010
1.40
Mi
$___________
$__________
1.2c
Brushing 2010
3.40
Mi
$___________
$__________
1.2d (Optional)
Logout & Maintenance 2011
3.40
Mi
$___________
$__________
1.3
Miners Basin Trail #1671 Total Length
2.6
Mi
1.3a
Light to Moderate Logout & Maintenance 2010
2.6
Mi
$___________
$__________
1.3b
Heavy Logout & Maintenance 2010
0.00
Mi
$___________
$__________
1.3c
Brushing 2010
2.6
Mi
$___________
$__________
1.3d (Optional)
Logout & Maintenance 2011
2.6
Mi
$___________
$__________
1.4
Goat Creek Trail #1665 Total Length
7.10
Mi
1.4a
Light to Moderate Logout & Maintenance 2010
4.00
Mi
$___________
$__________
1.4b
Heavy Logout & Maintenance 2010
3.10
Mi
$___________
$__________
1.4c
Brushing 2010
7.10
Mi
$___________
$__________
1.4d (Optional)
Logout & Maintenance 2011
7.10
Mi
$___________
$__________

Contractor Name

DATE

CONTRACTOR INFORMATION

Signature of Authorized Representative

TIN: ____________________

DUNS: __________________

File details come from the government source that posted it. Updated .