AG-0489-S-10-0062_ocean-blvd-road_sectionj.pdf
PDF 3 MB Posted
- Attached to
- RECOVERY Ocean Blvd Road Reconstruction Federal contract opportunity
- Solicitation number
- AG-0489-S-10-0062
About this file
Section J Attachments (Drawings and Work Log)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| abstract_template-ocean-blvd.pdf | ||
| AG-0489-S-10-0062_ocean-blvd-solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Segment One 8.16 -7.203
ROAD NO. BMP EMP DESCRIPTION OF WORK
7544 8.16 7.203
Clear Alder with chainsaw out to 4' maximum width on both shoulders of road as needed to reestablish 14' wide X14' high traveled way. DO NOT GRUB STUMPS not encroaching in traveled way. Deck logs
8.160 8.160 Treat (fill in) water bar 10 cy additional
8.160 7.825 Spot rock 5 cy
7.825 7.825 Spot rock 10 cy
7.550 7.570 Reconstruct Prism 1' lift for 100' 57 cy
7.453 7.453 Reconstruct Road width of 14' Use Native Material + 20 cy
7.450 7.450 Install 24"x 30'cmp 10 cy
7.400 7.400 Treat water bar 10 cy
7.350 7.350 Spot rock 20 cy
7.300 7.300 Spot rock 15 cy
7.203 7.203 End Road Maintenance. Maintain 72" Trail Width & traveled way
157 cy borrow
OCEAN BOULEVARD ROAD RECONSTRUCTION
7544 WORK LOG
0.000 -3.950
ROAD NO. BMP EMP DESCRIPTION OF WORK
7540 8.400 Rock Source
0.840 1.030 Install 1'lift 14'wide 503 cy
0.940 0.940 Install 24"x40' cmp skew ahead < 2% grade Cl II fish stream 10cy Notify COR 48 hrs in advance of starting work
1.376 1.376
Remove crushed cmp- Install 48"x40' cmp, bed outlet 1' below streambed elevation at < or = 2% grade Backfill cmp 12" deep w native gravel, sized < or = Class I Riprap from MP 2.778 Class 1 fish stream 20cy borrow. Notify COR 48 hours in advance of starting work
2.329 2.329 Clean Inlet Ditch 2' wide from Outlet 40' ahead to existing channel fish
2.436 2.436 Repair Outlet 2' cmp
2.778 2.778 Armor Driveable Dip Class 3 Rip Rap 3 cy
2.778 2.906 Install 1'lift 14'wide 87 cy
2.807 2.807 Install 60"x40' cmp at existing stream grade skew ahead 20 cy
3.520 3.647 Install 1' lift 14' wide 379 cy
3.780 3.950 Install 1' lift 14' wide 507 cy
3.950 4.410 Reshape Road Prism, Reclaim rock pushed off.
4.410 End of Project
1526 cy borrow
OCEAN BOULEVARD ROAD RECONSTRUCTION
7544 WORK LOG