SF30AmendmentMod2Pages.pdf

PDF 131 KB Posted

Attached to
West Fork Ranger Station Water System Replacement Federal contract opportunity
Solicitation number
AG-03R6-S-17-0032
Issued by
Department of Agriculture Forest Service R1-Northern Region

About this file

Amendment 1 to Solicitation AG-03R6-S-17-0032

View the file

Other files for this federal contract opportunity

Other files attached to West Fork Ranger Station Water System Replacement, newest first.
File Type Posted
PreBidSiteVisitNotes_5.2.2017.pdf PDF
amended_DavisBacon_Wage_Determination.pdf PDF
Amend_Section_B_schedule_of_items_050817.pdf PDF
ModSeedSpec.pdf PDF
AmendDrawing050817_(002).pdf PDF
Specs_WFDistrReplace_010217.docx DOCX document
PlansVol1_010317.pdf PDF
AG-0343-S-17-0032-RFP_West_Fork_Water_System_Replacement.doc DOC document
PlansVol2_010317.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 1

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

1 5/18/2017

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

USDA, Forest Service Western Montana Acquisition Zone 24 Fort Missoula Road Missoula, MT 59804

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

AG-03R6-S-17-0032

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK

ONE

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return __ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TINA KELLY

Contract Specialist

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

5/18/2017

(Signature of person authorized to sign)

(Signature of Contracting Officer)

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

Page 2 of 2 Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT - Attachment to SF 30

CONTRACTOR: PROJECT:

West Fork Water System

Replacement

CONTRACT NUMBER: AG-03R6-S-17-0032 UNIT: Bitterroot National Forest

1) Amending Sheet G-2 (page 2 of 13) to reflect only the water distribution system that is part of this project. The water supply line from the water storage tank to the pump house has the line type un-bolded to clear up possible confusion. Additionally, eliminating the service connection to the cook house and replacing it with a frost free hydrant is depicted, as well as the actual service connection location at House #1012.

2) Amending Sheet W-4 (page 7 of 13) to reflect: 1) eliminating the service connection to the Cook House and replacing it with a frost free hydrant (which reduces the length of

1” HDPE pipe to 10 LF), and 2) properly illustrating the location of the actual service connection location at House #1012.

3) Adding Sheet D-4 (page 14 of 13) to show additional miscellaneous demolition items.

Three additional manholes are to be demolished. The first is a 15” diameter culvert by the Laundry House that is approximately 7 ft in depth. The second is a 36” diameter culvert by the corner of the Garage that is approximately 10 ft in depth. The third is a 36” diameter culvert by the Fire Cache this is approximately 11 ft in depth. A fire hose enclosure by House #1012 is to also be removed. The enclosure

(approximately 5 ft x 3 ft) is to be removed, all piping cut off 18” below grade, and covered with top soil to grade.

4) Amending the seed specification in Division 32 Exterior Improvements, Section

329000 Seeding and Mulching.

a. Part 2 – Products, 2.1 Seed. Delete in entirety and replace with seed mix in attached ModSeedSpec. Pdf.

b. Part 3 – Execution, 3.2 Seeding, A. Delete and replace with sow rates in attached ModSeedSpec.pdf.

5) Amending Section B, Schedule of Items, to reflect: 1) Pay Item 7, 1” HDPE Water

Distribution Line, reduced the quantity to 667 LF due to eliminating the service connection to the Cook House, and 2) Pay Item 13, Frost Free Hydrant, increased the quantity to 2 (two) due to the additional frost free hydrant at the Cook House.

6) Amending the Davis Bacon Wage Determination from Construction Building to

Construction Heavy, General Decision Number MT170061 04/07/2017 MT61. New

Wage Determination attached.

7) Amending the Disclosure of Magnitude of Construction Project from an estimated

$250,000 to $500,000 price range to an estimated $100,000 to $250,000 price range.

8) Extend the Solicitation Response Date to Tuesday, May 30, 2017 @ 2:00 pm MDT.

New Contract Total ---------------------> Contract Time

SUBMITTED

File details come from the government source that posted it. Updated .