J-5_UpperShieldsBridge_Plans.pdf

PDF 6 MB Posted

Attached to
GALLATIN NATIONAL FOREST - Shields River Bridge Replacement & Fish Barrier Construction Federal contract opportunity
Solicitation number
AG-0398-S-15-0012
Issued by
Department of Agriculture Forest Service R1-Northern Region

About this file

J-5 - Upper Shields Bridge Barrier Plans (signed cover on file GNF-ENG)

View the file

Other files for this federal contract opportunity

Other files attached to GALLATIN NATIONAL FOREST - Shields River Bridge Replacement & Fish Barrier Construction, newest first.
File Type Posted
Shields_River_Bridge_Replace_-_Pre_Bid_Attendees_ _Comments.pdf PDF
Amendment_1_-_AG-0398-S-15-0012_Shields_River_Bridges.pdf PDF
SF1442_Shields_River_Bridge_ _Fish_Barrier.pdf PDF
J-6_UpperShieldsBridge_Specs.pdf PDF
J-3_LowerShieldsBridgeBarrier_Plans.pdf PDF
AG-0398-S-15-0012_Shields_River_Bridge_ _Fish_Barrier.pdf PDF
J-4_LowerShieldsBridgeBarrier_Specs.pdf PDF
J-7_SF_24-98.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VICINITY MAP

T6N

R

E

R

E

T5N

T4N T5N

FOREST ENGINEER

REVIEWED:

DATE

CUSTER GALLATIN NATIONAL FOREST

FOREST SUPERVISOR

APPROVED:

DATE

CUSTER GALLATIN NATIONAL FOREST

REGIONAL ENGINEER

APPROVED:

DATE

NORTHERN REGION

LOCATION MAP

DISTRICT RANGER

RECOMMENDED:

DATE

YELLOWSTONE RANGER DISTRICT

R

E

R 9E

UPPER SHIELDS

BRIDGE 844-28.52

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE, REGION 1

CUSTER GALLATIN NATIONAL FOREST

PARK COUNTY, MONTANA

ROAD AND BRIDGE PLANS FOR:

UPPER SHIELDS RIVER

CULVERT REPLACEMENT

NFSR 844 MP 28.52

INDEX TO SHEETS

NO. DESCRIPTION

1 TITLE SHEET

ESTIMATED QUANTITIES & GENERAL

NOTES

PROJECT CONTROL, ROAD TYPICAL

SECTION AND POINTS

4 ROAD PLAN AND PROFILE

5 BRIDGE GENERAL LAYOUT

6 - 7 STREAM DETAILS

8 - 9 FOUNDATION PLAN & DETAILS

10 - 12 ABUTMENT DETAILS

XS1 ROAD CROSS SECTIONS

MATERIAL SOURCES

GOVERNMENT FURNISHED

Bridge Superstructure

Riprap

Crushed Aggregate

Waste Site

CONTRACTOR FURNISHED

Granular Backfill (for geocell)

UPPER SHIELDS

BRIDGE 844-28.52

SUNLIGHT

PIT

SHIELDS

CAMPGROUND

DRAWING NO. R2179

UPPER SHIELDS RIVER

CULVERT REPLACEMENT

REGION ONE

SUMMARY OF ESTIMATED QUANTITIES

MOBILIZATION15101 Lump SumLSQ

CRUSHED AGGREGATE, SURFACING, COMPACTION METHOD 2 (CONTRACTOR FURNISHED)30809 Cubic YardCQ

EQUIPMENT RENTAL, HYDRAULIC EXCAVATOR WITH THUMB62201 HourAQ

CONSTRUCTION SURVEYING AND STAKING15221 Lump SumLSQ

GENERAL NOTES

CQ = Contract Quantity; AQ= Actual Quantity; LSQ= Lump Sum Quantity

See Section 109.10 of the Forest Service Supplemental Specifications for METHOD definitions.

REMOVAL OF EXISTING 66"Ø CORRUGATED STEEL PIPE 20304 EachAQ 1

STRUCTURE EXCAVATION20806 Lump SumLSQ 1

57101 Lump SumLSQ 1TIMBER BRIDGE SUPERSTRUCTURE (GOVERNMENT FURNISHED) TRANSPORT AND ASSEMBLE

GEOCELL ABUTMENT STABILIZATION27201 Square YardCQ 27

PLACED RIPRAP, CLASS 3 MACHINE PLACED (GOVERNMENT FURNISHED)25101 Cubic YardCQ 120

EQUIPMENT RENTAL, LARGE DUMP TRUCK62202

SOIL EROSION AND POLLUTION CONTROL15713 LSQ 1Lump Sum

DEWATERING15730 LSQ 1Lump Sum

EachAQ 4OBJECT MARKERS63306

EachAQ 4GRADE CONTROL STRUCTURES, ROCK WEIR (GOVERNMENT FURNISHED)25150

PRECAST CONCRETE MEMBER, GRADE BEAM553A01 EachAQ 2

HourAQ 8

TREATED STRUCTURAL TIMBER & LUMBER, BEARING BLOCKS & BACKING PLANKS55703 MBFCQ 0.67

GABIONS, GALVANIZED25302 Cubic YardAQ 28

Linear FootAQ 36WOOD POSTS63305

Lump SumLSQ 1SEEDING, DRY METHOD (GOVERNMENT FURNISHED SEED)62503

EXISTING BRIDGE LOAD RATING

CONTROL POINT TABLE

CENTERLINE POINTS

UPPER SHIELDS RIVER

PROJECT CONTROL &

ROAD TYPICAL SECTION & POINTS

REGION ONE

PROJECT CONTROL

S

H

I

E

L

D

S

R

I

V

E

R

TYPICAL ROAD SECTION

ROAD PLAN & PROFILE

LEGEND

REGION ONE

PLAN

S

H

I

E

L

D

S

R

I

V

E

R

SECTION

BRIDGE GENERAL LAYOUT

REGION ONE

PLAN

ELEVATION

TYPICAL SECTION

S

H

I

E

L

D

S

R

I

V

E

R

OBJECT MARKER TYPE 3

LAYOUT POINTS

CULVERT REPLACEMENT

STREAM DETAILS

REGION ONE

PLAN

S

H

I

E

L

D

S

R

I

V

E

R

SECTION

SECTION

RIPRAP DETAILS

CULVERT REPLACEMENT

STREAM DETAILS

REGION ONE

PLAN

ROCK WEIR EXAMPLE

ROCK WEIR PLAN

ROCK WEIR SECTION A-A

F L O

W

NOTES:

FLOW

ROCK WEIR SECTION B-B

A A

B

B

SHIELDS

RIVER

CULVERT REPLACEMENT

FOUNDATION PLAN

REGION ONE

PLAN

S

H

I

E

L

D

S

R

I

V

E

R

SECTION ALONG C/L BEARING:

ABUTMENT NO. 1

UPSTREAM

END

DOWNSTREAM

END

60056005

60056005

SECTION ALONG C/L BEARING:

ABUTMENT NO. 2

UPSTREAM

END

DOWNSTREAM

END

WINGWALL ELEVATION

DEWATERING & SOIL EROSION CONTROL

FOUNDATION DETAILS

REGION ONE

TYPICAL FOUNDATION SECTION

STRUCTURE EXCAVATION NOTES:

STRUCTURE BACKFILL NOTES:

STRUCTURE EXCAVATION AND BACKFILL DETAIL

ABUTMENT DETAILS

REGION ONE

SECTION

ABUTMENT PLAN

ABUTMENT ELEVATION

CONNECTION ANGLE

ABUTMENT DETAILS

REGION ONE

SECTION B - B

ELEVATION

SECTION A -A

1/4

ELEVATION

OPTIONAL GRADE BEAM SPLICE DETAIL

A A

B B

SECTION C - C

ELEVATION

C C

GRADE BEAM PLAN

BEARING BLOCK PLAN

TIMBER NOTES

GABION DETAILS

REGION ONE

CONNECTING WIRES

TYPICAL ASSEMBLED GABION BASKET

TYPICAL INTERNAL CONNECTING WIRES

ALTERNATE TYING FASTENERS

SPIRAL BINDER

OPTIONAL INTERNAL

GABION NOTES

CONNECTION DETAIL

TYPICAL INSTALLATION

NFSR 844 MP ##.#

ROAD CROSS SECTIONS

UPPER SHIELDS RIVER

3203 Russell Street, Missoula, Montana 59801-8591

Phone 406/721-4320 Fax 406/549-6371

File details come from the government source that posted it. Updated .